Loading...
Park West CC(03-2)-CS061101MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING To: Memo to File From: Larry ion Inspector Date: Novem 6 RE: Park West Commerce Center, Lot 1R Block 2 Daryl Flood Warehouse, Phase 2 As of this date, the paving on this project has been completed to our specifications. This being a private project and having no work in the City's right -of -way or easements, no maintenance bonds or record drawings are required. "CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN"