Loading...
WA9403-SY 941212WATER AND WASTEWATER SYSTEM 1994 CAPITAL IMPROVEMENT PLAN ►1 IMPACT FEE STUDY THE CITY OF COPPELL December, 1994 r P7 ,z1 It, Rady & Assodates A can Ww of Klmley -Horn aril Amodat Inc. r i e� r f r- TABLE OF CONTENTS Executive Summary Overview Definition Methodology Water System Analysis Water System Capital Improvement Plan Maximum Allowable Water System Impact Fee Wastewater System Analysis Wastewater System Capital Improvement Plan Maximum Allowable Wastewater System Impact Fee Page 1 2 2 2 3 4 4 6 6 9 LIST OF TABLES Number Page 1 Cost of Existing Facilities Oversized for Future Development 11 2 Cost Projections for Proposed Water Facilities 12 3 Cost Projections of Proposed Wastewater Facilities 13 4 Equivalent Service Unit Conversion Factors 14 5 Water System -May 19941btal Equivalent Service Units 15 6 Recommended Water Impact Fees for Commonly Used Meters 16 7 Wastewater System -May 1994 -lbtal Equivalent Service Units 17 8 Recommended Wastewater Impact fees for Commonly Used Meters 18 LIST OF EXHIBITS Number 1 Proposed Land Use Map 2 Water System Capital Improvements Plan Map 3 Wastewater System Capital Improvements Plan Map P- F.'� CUTIVE SUMMARY r In June of 1987, the Tbxas Legislature adopted Senate Bill 336 to standardize the method by which political subdivisions recover the cost of capital improvements required to serve new development. The legislation set forth a deadline and a methodology for the calculation of the fees. In June of 1990, the City of Coppell adopted Water and Wastewater Impact Fees which complied with the legislation. In 1991 and in 1994, the City Council authorized the re- evaluation of these fees. As in the initial study, this study area encompasses all land within the city limits. �., The legislation requires that impact fees be based on an Equivalent Service Unit basis. For the City of Coppell, one Equivalent Service Unit (ESU) has been established as a 5/8 "x3 /4" meter. There is projected to be $7, 511,000 of recoverable capital expenditures for the water system and an estimated $6,981,000 recoverable from the City wastewater system. This yields a maximum calculated water impact fee of $566 /ESU for water and $599 /ESU for the City wastewater system. If growth matched projections, adequate capital would be recovered to meet 100 % of the fiscal requirements without the need for outside financing. however, growth rarely matches projections and the capital projects must be constructed in advance of the growth. As such, the City must incur long term debt for the construction of the projects. The associated revenue bonds are secured through the water and wastewater rates. In the first few years after the bonds are sold, the existing system customers, as well as the first "new" customers support the burden of this debt service. This could subject the City to a claim of double charging the new customers since they have paid an impact fee covering the projects and paid rates supporting the associated debt service. There are two possible solutions to prevent this type of claim. The first would be a two tiered rate structure, one with and one without the associated debt. Aside from being an administrative burden, such a rate structure could make future revenue bonds difficult to market. The most realistic alternative is to discount the assessed impact fee, thus assuring the City that a potential double charge does not occur since the new development only pays the discounted portion up front with the unassessed balance being recovered system wide through the rates. Therefore, we recommend the Council set the new impact fee rates for 5/8 "x3/4" meters as follows: Water Customers = $450 r- Wastewater Customers = $450 7 Page 1 .