SS9301-SY 940921SS ?3 -°/ reed engineering GE3MQ)Mp GEOTECHNICAL CONSULTANTS September 21, 1994 Project No. 1998 City of Coppell Engineering Department P.O. Box 478 Coppell, Texas 75019 ATTN: Mr. Ken Griffin, P.E. Re: Supplemental Recommendations Slope Stability Analysis Grapevine Creek - Beltline Road at Mockingbird Lane Coppell, Texas Gentlemen: For reasons of constructibility and economy, consideration is being given to substituting an additional row of piers for the proposed shear key at the toe of the slope. Supplementary recommendations associated with this alternative are discussed herein. These recommendations are applicable considering that all other remedial measures proposed in the geotechnical report are carried out. The area between the proposed 33 -inch diameter piers and the toe of the slope should be over - excavated and recompacted as outlined in the Earthwork section of the geotechnical report. The excavation should extend at least one foot into unweathered shale below the bentonite seam Considering that this is accomplished, the lower portion of the slope may be stabilized by a single row of 18 -inch diameter concrete piers. A minimum of 12 piers on maximum 8 -foot horizontal centers is recommended. The center line of the piers should approximately parallel the slope break between the lower and upper slope. The piers should be founded a minimum of six feet into unweathered shale below the bentonite seam The top of the piers should extend to Elev. 446 or higher. The piers should be reinforced with 1 -1/2 percent steel throughout their full depth. Plate 17 of the geotechnical report has been modified to reflect the alternative discussed above and is attached hereto. The remedial measures proposed herein, as well as within the geotechnical report, are applicable for stabilization of the existing landslide at the referenced site. It has been observed that erosion is occurring at the toe of the slope upstream of the existing landslide. The presence of several trees in the lower 2424 STUTZ DRIVE ■ SUITE 400 ■ DALLAS, TEXAS 75235 ■ 214/350 -5600 ■ (FAX) 214/350 -0019 City of Coppell Project No. 1998 September 21, 1994 Page 2 portion of the upstream slope has prevented a slide from occurring in this area to this date. However, some of these trees are in the process of being undercut by stream erosion at the toe. If erosion of the toe continues unchecked, it is possible that new slides could develop upstream of the existing landslide in the future. This is of particular concern if the trees along the edge of the bank are undercut by erosion. Consideration should, therefore, be given to providing some means of erosion protection along the toe of the bank upstream of the existing landslide. We trust this information will be sufficient for your use. Should you have any questions concerning our findings or if you desire additional information, please do not hesitate to call. Sincerely, REED YyNGINEERING GROUP, INC. F. i y Smith, P.G. z resident Ronald F. Reed, P.E. Principal Engineer FWS /RFR /aap copies submitted: X2) City of Coppell /Mr. Ken Griffin, P.E. (1) Craig Olden, Inc. /Mr. Craig Olden NOTES: 1. Excavate min. 1' into undisturbed soil at back of slide, and min. 1' into unweathered shale below bentonite seam along base of slide. BacXfill in accordance with Earthwork section of report. ELEV. (feet) 470- LIMITS OF EXCAVATION 460 1' MAX. 1 450 APPROX: TOP UNWEATHERED SHALE 3.5 . 1 1 C O MIN. 5% SLOPE 3. Construct min. 2' -thick drainage blanket with durable crushed stone (ASTM C -33, Size 67 or coarser) wrapped in filter fabric (ADS 600, or equivalent) . 4. Install min. 6" dia. perforated drainage pipe (ADS N -12, or equivalent) at base of drainage blanket. 5. Tee min. 6" dia. solid drainage pipes (ADS N -12, or equivalent) into perforated drainage pipe on max. 12' horizontal centers. Slope solid drainage pipes min. 5% to discharge at toe of slope approx. 1' above "normal" creek flow level. 6. Install three rows of 33" dia. concrete piers, seven piers per row. Space piers 12' on center, offsetting adjacent rows by 6'. Space each row 8' on center (See Plate 18 for plan layout of piers) . Minimum penetration - 6' into unweathered shale. Top of piers to be at El. 450 or higher. Reinforce piers with 1 -1/2% steel. 7. Regrade slope to approx. pre -slide topography. Cover regraded slope with erosion control fabric (BonTerra S2, or equivalent) and revegetate. 8. Install 9" gabion mattress on lower slope up to El. 450 or EL. 450 higher. Extend mattress min. 6' beyond toe of slope, and min. 1.75 ; 10' beyond ends of slide. Anchor mattress as necessary. L 440 \— APPROX. ELEVATION �1 (I I - ( ( = 1 ( i ( = i i I (f = I (� I ���� N��A\( OF BENTONITE SEAM 6' MIN. 430 0 5' 10' 20' (Idealized Section - Not for Construction) x H �I ecn o � , 3 6&f VVJ I AS4aV o AC 0 1 H J s . G ul r► he b f' �_ J0 cfe ,--- 5 t0fJ:_> . 6` I Li 6 ,ray s W - �(��z►ioY, -fhz Z