St Ann Catholic-LR061109REPORT OF REINFORCING STEEL OBSERVATION Irerracon
Consulting Engineers & Scientists
8901 Carpenter Fry., Suite #100
Dallas, Texas 75247
!2141630 -1010
Date of Service:
Client No.:
Client:
11/09/06
106235
St Ann Catholic Church
180 Samuel Blvd
Coppell, TX 75019
Report No.: 94061334.0015
Project No.: 94061334
Project: St. Ann Catholic Parish
New Addition
180 Samuel Blvd.
Coppell, TX
Services: Observe placement of reinforcing for compliance with furnished drawings.
PROJECT DATA
Drawings Utilized: C3.2/C3.2, dated 10/03/06
Locations /Items Observed: Paving, N side, refer to attached sketch
Test Method: Visual Observation
REPORT OF OBSERVATION
ITEMS OBSERVED
CORRECT
INCORRECT
ITEMS OBSERVED
CORRECT
INCORRECT
ITEMS OBSERVED
CORRECT
INCORRECT
Placing Drawings Approved
X
Bar Length and Shape
X
Column Tie Spacing & Type
Bar Size
X
Proper Bar Placement
X
Stirrup Spacing & Type
Bar Grade
X
Property Tied
X
Welded Splices
Rebar Clean
X
Dowel Bars in Place
X
Mechanical Splices
Trash & Debris Removed
X
Proper Bar Supports
X
Lapped Splices
X
Number of Bars
X
Proper Cover /Clearance
X
Discrepancies /Comments: No discrepancies were noted prior to completion of this observation.
Field Results Report To:
Technician: J. Rojas
Report Distribution:
(1) St Ann Catholic Church
(1) City of Coppell TX
(1) City of Coppell TX
(1) Page Southerland Page
(1) Techn i Structures
(1) Pacheco Koch Consulting Engineers
A. Sulent Ethem, P.G.
Project Manager
309pdr This report is exclusively for the use of the client indicated above and shall not be reproduced without writterfapproval of Terracon.
REPORT OF REINFORCING STEEL OBSERVATION Irerracan Consulting; Enpineers 8 Scientists
8901 Carpenter Fmy., Suite #100
Dallas, Texas 75247
(214) 630 -1010
Date of Service: 11/09/06
Client No.: 106235
Client: St Ann Catholic Church
180 Samuel Blvd
Coppell, TX 75019
Report No.: 94061334.0015
Project No.: 94061334
Project: St. Ann Catholic Parish
New Addition
180 Samuel Blvd.
Coppell, TX
NOT TO SCALE
N