Loading...
ST9902-LR061110 Concrete Compression Test Report eM J ENGINEERING, INC. 7636 Pebble Drive Fort Worth, Texas 76118 Tel: (~}J}..284::9400 Fax: (817) 589-9993 Report Distribution: (1) City of Coppell (1) City of Coppell (1) Tiseo Paving Company (1) Teague Nail & Perkins Client: City of Coppell Project: West Sandy Laiss--Road ReconstruciiOn "./ CMJ Report No.: 687-5192-171 Report Date: 12/01/2006 Strength Slump Air Content Concrete Temperature Ambient Temperature IZ/~' Specifications 3600 psi @ 28 Days 5 in max 3 % min 6 % max n/a 400 F min Placement Date Sampled By Weather Supplier/Mix Air Content Method Test Data 1 0/31/2006 Zach Hartgraves Clear/Cool On Site/ ASTM C231 Ticket Number: Slump: Concrete Temperature: Placement Location: Sample Location: N/A Time Batched: 008:15 Time Sampled: 08:30 3 in Air Content: 5.0 % Unit Weight: N/A 760 F Ambient Temperature: 680 F Yardage (c.y.): 30 of 370 Paving: Sandy Lake Rd/Freeport Intersection, Sta. 17+50, Sta. 35+00, Sta. 36+50 Westbound Sandy Lake Rd, 5' South of North Curb at Sta. 17+50 Concrete Compression Test Results Cylinder Age Max Load Area Stren8th Fracture Set # # Test Date (days) (Ibs. force) (sq.in.) (pSI Type 01 SLR10310601 11/03/2006 3 78080 28.18 2770 E-columnar 01 SLR1 031 0602 11/07/2006 7 97720 28.18 3470 E-columnar 01 SLR 10310603 11/28/2006 28 128380 28.09 4570 E-columnar 01 SLR 10310604 11/28/2006 28 127400 28.09 4540 E-columnar 01 SLR10310605 Hold 28 day average 4560 Normal cylinder size: 6" x 12" Field and laboratory tests by CMJ are per applicable ASTM Standards: C31, C39, C138, C143, C172, C1064, and C617 or C1231. o Gallons of Water Added On-Site ~Il&/ LIMITATIONS: The test results presented in this report apply only to the specific samples, te s, and areas described within this report. The test results do not pertain to any other samples, items or areas regardless of similarity. Our reports are produced solely for the exclusive use of our client. This report or any portion of this report may not be reproduced without the written consent of our client and CMJ Engineering, Inc. Page I of3 Concrete Compression Test Report eM J ENGINEERING, INC. 7636 Pebble Drive Fort Worth, Texas 76118 Tel: (817) 284-9400 Fax: (817) 589-9993 Client: Project: City of Coppell West Sandy Lake Road Reconstruction Report Distribution: (1) City of Coppell (1) City of Coppell (1) Tiseo Paving Company (1) Teague Nail & Perkins CMJ Report No.: 687-5192-171 Report Date: 12/01/2006 3 % min 6 % max n/a 400 F min Placement Date Sampled By Weather Supplier/Mix Air Content Method Test Data 10/31/2006 Zach Hartgraves Clear/Cool On Site/ ASTM C231 Strength Slump Air Content Concrete Temperature Ambient Temperature Specifications 3600 psi @ 28 Days 5 in max Ticket Number: Slump: Concrete Temperature: Placement Location: N/A Time Batched: 11:15 Time Sampled: 11:45 4.5 in Air Content: 5.0 % Unit Weight: N/A 700 F Ambient Temperature: 620 F Yardage (c.y.): 210 of 370 Paving: Sandy Lake Rd/Freeport Intersection, Sta. 17+50, Sta. 35+00, Sta. 36+50 Sample Location: Sta. 36+00, 3' North from Middle of Intersection Concrete Compression Test Results Cylinder Age Max Load Area Stren8th Fracture Set# # Test Date (days) (Ibs. force) (sq. in.} (pSI Type 02 SLR10310606 11/03/2006 3 77600 28.18 2750 C-cone/shear 02 SLR 10310607 11/07/2006 7 101500 28.18 3600 E-columnar 02 SLR10310608 11/28/2006 28 133360 28.09 4750 E-columnar 02 SLR10310609 11/28/2006 28 135240 28.09 4810 E-columnar 02 SLR10310610 Hold 28 day average 4780 Normal cylinder size: 6" x 12" Field and laboratory tests by CMJ are per applicable ASTM Standards: C31, C39, C138, C143, C172, C1064, and C617 or C1231. o Gallons of Water Added On-Site CMJ Engineering, 'rc R. Carl Lee, S.E.T. Vice President/CMT Manager LIMITATIONS: The test results presented in this report apply only to the specific samples, item and areas described within this report. The test results do not pertain to any other samples, items or areas regardless of similarity. Our reports are pro uced solely for the exclusive use of our client. This report or any portion of this report may