Loading...
Creekview Add PD-CS060321Keith Marvin -Proposed New Landscape Islands for Creekview From: "Mike Tanner" <miketanner@dfwrealestate.ws> To: <kmarvin@ci.coppell.tx. us> _ Date: 3/21/2006 2:41:10 PM '`--''~~~ Subject: Proposed New Landscape Islands fo Creekview SJJ ~ ~ l,,~r~ Keith Attached is a bid sheet I gave to the contractors who are bidding this. Also is an aerial photo where I marked (not to scale) about where the islands will go. Thanks for your help on this. Michael Tanner 200 Bethel Road (office) 972-459-9779 (cell) 214-533-6947 (fax) 972-692-7292 Page 1 Keith Marvin -NEW CREEKVIEW LANDSCAPE ISLANDS.doc Page 1 NEW CREEKVIEW LANDSCAPE ISLANDS 1ST ISLAND 19 X 96 = 1824 SF including new curb 2ND ISLAND 12 X 56 = 672 SF including new curb 3RD ISLAND 5.5 X 39 (optional island) SF including new curb CONCRETE: Bid two ways; With optional island and without. Option 1: THREE ISLANDS REMOVE 2711 SF IN THREE AREAS: Saw cut existing concrete at designated boundaries and excavate to 8" deep. Haul off all debris CONSTRUCT 437 L.F. OF NEW CURB FOR THREE ISLANDS: Dowel into existing paving, form and install three bars of 3/8" steel rebar along length of curb. Pour new curb to match existing an give rough broom finish. Concrete should achieve a minimum compression strength of 3500 PSI within 28 days. Option 1: JUST TWO ISLANDS REMOVE 2496 SF IN TWO AREAS: Saw cut existing concrete at designated boundaries and excavate to 8" deep. Haul off all debris CONSTRUCT 354 L.F. NEW CURB FOR TWO ISLANDS: Dowel into existing paving, form and install three bars of 3/8" steel rebar along length of curb. Pour new curb to match existing an give rough broom finish. Concrete should achieve a minimum compression strength of 3500 PSI I within 28 days. LANDSCAPING: Please come up with your own plan. I would like to use as many Live Oak Trees as possible and stagger them (one closer to the south curb, then the next closer to the north curb and so on, but don't use two systematic (try to give it a natural look. I'd like the base price to include the fastest growing and largest starting size live oaks and then alternate prices for one or more smaller sizes. Also I'd like an option of going with Red Oaks for the 2nd (center of new islands) in the three island version. And I also think it would be nice to incorporate some grass areas and to use some large boulders. Landscaping bids should include all irrigation installed, soil, plants, ground cover, trees, and one 110 watt outdoor electrical power box for each island. Option 1 = 2711 SF - (437 LF curb x 18") = 2055 SF of landscaping Option 2 = 2496 SF - (354 LF curb x 18") = 1965 SF of landscaping Keith Marvin -Denton Tap -_Meadowcreek sidewalk Page 1 From: "Mike Tanner" <miketanner@dfwrealestate.ws> To: <kmarvin@ci.coppell.tx.us> Date: 3/21/2006 3:12:14 PM Subject: Denton Tap -Meadowcreek sidewalk Keith Here (see attached) is the spot that I was telling you about where the sidewalk is needed . Michael Tanner Progressive Realty Advisors (office) 972-459-9779 (cell) 214-533-6947 (fax) 972-692-7292