DR8601-CS 850823NN, INC.
August 23, 1985
CONSULTING ENGINEERS
Mr. Sam Wyse
General Homes Land Development
15301 Dallas Parkway, %1020
Dallas, TX 75248
Re: Parkwood Section II --.Final Acceptance
Dear Mr. Wyse:
A final inspection of the above referenced project has been
confirmed by representatives of the Coppell Municipal Utility
District #1, Ginn, Inc., and the City of Coppell.
The utility and paving requirements are in compliance with
standard requirements and are acceptable to the City of
Coppell. As of this date, permits can be issued to start
construction of the remaining homes with'the limits of this
phase. As-built drawings and one-year maintenance bonds have
been received from both contractors. Maturity of the bonds
will be one year from the date of completion for the
following items:·
1. Lower existing 12" water main and valve
2. Brick pavers at Parkway Boulevard - Samuels Boulevard
· "S~ncerely,
H. wayne Ginn, P.E.
City Engineer
RF/~WG/sr
cc:
Steve Goram
Dean Youngblood
Pierce-Lunsfo;d Associates
Regional Utilities
Southwestern Contracting Co.
Randy Fleming
16135 Preston Road · Suite 106 · Dallas, Texas 75248 · Phone 214/386-6611