Loading...
Freeport NIP(2.94)-CS061120DUKE CONSTRUCTION 5495 Belt Line Road, Suite 360 - Dallas, TX 75254 Phone: 972 - 361 -6700 Fax: 972 -361 -6800 TO: Attn The City of Coppell 255 Parkway Blvd Coppell, TX 75019 Engineering Department Ken Griffin WE ARE SENDING YOU: LETTER OF TRANSMITTAL DATE: November 20, 2006 JOB NUMBER: FPNO13 -000 JOB NAME: Freeport Building VIII VIA: Delivery ❑ SHOP DRAWINGS ❑ PRINTS ❑ SAMPLES ❑x PLANS ❑ COPY OF LETTER ❑ CHANGE ORDER ❑ SPECIFICATIONS ❑x OTHER (see below) ITEM NO. DATE COPIES DESCRIPTION ACTION 1 11 -20 -06 1 Early Grading /Excavation Permit Application H 2 11 -20 -06 1 Tree Removal Permit Application H 3 11 -20 -06 1 NOI H 4 11 -20 -06 1 Hold Harmless Letter H 5 11 -20 -06 1 Copy of Earthwork Contract - Value H 6 11 -20 -06 1 Check for 2 %' of Earthwork Contract H 7 3 Civil Drawings to follow under separate cover from Pacheco Koch Consulting Engineers H THESE ARE TRANSMITTED AS CHECKED BELOW: ❑ A. Reviewed ❑ D. Rejected ❑ G. Return —corrected prints ❑ J. For your estimating use ❑ B. Make corrections as noted ❑ E. Resubmit _ copies for approval ❑x H. For approval ❑ K. For review and comment ❑ C. Returned for corrections ❑ F. Submit —copies for distribution ❑ I. For your files and /or job use ❑ L. Other (see below) REMARKS Please find attached our Early Grading /Excavation Permit Submittal for the Freeport VIII project. If you have any questions or comments please do not hesitate to call me at 214- 361 -6706 or on my cell at 214 - 336 -2923. Regards, Brian A. Pierce — Preconstruction /Project Manager Signed: Brian A. Pierce, Preconstruction /Project Manager cc: Job File (1)