not be reproduced without the written consent of our client and CMJ Engineering, Inc. 01 Page 2 on Concrete Compression Test Report eM J ENGINEERING, INC. 7636 Pebble Drive Fort Worth, Texas 76118 Tel: (817) 284-9400 Fax: (817) 589-9993 Client: Project: City of Coppell West Sandy Lake Road Reconstruction Report Distribution: (1) City of Coppell (1) City of Coppell (1) Tiseo Paving Company (1) Teague Nail & Perkins CMJ Report No.: 687-5192-171 Report Date: 12/01/2006 Strength Slump Air Content Concrete Temperature Ambient Temperature Specifications Test Data 3600 psi @ 28 Days 5 in max 3 % min 6 % max n/a 400 F min Placement Date Sampled By Weather Supplier/Mix Air Content Method 10/31/2006 Zach Hartgraves Cloudy/Windy On Site/ ASTM C231 Ticket Number: Slump: Concrete Temperature: Placement Location: Sample Location: N/A Time Batched: 13:10 Time Sampled: 13:45 5 in Air Content: 4,0 % Unit Weight: N/A 700 F Ambient Temperature: 650 F Yardage (c.y.): 320 of 370 Paving: Sandy Lake Rd/Freeport Intersection, Sta. 17+50, Sta. 35+00, Sta. 36+50 Sta. 41 +50, 3' West of East Tip of Curb Concrete Compression Test Results Cylinder Age Max Load Area stren~th Fracture Set# # Test Date (days) (Ibs. force) (sq.in.) (psi Type 03 SLR10310611 11/03/2006 3 93160 28.18 3310 E-columnar 03 SLR10310612 11/07/2006 7 114000 28.18 4040 E-columnar 03 SLR10310613 11/28/2006 28 140820 28.09 5010 E-columnar 03 SLR10310614 11/28/2006 28 142300 28.09 5070 E-columnar 03 SLR10310615 Hold 28 day average 5040 Normal cylinder size: 6" x 12" Field and laboratory tests by CMJ are per applicable ASTM Standards: C31, C39, C138, C143, C172, C1 064, and C617 or C1231. o Gallons of Water Added On-Site CMJ Engineering, Inc LIMITATIONS: The test results presented in this report apply only to the specific samples, items, and areas described within this report, The test results do not pertain to any other samples, items or areas regardless of similarity. Our reports are produced solely for the exclusive use of our client. This report or any portion of this report may not be reproduced without the written consent of our client and CMJ Engineering, Inc. Page 3 of3 Concrete Compression Test Report eM J ENGINEERING, INC. 7636 Pebble Drive Fort Worth, Texas 76118 Tel: (817) 284-9400 Fax: (817) 589-9993 Client: Project: City of Coppell West Sandy Lake Road Reconstruction Report Distribution: (1) City of Coppell (1) City of Coppell (1) Tiseo Paving Company (1) Teague Nail & Perkins CMJ Report No.: 687-5192-171 Report Date: 11/10/2006 1------- Strength Slump Air Content Concrete Temperature Ambient Temperature Specifications 3600 psi @ 28 Days 5 in max 3 % min 6 % max n/a Test Data 400 F min Placement Date Sampled By Weather Supplier/Mix Air Content Method 10/31/2006 Zach Hartgraves Clear/Cool On Site/ ASTM C231 Ticket Number: Slump: Concrete Temperature: Placement Location: Sample Location: N/A Time Batched: 008:15 Time Sampled: 08:30 3 in Air Content: 5.0 % Unit Weight: N/A 760 F Ambient Temperature: 680 F Yardage (c.y.): 30 of 370 Paving: Sandy Lake Rd/Freeport Intersection, Sta. 17+50, Sta. 35+00, Sta. 36+50 Westbound Sandy Lake Rd, 5' South of North Curb at Sta. 17+50 Concrete Compression Test Results Cylinder Age Max Load Area Stren)'th Fracture Set # # Test Date (days) (Ibs. force) (sq.in.) (psi Type 01 SLR10310601 11/03/2006 3 78080 28.18 2770 E-columnar 01 SLR 10310602 11/07/2006 7 97720 28.18 3470 E-columnar 01 SLR1031 0603 11/28/2006 28 01 SLR1031 0604 11/28/2006 28 01 SLR1031 0605 Hold Normal cylinder size: 6" x 12" Field and laboratory tests by CMJ are per applicable ASTM Standards: C31, C39, C138, C143, C172, C1064, and C617 or C1231. o Gallons of Water Added On-Site CMJ Engineering, In R. Carl Lee, S.E.T. Vice PresidentlCMT Manager LIMITATIONS: The test results presented in this report apply only to the specific samples, items, and areas described within this report. The test results do not pertain to any other samples, items or areas regardless of similarity. Our reports are produced solely for the exclusive use of our client. This report or any portion of this report may not be