Vista Ridge L5-CS060721T H E G I T Y O F
COFFELL
s
July 21, 2006
Bill Anderson, P.E.
Dowdey, Anderson & Associates, Inc.
5225 Village Creek Drive, Suite 200
Plano, TX 75093 Fax: 972/931 -9538
RE: Vista Ridge Addition, Lot 5, Block D
Final Walk -thru
Dear Mr. Anderson:
FILE
Please be advised that a walk - through has been scheduled for Tuesday, July 25th at 9 a.m.
for the water, sanitary sewer, paving and drainage facilities in the referenced project.
Please ensure that all facilities are clean and accessible at that time and that contractor's
representatives are present to assist with the inspection.
Your cooperation in this effort is greatly appreciated. If you should have any questions,
please call 972- 304 -7044 at your earliest convenience.
Sincerely,
Keith Marvin, P. E.
Assistant City Engineer
Office Phone: (972) 304 -7044
Fax: (972) 304 -3570
cc: Ken Griffin, P.E., Dir. of Engineering & Public Works
Glenn Hollowell, P.E., Asst. Dir. of Public Works
Lee Stone, Commercial Building Inspector
Tim Oates, Fire Marshal
Larry Davis, Construction Inspector
2 5 5 PARKWAY * P.O _ R O X 9478 * C C P P E L L IX 7 50 1 9 * T E I. 972/4r2 0022 * FAX 972/304 3673
From: Keith Marvin
To: Corder, Michael; Ingram, Debbie; Jones, Greg; Makela, Mike; Marvin, Keith; Oates,
Tim; Stone, Lee
Date: 7/21/2006 1:11:39 PM
Subject: Final inspection
A final inspection has been scheduled for Lot 5, Block D, Vista Ridge Addition (The Plaza) for Tuesday
July 25, 2006 at 9:00am.
Please ensure the appropriate people from your division are notified to attend.
Thank you.
Keith R. Marvin, P.E.
City of Coppell
(972) 304 -7044
kmarvin @ci.coppell.tx.us
CC: Birdsall, Per; Crocker, Paula; Duff, Ted; Dye, Carol