- OVERVIEW Definition Impact Fees are a charge or assessment imposed by a political subdivision against new r developments in order to generate revenue for recouping or funding the costs of capital improvements necessitated by and attributable to such new development. An Impact Fee is not a tax. The fees cover a defined group of capital improvements and are allocated equally over the anticipated new service units. The Impact Fee represents the equitable recovery of actual and anticipated capital expenditures on a unit basis over a ten year forward period. Projected expenditures beyond the ten year period, or expenditures to serve existing development, are equally absorbed by all customers of the system. By law, the Impact Fees may only be used to recover the cost of capital improvements or facility expansions (contained in the approved Capital Improvements Plan) including the construction contract price, surveying and engineering fees, land acquisition costs (including court awards, attorney's and witness fees), and fees paid for preparing or updated the Capital Improvements Plan. Impact Fees may not be used for parks or park land acquisition; onsite water distribution, wastewater collection, or drainage facilities; streets, sidewalks or other such facilities required by valid ordinances. Projected interest charges and finance costs may be included in determining the amount of impact fees, provided such fees are used for the payment of obligations for the construction of facilities identified in the Capital Improvements Plan. Upon completion of a project, the actual cost must be used to recalculate the fees to determine if refund provisions apply. Methodology The City of Coppell continues to be a rapidly growing community in northwest Dallas t ' County. The City has grown from a population of 3,836 in 1980 to an estimated 21,600 in 1994. Approximately 35 % of the gross acreage within the City is currently undeveloped; therefore, adequate land exists for the growth to continue throughout the next ten year planning period. Employment growth is expected to be a substantial component of the future growth as the western portion of the City begins to develop. The legislation allows for the City to recover the cost of certain existing oversized facilities as well as future facilities identified in the Capital Improvements Plan. lb accomplish this, all water and wastewater facilities constructed with City funds were analyzed for excess capacity. Table 1 summarizes the existing oversized projects eligible for impact fee recovery. The total recoverable cost from future development for existing wastewater facilities is $248,406. The next step was to identify the capital water /wastewater projects and/or system improvements which would be required to serve new development prior to January 1, 2004. The Ten Year Capital Improvements Programs contained in the recently adopted Page 2 r i r Water Distribution System Master Plan and Wastewater Collection System Master Plan for the City of Coppell were evaluated for the ability to serve the anticipated new development. The majority of the proposed improvements will be required in the business /industrial districts in the western part of the city. For the purpose of this analysis, it is assumed that developers will bear the cost of all infrastructure for their development without City cost participation. The estimated recoverable cost for proposed future water facilities (Table 2) is $7,511,646. Table 3 summarizes the wastewater facilities which will be required prior to January 1, 2004 and the associated recoverable costs. The estimated recoverable cost of the proposed wastewater facilities is $6,733,009. Portions of the project cost were allocated between the existing and proposed developments. Future flows and system demands were calculated based on the existing flow data, population projections, and the Future Land Use Assumption Plan provided by the City of Coppell. WATER SYSTEM ANALYSIS .