RE: Vista Point II /Lot 4, Phase 2
Construction Plan Review Comments
Dear Mr. Dench:
The City of Coppell has reviewed the referenced plans and has the following comments to offer:
Paving Plan —
1. Show FDC and hydrants on paving plan.
2. Minimum paving section for parking is 5" with lime stabilized subgrade or 6" without lime
with submission of a variance request letter.
Please make the necessary changes and submit three sets of final construction plans for the City
Engineer's stamp and as many copies as necessary for your contractors' construction operations.
All contractors and subcontractors onsite must have a copy of the plans stamped and approved
by the City of Coppell.
Because fees have already been paid for this project, we will consider this a plan revision only
and no additional fees will be collected. Please complete the permit form attached only if the
work will be performed by a different contractor.
If you have any questions, please contact this office at your convenience.
Sincerely,
Keith R. Marvin, P.E.
Assistant City Engineer