Loading...
DR8601-CS 860203February 3, 1986 Mr. Wayne Ginn, P.E. Ginn, Inc. 16135 Preston Road Suite 106 Dallas, Texas 75248 RE: Drainage Ditch failure in Parkwood Subdivision, Coppell, Texas Dear Mr. Ginn: At the request of Mr. Ed Powell, Coppell City Engineer, I am once again contacting you regarding the drainage ditch failure in our Parkwood Subdivision. I would like to meet on-site with you or an engineer from your office by February 11. The purpose of this meeting will be to determine what has caused the present situation. I have collected the soils tests and construction plans associated with the channel and will be able to present them at our meeting. Since there is a risk of losing adjacent improvements and because of our construction schedule for Parkwood III, I would like to have this meeting at your earliest convenience. I would then appreciate it if your office would contact Mr. Powell regarding your findings from the investigation. I will make myself available at any time convenient for you or your staff. SH/jf Sin ee_r. fl.l~/~ Projec~t Mafiager CC: Mr. Ed Powell Mr. Frank Proctor Mr. Jeff Hawkins Mr. Tom Wise Mr. Sam Wyse, III 15301 Dallas Parkway, Suite 1020 ! Dallas, Texas 75248 / (214) 392-9200