- Water usage within the City of Coppell has increased as dramatically as the population. The average daily demand has increased from 0.602 MGD in 1980 to 3.83 MGD in 1993. In 1993, the water system experienced a new record high peak day of 12.72 MG. Based on the population projections and the Future Land Use Assumption Plan, it is estimated that peak day water demands will exceed 30 MGD by the year 2004 and Ultimately approach 38 MGD at "build out ". One of the most critical factors affecting water demands is weather. The amount of rainfall and summer heat can significantly influence water usage. In order to assure a dependable water supply for the community, the system must be capable of meeting the expected peak hour demand during the peak day of a drought year Adequate fire reserves must be maintained at all times. Summarized below are the past and projected water demands: Year Avg. Day MGD Peak Day MGD Peak Factor Number of Connections 1993 3.83 12.72 3.31 7,104 1994* 4.25 14.07 3.31 7,890 2004* 10.05 30.15 3.00 15,744 2014* 12.77 38.31 3.00 17,162 *Projected. Page 3 r" WATER SYSTEM CAPITAL D4MOVEN ENT PLAN The recently adopted Master Water Plan contains a ten and twenty year Capital Improvements Plan. For the purpose of this Impact Fee Analysis, only those projects identified within the ten year plan are included for analysis of recoverable costs. The projects include: 36" Sandy Lake Road water line from MacArthur Boulevard (node 1122) to Denton Tap Road (node 721). 16" water line along Denton Tap Road from Bethel Road (node 865) to Southwestern Boulevard (node 873). 5 7 f ii i Pl Upgrade Village Parkway Pump Station P2 Land Acquisition for the future South Pump Station and Ground Storage Tank G1 New 6 MG Ground Storage 'lank at Village Parkway Pump Station El New 3.5 MG Elevated Storage Tank at Thweat Road It should be noted that this analysis is based on the entire service area within the City Limits. MAX 4UM ALLOWABLE WATER SYSTEM DAPACT FEE The legislation requires impact fees to be based on equivalent service units (ESU) to insure an equal distribution between residential and employment development. The standard residential water meter in the City of Coppell is a 5/8 "x3/4" meter. Therefore, impact fee calculations were based on a 5/8 "x3 /4" meter = 1 ESU All other meter sizes in the system were converted to ESU's using the factors published by the Texas Rural Water Association (Table 4). Table 5 is a summary of the existing meters in the water system with the corresponding ESU's. All meters including irrigation meters and fire meters were included since these meters impose a significant potential demand on the water system. For the purpose of computing impact fees, a service unit has been defined as a single family residence equipped with a 5/8 "x3/4" meter and will consume 437 gallons per day Page 4 on the average. Based on this definition them will be 13,248.9 additional equivalent water service units by the year 2004. The number of equivalent water service units for r each land use type are presented below: 10 -YEAR ADDITIONAL EQUIVALENT WATER SERVICE UNTIE The impact fee per ESU is calculated as the 10 -year system costs divided by the number of new ESU's projected over the next 10 years or: Impact Fee per Service Unit = 10 -year Costs (From Thble 2) 10 -year ESU's $7.511.646 13,248.9 ESU's = $566.96/ESU The maximum impact fee which could be assessed for other meter sizes can be computed by multiplying the number of 5/8 "x3 /4" meters equivalent to another meter size by the impact fee per 5/8 "x3/4" meter. 