reproduced without the written consent of our client and CMJ Engineering, Inc. 01 Page I of 3 Concrete Compression Test Report eM J ENGINEERING, INC. 7636 Pebble Drive Fort Worth, Texas 76118 Tel: (817) 284-9400 Fax: (817) 589-9993 Client: Project: City of Coppell West Sandy Lake Road Reconstruction Report Distribution: (1) City of Coppell (1) City of Coppell (1) Tiseo Paving Company (1) Teague Nail & Perkins CMJ Report No.: 687-5192-171 Report Date: 11/10/2006 Strength Slump Air Content Concrete Temperature Ambient Temperature Test Data Specifications 3600 psi @ 28 Days 5 in max 3 % min 6 % max n/a 400 F min Placement Date Sampled By Weather Supplier/Mix Air Content Method 10/31/2006 Zach Hartgraves Clear/Cool On Site/ ASTM C231 Cylinder Age Max Load Area Set # # Test Date (days) (Ibs. force) (sq.in.) 02 SLR1031 0606 11/03/2006 3 77600 28.18 02 SLR1031 0607 11/07/2006 7 101500 28.18 02 SLR1 031 0608 11/28/2006 28 02 SLR10310609 11/28/2006 28 02 SLR10310610 Hold Ticket Number: Slump: Concrete Temperature: Placement Location: Sample Location: N/A 4.5 in 700 F Paving: Time Batched: 11:15 Time Sampled: 11:45 Air Content: 5.0 % Unit Weight: N/A Ambient Temperature: 620 F Yardage (c.y.): 210 of 370 Sandy Lake Rd/Freeport Intersection, Sta. 17+50, Sta. 35+00, Sta. 36+50 Sta. 36+00, 3' North from Middle of Intersection Concrete Compression Test Results Strength (psi) 2750 3600 Fracture Type C-cone/shear E-columnar Normal cylinder size: 6" x 12" Field and laboratory tests by CMJ are per applicable ASTM Standards: C31, C39, C138, C143, C172, C1064, and C617 or C1231. o Gallons of Water Added On-Site CMJ Engineering, Inc LIMITATIONS: The test results presented in this report apply only to the specific samples, items, and areas described within this report. The test results do not pertain to any other samples, items or areas regardless of similarity. Our reports are produced solely for the exclusive use of our client. This report or any portion of this report may not be reproduced without the written consent of our client and CMJ Engineering, Inc. 01 Page 2 of 3 Concrete Compression Test Report eM J ENGINEERING, INC. 7636 Pebble Drive Fort Worth, Texas 76118 Tel: (817) 284-9400 Fax: (817) 589-9993 Client: Project: City of Coppell West Sandy Lake Road Reconstruction Report Distribution: (1) City of Coppell (1) City of Coppell (1) Tiseo Paving Company (1) Teague Nail & Perkins CMJ Report No.: 687-5192-171 Report Date: 11/10/2006 n/a 400 F min Placement Date Sampled By Weather Supplier/Mix Air Content Method Test Data 10/31/2006 Zach Hartgraves CloudylWindy On Site/ ASTM C231 Strength Slump Air Content Concrete Temperature Ambient Temperature Specifications 3600 psi @ 28 Days 5 in max 3 % min 6 % max Ticket Number: Slump: Concrete Temperature: Placement Location: N/A Time Batched: 13:10 Time Sampled: 13:45 5 in Air Content: 4.0 % Unit Weight: N/A 700 F Ambient Temperature: 650 F Yardage (c.y.): 320 of 370 Paving: Sandy Lake Rd/Freeport Intersection, Sta. 17+50, Sta. 35+00, Sta. 36+50 Sample Location: Sta. 41 +50, 3' West of East Tip of Curb Concrete Compression Test Results Cylinder Age Max Load Area Set # # Test Date (days) (Ibs. force) (sq.in.) 03 SLR1 031 0611 11/03/2006 3 93160 28.18 03 SLR10310612 11/07/2006 7 114000 28.18 03 SLR10310613 11/28/2006 28 03 SLR10310614 11/28/2006 28 03 SLR10310615 Hold Strength (psi) 3310 4040 Fracture Type E-columnar E-columnar Normal cylinder size: 6" x 12" Field and laboratory tests by CMJ are per applicable ASTM Standards: C31, C39, C138, C143, C172, C1064, and C617 or C1231. o Gallons of Water Added On-Site R. Carl Lee, S.E.T. Vice President/CMT Manager LIMITATIONS: The test results presented in this report apply only to the specific samples, items, an~ areas described within this report. The test results do not pertain to any other samples, items or areas regardless of similarity. Our reports are produced solely for the exclusive use of our client. This report or any portion of this report may not be reproduced without the written consent of our client and CMJ Engineering, Inc. 01 Page 3 of3 CMJ Engineering, 'nc