Freeport NIP(2.94)-CS061207 (2)T H E C 1 T Y O F
COPPELL
A � �
December 7, 2006
Jack Evans, P.E.
Pacheco Koch Consulting Engineers
8350 N. Central Expressway. Suite 1000
Dallas, TX 75206
RE: Freeport Lot VIII at Freeport North Lot 4R, Block A
Dear Mr. Evans:
A pre- construction conference on the referenced project has been scheduled for Tuesday,
December 12, 2006 at 2:00 p.m. in the second floor conference room in Town Center at
2 5 5 Parkway Blvd.
Please notify the franchised utility companies. contractors. sub- contractors, testing lab
and any other interested parties so that they may have a representative present. If you
have any questions concerning this project prior to the scheduled meeting_ feel free to
contact me at (972) 304 -3684.
Sincerely,
Larry Davis, Construction Inspector
Office Phone: 972 -304 -3684
Fax: 972 - 304 - 3570
cc ken Griffin. P.E.. Dir. of Engineering & Public Works
Glenn Hollowell, P.E., Asst. Dir. of Public Works
Lee Stone, Commercial Building Inspector
Tim Oates, Fire Marshal
255 PARKWAY * P.0.80X 9478 * COPPELL 7X 75019 * TEL 972/462 0022 * FAX 9721304 3673
2
RESPONSIBILITY FOR PRE - CONSTRUCTION
MEETING NOTIFICATION
The owner / owner's representative will be notified of the date, time and place of
the pre- construction meeting once it is scheduled by the Construction Inspector
assigned to the project.
It is the owner / owner representative's responsibility to notify the following
parties:
• Franchise Utilities (including but not limited to electric, gas, cable, &
telephone providers)
• Geotechnical firm
• Project Engineer
• Contractors or subcontractors for excavation, utility, & paving operations
• SWPPP representative