'Eable 6 presents the recommended water system impact fees which could be assessed by the City. The City Council may determine an amount to be assessed up to the maximum, following the public hearing process. Phge 5 Additional Average Service Equivalent Year 2004 Water Demand Units / Service Land Use/Type Acres gpd Per Acre Acre Units Residential: Single Family 930 1,750 4.00 3,720.0 Townhouse 118 3,063 7.00 826.0 Multi- Family 160 6,798 15.54 2,486.4 Commercial/Retail/ Town Center 344 1,000 2.28 784.3 Industrial/Institutional 1,649 1,400 3.20 5,276.8 Office 17 4,000 9.14 155.4 TOTAL 13,248.9 The impact fee per ESU is calculated as the 10 -year system costs divided by the number of new ESU's projected over the next 10 years or: Impact Fee per Service Unit = 10 -year Costs (From Thble 2) 10 -year ESU's $7.511.646 13,248.9 ESU's = $566.96/ESU The maximum impact fee which could be assessed for other meter sizes can be computed by multiplying the number of 5/8 "x3 /4" meters equivalent to another meter size by the impact fee per 5/8 "x3/4" meter. 'Eable 6 presents the recommended water system impact fees which could be assessed by the City. The City Council may determine an amount to be assessed up to the maximum, following the public hearing process. Phge 5 r- WASTEWATER SYSTEM ANALYSIS Wastewater flows within the City of Coppell have out -paced the rapid population growth. The average daily flow has increased from 0.912 MGD in 1985 to 3.262 MGD in 1993. Based on the population projections and Future Land Use Assumptions, it is estimated that future peak wastewater flows will exceed 22 MGD by the year 2004 and 25 MGD by 2014. r Wastewater flows are highly dependent upon rainfall and the associated infiltration and inflow. In 1988, the wastewater system flow averaged 52% of the average daily water demand. In 1992, a year with above average rainfall, the wastewater system flow averaged 108 % of the average daily water demand. This figure shows the large amount of known Inflow and Infiltration which the system received. In order for the system to r .. operate effectively, the wastewater collection system must be capable of handling peak hourly flow events without overflow. r- Summarized below are the projected wastewater flows: r Year Peak Flow MGD Number of Connections 1994 16.266 7,633 2004 22.311 15,563 2014 25.551 16,981 WASTEWATER SYSTEM CAPITAL D4PROVEIVIENT PLAN rr The wastewater system was analyzed to determine existing capacities and projected flows for the entire City. Average and peak demands were calculated based on the population projections. The demands were distributed within the basins to the appropriate interceptors. The process was repeated for the projected years 2004 and 2014 demands. A series of system improvements were analyzed for each time period to size the ultimate facilities and determine the size required for the year 2004. lkble 3 summarizes the capital projects required to handle the year 2004 flows. The oversized existing lines and future system improvements which were identified to meet the, projected year 2004 demands are as follows: r Page 6 f Line W Denton Creek Trunk Main This existing line consists of 3,950 L.F. of 15 ", 2,700 L.F. of 18 ", 2,820 L.F. of 21 ", and 6,040 L.F. of 24" sanitary sewer along Cottonwood Branch and Denton Creek from State Road to Moore Road. Owner paid 25 % of cost for this