Loading...
Freeport NIP(2.94)-CS061207 (2)T H E C 1 T Y O F COPPELL A � � December 7, 2006 Jack Evans, P.E. Pacheco Koch Consulting Engineers 8350 N. Central Expressway. Suite 1000 Dallas, TX 75206 RE: Freeport Lot VIII at Freeport North Lot 4R, Block A Dear Mr. Evans: A pre- construction conference on the referenced project has been scheduled for Tuesday, December 12, 2006 at 2:00 p.m. in the second floor conference room in Town Center at 2 5 5 Parkway Blvd. Please notify the franchised utility companies. contractors. sub- contractors, testing lab and any other interested parties so that they may have a representative present. If you have any questions concerning this project prior to the scheduled meeting_ feel free to contact me at (972) 304 -3684. Sincerely, Larry Davis, Construction Inspector Office Phone: 972 -304 -3684 Fax: 972 - 304 - 3570 cc ken Griffin. P.E.. Dir. of Engineering & Public Works Glenn Hollowell, P.E., Asst. Dir. of Public Works Lee Stone, Commercial Building Inspector Tim Oates, Fire Marshal 255 PARKWAY * P.0.80X 9478 * COPPELL 7X 75019 * TEL 972/462 0022 * FAX 9721304 3673 2 RESPONSIBILITY FOR PRE - CONSTRUCTION MEETING NOTIFICATION The owner / owner's representative will be notified of the date, time and place of the pre- construction meeting once it is scheduled by the Construction Inspector assigned to the project. It is the owner / owner representative's responsibility to notify the following parties: • Franchise Utilities (including but not limited to electric, gas, cable, & telephone providers) • Geotechnical firm • Project Engineer • Contractors or subcontractors for excavation, utility, & paving operations • SWPPP representative