Loading...
St Ann Catholic-LR061109REPORT OF REINFORCING STEEL OBSERVATION Irerracon Consulting Engineers & Scientists 8901 Carpenter Fry., Suite #100 Dallas, Texas 75247 !2141630 -1010 Date of Service: Client No.: Client: 11/09/06 106235 St Ann Catholic Church 180 Samuel Blvd Coppell, TX 75019 Report No.: 94061334.0015 Project No.: 94061334 Project: St. Ann Catholic Parish New Addition 180 Samuel Blvd. Coppell, TX Services: Observe placement of reinforcing for compliance with furnished drawings. PROJECT DATA Drawings Utilized: C3.2/C3.2, dated 10/03/06 Locations /Items Observed: Paving, N side, refer to attached sketch Test Method: Visual Observation REPORT OF OBSERVATION ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT Placing Drawings Approved X Bar Length and Shape X Column Tie Spacing & Type Bar Size X Proper Bar Placement X Stirrup Spacing & Type Bar Grade X Property Tied X Welded Splices Rebar Clean X Dowel Bars in Place X Mechanical Splices Trash & Debris Removed X Proper Bar Supports X Lapped Splices X Number of Bars X Proper Cover /Clearance X Discrepancies /Comments: No discrepancies were noted prior to completion of this observation. Field Results Report To: Technician: J. Rojas Report Distribution: (1) St Ann Catholic Church (1) City of Coppell TX (1) City of Coppell TX (1) Page Southerland Page (1) Techn i Structures (1) Pacheco Koch Consulting Engineers A. Sulent Ethem, P.G. Project Manager 309pdr This report is exclusively for the use of the client indicated above and shall not be reproduced without writterfapproval of Terracon. REPORT OF REINFORCING STEEL OBSERVATION Irerracan Consulting; Enpineers 8 Scientists 8901 Carpenter Fmy., Suite #100 Dallas, Texas 75247 (214) 630 -1010 Date of Service: 11/09/06 Client No.: 106235 Client: St Ann Catholic Church 180 Samuel Blvd Coppell, TX 75019 Report No.: 94061334.0015 Project No.: 94061334 Project: St. Ann Catholic Parish New Addition 180 Samuel Blvd. Coppell, TX NOT TO SCALE N