project, state grant financed remaining 75 %. Line 1 C 1 Grapevine Creek flunk Main - Branch I This existing line consists of 3,710 L.F. of 30" sanitary sewer along Belt Line Road from Mockingbird Lane to MacArthur Boulevard. r" Line 1C2 Grapevine Creek Trunk Main - Branch I This line consists of 3,860 L.F. of 33" sanitary sewer along Belt Line Road from MacArthur Boulevard to Fairway Drive and is the TRA r' service line. Owner pays 3.115 % of TRA Operation, Maintenance, and Debt Service. Line 1E Grapevine Creek Trunk Main - Branch I and II This line consists of 4,720 L.F. of 12 ", 4,060 L.F. of 24 ", and 6,720 L.F. of 30" sanitary sewer along Grapevine Creek from the St. Louis and Southwestern Railroad to Mockingbird Lane. Line 5E5 Meadowcreek Road This line consists of 2,940 L.F. of 12" sanitary sewer along Meadowcreek Road from Denton Tap Road to Grapevine Creek. Page 7 .- s-;1 - Line lA2 Denton Creek Trunk Main Replace the existing 24" sanitary sewer south of Denton Creek from Moore Road (A19) to Glen Lakes Drive (A21) with a 1,570 L.F. of 27" and 180 L.F. of 30" sanitary sewer. Line 1B2 Lakes of Coppell Gravity r- Replace the existing 30" sanitary sewer south of Sandy Lake Road from Sandy Lake Road (B17) to the Sandy Lake Lift Station (B 18A) with 400 L.F. of 36" sanitary sewer. Line 3B East Sandy Lake Road Replace the existing 8" sanitary sewer along Sandy Lake Road from MacArthur Boulevard (B70) to Line 1B2 (B17) with 1,120 L.F. of 21" sanitary sewer. Line 4E2 Grapevine Creek Trunk Main - Branch III Construct 2,600 L.F. of 15" sanitary sewer along Denton Thp Road from Belt Line Road (E85) to Bethel Road (8124). Line 5E4 Grapevine Creek Trunk Main - Branch IV Replace the existing 8" sanitary sewer along Bethel School Road and Denton Thp Road from Plantation Drive (E68) to Meadowbrook Road (E17) with 2,340 L.R of 12" sanitary sewer. Line 6E2 Bethel Road Replace the existing 8" sanitary sewer along Bethel Road from Loch 4 Lane (8143) to Coppell Road (E145) with 830 L.F. of 12" sanitary sewer. DeForest Road Lift Station and Force Main Uvmade - Add a new wet well structure r with two pumps to provide an additional capacity of 4 MGD This flow will be pumped in a 7,600 L. R , 16" force main along MacArthur Boulevard from the DeForest Lift Station to Sandy Lake Road Line 3B. Sandy Lake Road Lift Station Upgr - Add a new wet well with two pumps and add an additional pump in the existing structure to provide an additional capacity of ^' 7 MGD The existing 30" force main is adequate for year 2004 and 2014. It should be noted that this analysis is based on the entire service area within the City Limits. Page 8 ALLOWABLE WASTEWATER SYSTEM EWPACT FEE The legislation requires that impact fees be based on equivalent service units (ESU) to insure an equal distribution between new residential and employment development. The standard residential water meter in the City of Coppell is a 5/8 "x3 /4" meter. Therefore, for uniformity, impact fee calculations were based on a 5/8 "x3 /4" meter = 1 ESU for water and wastewater. As with the water system, other meter sizes were converted to ESU's using the factors published by the Ttwm Rural Water Association ( Table 4). For the wastewater system, irrigation meters and fire service meters were not included, since these meters do not generate any wastewater demand. The total existing ESU's for the wastewater system are summarized in Table 7. Sanitary Sewer System Impact Fees For the purpose of computing sanitary sewer impact fees, a service unit has been defined as a single family residence equipped with a 5/8 "x3/4" meter and will generate 335 gallons of sewage per day on the average. Based