Loading...
ST9902-LR061116 eM J ENGINEERING, INC. 7636 Pebble Drive Fort Worth, Texas 76118 7) 284-9400 Fax: (817) 589-9993 Concrete Compression Test Report Client: Project: City of Coppell West Sandy Lake Reconstruction Report Distribution: (1) City of Coppell (1) City of Coppell (1) Tiseo Paving Company (1) Teague Nail & Perkins CMJ Report No.: 687-5192-182 Report Date: 12/07/2006 Strength Slump Air Content Specifications 3600 psi @ 28 Days 5 in max 3 % min 6 % max n/a Test Data Concrete Temperature Ambient Temperature 400 F min Placement Date Sampled By Weather Supplier/Mix Air Content Method 11/06/2006 Robert McElvany Cloudy/Breeze Redi Mix/732 ASTM C231 Ticket Number: Slump: Concrete Temperature: Placement Location: 179559 Time Batched: 09:52 Time Sampled: 10:45 4 in Air Content: 4.0 % Unit Weight: N/A 720 F Ambient Temperature: 660 F Yardage (c.y.): 10 of 10 Paving: Stamped and Dyed Concrete at Intersection of Sandy Lake Rd and Sandy Lake/121 Distribution Center Entrance Paving: Stamped and Dyed Concrete at Intersection of Sandy Lake Rd and Sandy Lake/121 Distribution Center Entrance Sample Location: Concrete Compression Test Results Cylinder Age Max Load Area Stren8th Fracture Set# # Test Date (days) (Ibs. force) (sq.in.) (pSI Type 01 SLR11060601 11/13/2006 7 107480 28.09 3830 E-columnar 01 SLR11060602 12/04/2006 28 140780 28.18 5000 E-columnar 01 SLR11060603 12/04/2006 28 142760 28.18 5070 E-columnar 01 SLR11060604 Hold 28 day average 5040 Normal cylinder size: 6" x 12" Field and laboratory tests by CMJ are per applicable ASTM Standards: C31, C39, C138, C143, C172, C1064, and C617 or C1231. o Gallons of Water Added On-Site i1r . i f1 (,'I, l~" ~ CMJ Engineering, 'nc LIMITATIONS: The test results presented in this report apply only to the specific samples, items, and areas described within this report. The test results do not pertain to any other samples, items or areas regardless of similarity. Our reports are produced solely for the exclusive use of our client. This report or any portion of this report may not be reproduced without the written consent of our client and CMJ Engineering, Inc. 01 Page I of I Concrete Compression Test Report eM J ENGINEERING, INC 7636 Pebble Drive Fort Worth, Texas 76118 Tel: (817) 284-9400 Fax: (817) 589-9993 Client: Project: City of Coppell ~ West Sandy Lake Roar Reconstruction Report Distribution: (1) City of Coppell (1) City of Coppell (1) Tiseo Paving Company (1) Teague Nail & Perkins CMJ Report No.: 687-5192-182 Report Date: 11/16/2006 Specifications Test Data Strength Slump Air Content Concrete Temperature Ambient Temperature 3600 psi @ 28 Days 5 in max 3 % min 6 % max n/a 400 F min 11/06/2006 Robert McElvany Cloudy/Breeze Redi Mix/732 ASTM C231 Placement Date Sampled By Weather Supplier/Mix Air Content Method Ticket Number: Slump: Concrete Temperature: Placement Location: Sample Location: 179559 Time Batched: 09:52 Time Sampled: 10:45 4 in Air Content: 4.0 % Unit Weight: N/A 720 F Ambient Temperature: 660 F Yardage (c.y.): 10 of 10 Paving: Stamped and Dyed Concrete at Intersection of Sandy Lake Rd and Sandy Lake/121 Distribution Center Entrance Paving: Stamped and Dyed Concrete at Intersection of Sandy Lake Rd and Sandy Lake/121 Distribution Center Entrance Concrete Compression Test Results Cylinder Age Max Load Area Stren8th Fracture Set# # Test Date (days) (Ibs. force) (sq.in.) (pSI Type 01 SLR11060601 11/13/2006 7 107480 28.09 ~ E-columnar 01 SLR11060602 12/04/2006 28 01 SLR11060603 12/04/2006 28 01 SLR11060604 Hold Normal cylinder size: 6" x 12" Field and laboratory tests by CMJ are per applicable ASTM Standards: C31, C39, C138, C143, C172, C1064, and C617 or C1231. fiJ o Gallons of Water Added On-Site rile- /ttZ'~/C( CMJ Engineering, 'nc LIMITATIONS: The test results presented in this report apply only to the specific samples, items, and are described within this report. The test results do not pertain to any other samples, items or areas regardless of similarity. Our reports are produced solely for the exclusive use of our client. This report or any portion of this report may not be reproduced without the written consent of our client and CMJ Engineering, Inc. o I Page I of I