Loading...
ST0301-CS060331 \! J,\ i I ~j J I v' 9 i~ 0 ( .- r .'. 1 , .)), , 1) '\. ('1. , '( \ !i <"' '~ J .---- --- \ '- -- JAMES L. At TSTAETTE~ P.E 5TEPHEN ) COONAN. P.L PEGGy W GLASS. Ph.D. DAVID A. GlJOAL P.f SETTY l.JORDAN.P.E. ALAN H PlUMMER.JR_P.E.DH RICHARD H. Sl'WTH, P.E AlAN Il nJCl(~ PE il '~ .120 SOUTH UNMRSlTv DRlVf SUITt lOO FORTWORTH.TrXAS 7610M737 PHON{ 8.1._.1_ METRO 817-870.25+4 FAX 811.870.2516 www~.cnn' ENVlRONt.fCNTAl fNGINFFRS . OCStQM::.RS . SCIFNT1STS 816-0202 March 31, 2006 Mr. Ken Laterza U.S. Army Corps of Engineers Environmental Division, Regulatory Branch CESWF-EV-R P.O. Box 17300 Fort Worth, Texas 76102-0300 Re: Modification of Tributary G-I Downstream of Bethel Road West USACE Project No.: 200400181 Dear Mr. Laterza: The deed restriction of the stream mitigation area required under condition 2 of the permit letter for the modification of Tributary G-l has been delayed due to ongoing negotiations by the City of Coppell to acquire the property necessary to construct the channel modifications. The City is working to acquire the land required outright rather than as a drainage easement They have met with the two remaining property owners with whom contracts are needed and are continuing to negotiate a land swap with one owner and an outright purchase from the second. The schedule for the Bethel Road West project has been delayed due to coordination efforts between the City of Coppell and the City of Grapevine on construction of the project and the fact that the other main route into town (Sandy Lake Road) is under construction until November 2006. Current schedule for the Bethel Road West project includes advertising for bids in July 2006. Submitted below in Table I is an updated timeline and schedule for the Bethel Road West project. TABLE 1. TIMELINElSCHEDULE OF CONSTRUCTION EVENTS Date Started Rights-of- Way On-going and Recorded A '1 2007 Date Com leted July 2006 March 2007 A .12007 @ Mr. Ken Laterza Page 2 March 31, 2006 The City wishes to request a modification to condition 2 of the permit letter so that a draft deed restriction is required to be submitted to the USACE for review and approval, and the recording of the USACE approved deed restriction with the County Clerk is completed prior to commencement of any ground-disturbing activity within the jurisdictional reach of the waters of the United States. Based on the current anticipated schedule, submittal of the draft deed restriction to the USACE for review and approval should be possible by July 1, 2006. If you have any questions, please give me a call at (979) 694-7619 (office) or (817) 845-3280 (mobile). Very truly yours, ALAN PLUMMER ASSOCIATES, INC. ?J\~ ~./)1shd Loretta E. Mokry Project Manager Attachment cc: Ms. Suzan Taylor, City of Coppell