on this definition, there will be 11,647.7 equivalent service units by the year 2004. Additional 10 -year equivalent service units, by land use category, are presented below: 10 -YEAR ADDITIONAL EQUIVALENT SANITARY SEWER SERVICE UNITS page 9 Average Additional Wastewater Service Equivalent Year 2004 Demand Units / Service Units Land Use /Type Acres gpd Per Acre Acre Residential: Single Family 930 1,004 3.00 2,790.0 Townhouse 118 2,010 6.00 708.0 Multi- Family 160 5,192 16.00 2,560.0 Commercial/Retail/ Town Center /Office 361 702 2.10 758.1 Industrial/Institutional 1,649 980 2.93 4,831.6 TOTAL 1 1 11,647.7 page 9 r i The impact fee per ESU is calculated as the 10 -year system costs divided by the number of new ESU's projected over the next 10 years or: Impact Fee per Service Unit = 10 -year Costs 10 -year ESU's 56.981.415 (' Tble 1 + Table 3) 11,647.7 ESU's _ $599.38/ESU The maximum impact fee which could be assessed for other meter sizes and types can be computed by multiplying the number of equivalent 5/8 "x3 /4" meters another meter size represents times the impact fee per 5/8 "x3 /4" meter. Thble 8 provides the recommended wastewater system impact fees which could be assessed by the City. The City Council may determine an amount to be assessed up to the maximum, following the public hearing process. Page 10 r TABLE 1 COSTS OF EXISTING FACHMIFS OVERSIZID FOR FUTURE DEVELOPMENT * - City's portion of this cost is 25 % of this amount ** - City's portion of this cost is 3.115 % of this amount Page i 1 Eligible lbtal Line Actual Actual Impact Eligible Impact No. Location Size Cost Flee Interest Five W Denton Creek 15 ", 18 ", $2,482,000* $36,500 $23,288 $59,788 Trunk Main 21", 24" 1C1 Grapevine 30" $900,000 $23,200 $14,802 $38,002 Creek Trunk Main - Branch I 1C2 Grapevine 33" $936,400 ** $750 $478 $1,228 Creek Trunk Main - Branch I 1E Grapevine 12 ", 24 ", $2,500,296 $83,900 $53,531 $137,431 Creek Trunk 30" Main - Branch I & II 5E5 Meadowcreek 12" $294,000 $7,300 $4,657 $11,957 Road TOTAL $7,112,696 $151,650 $96,756 1 $248,406 * - City's portion of this cost is 25 % of this amount ** - City's portion of this cost is 3.115 % of this amount Page i 1 TABLE 2 COST PROJECTIONS FOR WATER FACILITIES vo co N WATER LINE PROJECTS LINE NO. LOCATION YEAR NEEDED LENGTH (L.F.) EXIST. DIAM. REQ'D DIAM. 2004 2014 DIAM. DIAM. PROJECT COST ELIGIBLE IMPACT FEE ELIGIBLE INTEREST TOTAL IMPACT FEE a. Sandy Lake Road MacArthur Blvd. to Denton Tap Rd. 1996 10,800 16 16 30° .. $1,620,000 $378,000 $167,217 $545,217 d. Denton Tap Rd. Bethel Rd. to Southwestern Blvd. 1996 2,400 8 8 12 ;. $216,000 $12,000 $5,308 $17,308 PUMP STATION, STORAGE AND OTHER PROJECTS PROJECT NO. PROJECT YEAR NEEDED UNIT EXIST. SIZE REQ'D SIZE SIZE 2004 611ill. PROJECT COST ELIGIBLE IMP ACT FEE ELIGIBLE INTEREST TOTAL IMPACT FEE Pl U rade Villa a Parkwa Pum Station 1995 MGD 18 18 26 $140,000 $140,000 $67,605 $207,605 P2 Land Acquisition for South Pump Station and Ground Storage Tank 1997 AC 0 0 2 $17.5,000 $175,000 $69,664 $244,664 G1 New Ground Storage Tank at Vlg. Pk y. PS 1995 MG 0 0 4 $3,000,000 $2,000,000 $965,780 $2,965,780 El Elevated Storage Tank at Thweat Road 1998 MG 0 0 2.0 z` 4 $4,462,000 $2,587,000 $906,072 $3,493,072 Mi Master Plan and CIP/Impact Fee Report for Water S tem 1994 LS --- - - - - - - - - - $38,000 $38,000 $0 $38,000 TOTAL= $9,651,000 $5,330,000 $2,181,646 $7,511,646 TABLE 3 COST PROJECTIONS FOR WASTEWATER FACILITIES V (P r-+ w SEWER LINE PROJECTS LINE NO. LOCATION YEAR NEEDED LENGTH (L.F.) EXIST. DIAM. REQ'D DIAM. 2004 2014 DIAM. DIAM. PROJECT COST ELIGIBLE IMPACT FEE ELIGIBLE INTEREST TOTAL IMPACT FEE IA2 Denton Creek Trunk Main 1999 1,910 180 2,090 24 24 27 :K« Oil 24 24 27 „,1I $201,000 $20,000 $14,000 $1,200 $4,187 $359 $18,187 $1,559 $221,000 $15,200 $4,546 $19,746 1132 Sandy Lake Road Lift Station 1999 400 30 30 33 ' xan.:. : $51,000 $3,000 $1,449 $4,449 3B East Sandy Lake Road 1995 1,120 8 12 21 $104,000 $25,200 $12,169 $37,369 4E2 Grapevine Creek Trunk Main - Branch III 1995 2,600 --- 10 12 .: $192,000 $6,500 $3,139 $9,639 5134 Grapevine Creek Trunk Main - Branch IV 1995 2,340 8 10 12 -10 • :; . »v =: $199,000 $9,000 $4,346 $13,346 6112 Bethel Road 1996 300 530 8 8 10 --- 8 10 #.''':h $21,000 $38,000 S1,200 $2,000 $531 $885 $1,731 $2,88.5 830 $59,000 $3,200 1 $1,416 $4,616 LIFT STATION AND FORCE MAIN PROJECTS PROJECT NO. PROJECT YEAR NEEDED UNIT EXIST. SIZE REQ'D SIZE 2004 2014 I SIZE SIZE PROJECT COST ELIGIBLE IMPACT FEE ELIGIBLE INTEREST TOTAL IMPACT FEE LSI Upgrade DeForest Road Lift Station 1997 MGD 6.87 5.69 9.98 k $320,000 $262,000 $104,297 $366,297 FM1 DeForest Force Main 7,600 L.F. 1997 inches 0 0 16 ••l • ,�;.„_ • $680,000 $680,000 $270,694 $950,694 LS2 Upgrade Sandy Lake Road Lift Station 1999 MGD 10.30 10.30 14.10 : y; :4t $37.5,000 $248,000 $74,170 $322,170 M2 Master Plan and CIP/Impact Fee Report for Wastewater System 1994 LS ... --- . - - - - - $38,000 $38,000 $0 $38,000 WWTP L= TRA WWTP Expansion Co II Portion 1994 LS --- ... .77 - - - - $1,823,676 $1,823,676 $3,143,009 $4,966,685 TOTAL= $4,062,676 $3,113,776 $3,619,233 $6,733,009 2' 'y"'^°''r ^:` '4 x tic ♦ua• .�. ,•} r- TABLE 4 EQUIVALENT SERVICE UNIT CONVERSION FACTORS Meter Size E.S.U.* 5/8 "x3/4" 1.00 1 " 2.50 1 1/2" 5.00 2" 8.00 3 16.00 4" 25.00 6" 62.50 8 80.00 10 115.00 * From 'Texas Rural Water Association Recommended Meter Equivalents, based on AWWA Specifications and Design Criteria. Page 14 r TABLE 5 WATER SYSTEM MAY 1994 TOTAL EQUIVALENT SERVICE UNITS Meter Size Number of Meters TRWA Equivalent Equivalent Service Units 5/8 "x3/4" 7,534 1.00 7,534 1" 130 2.50 325 1 1/2" 52 5.00 260 2 166 8.00 1,328 3" 8 16.00 120 4" 1 25.00 25 6" 10 62.50 625 8 22 80.00 1 10" 2 115.00 230 TOTAL 7,925 12,207 Page 15 r TABLE 6 RECOMMENDED WATER H -APACT FEES FOR COMMONLY USED METERS Meter Size E.S.U.* Water Impact Fee 5/8 11 0/4" 1.00 $450 1" 2.50 $1,125 1 1/2" 5.00 $2,250 2" 8.00 $3,600 3" 16.00 $7,200 4" 25.00 $11,250 6 62.50 $28,125 8" 80.00 $36,000 10 115.00 $51,750 * From lbm Rural Water Association Recommended Meter Equivalents, based on AWWA Specifications and Design Criteria. Page 16 r TABLE 7 WASTEWATER SYSTEM MAY 1994 TOTAL EQUIVALENT SERVICE UNITS Meter Size Number of TAPS TRWA Equivalent Equivalent Service Units 5/8 "x3/4" 7,271 1.00 7,271 1" 125 2.50 312.5 1 1/2" 50 5.00 250 2" 160 8.00 1,280 3" 7 16.00 112 4" 1 25.00 25 6" 5 62.50 312.5 8 14 80.00 1 10" 0 115.00 0 TOTAL 7,633 10,683 Page 17 r- r r TABLE 8 RECOMMENDED WASTEWATER Il"ACT FEES FOR COMMONLY USED METERS E r Meter Size E.S.U.* Wastewater Impact F be 5/8 "x3/4" 1.00 $450 1" 2.50 $1,125 1 1 /2" 5.00 $2,250 2 8.00 $3,600 3" 16.00 $7,200 4 25.00 $11,250 6" 62.50 $28,125 8 80.00 $36,000 1 1 10 11 115.00 $51 * From Texas Rural Water Association Recommended Meter Equivalents, based on AWWA Specifications and Design Criteria. Page 18 rr � DENTgN COUNTY LEGEND 3000 2000 1000 500 4 1000 2000 3000 \ P = 3000' ,i !, I P L AND A r CITI OF CO LL, TI, v Inm��a. Thc MY MA A B Uful F� :�: •. .,, , °' pp , ,y G y ,� , ' � '' ` Syr , : • Im REM- • . TO MA.�M • • � y @ y, 1• ✓,� 1T• 7: 1 '1•. Y '414.! a O•aJ = � s.' ., - • ` i ii h • p X : �' - i, •• a �`�... ..:.1 ..._..... ._ . •, .. • is 3000 2000 1000 500 4 1000 2000 3000 \ P = 3000' ,i !, I P L AND A r CITI OF CO LL, TI, v Inm��a. Thc MY MA A B Uful F� I 10/05/94 15 :18 94C