Northlake 635(13)-CS060919 (2)
Keith Marvin - Northlake 635 Pavement Variance
Page 1
From:
To:
Date:
Subject:
"Steven Heilbrun" <sheilbrun@pkce.com>
<kmarvin@cLcoppell.beus>
9/19/2006 4:42: 17 PM
Northlake 635 Pavement Variance
Good Afternoon Keith,
Please find attached a written request for variance on the pavement design for Northlake 635 Business
Park, Lot 2R, Block C (Coppell Business Center III).
Thanks,
Steven Heilbrun
Project Engineer
sheilbrun@pkce.com <mailto: sheilbrun@pkce.com>
Pacheco Koch
Consulting Engineers
8350 N. Central Expwy, Suite 1000
Dallas, Texas 75206-1612
T 972.235.3031 * F 972.235.9544
www.pkce.com <http://www.pkce.com/>
cc:
<tracy@mdigc.com>, "Erik M. Hauglie" <ehauglie@pkce.com>
i Keith Marvin - Northlake Pavement Variance. pdf
~ page1J
Pacheco Koch ,I I I
September 19, 2006
PK No.: 1568-05.296
Mr. Keith Marvin P. E.
CITY OF COPPELL
Engineering Department
255 Parkway Boulevard
Coppell, Texas 75019
~~
Re: NORTH LAKE 635 BUSINESS PARK
Request for Variance on Pavement Design
Coppell, Texas
Dear Mr. Marvin:
On behalf of Skelton, Hubbard, Skelton Partners, L TO., we request that the City of
Coppell grant a variance to the Subdivision Ordinance on the pavement design criteria
for the Northlake 635 Business Park, Lot 2R, Block C (Coppell Business Center III).
Skelton, Hubbard, Skelton Partners wishes to eliminate the use of lime stabilization on
this project in order to save on cost associated with the pavement. In lieu of lime
stabilization, Skelton, Hubbard, Skelton Partners will increase the pavement thickness
from six inches to seven inches in proposed tire lanes, and will increase the pavement
thickness from five inches to six inches in proposed parking areas; however, the strength
of the concrete will remain unchanged.
Thank you for your consideration on this matter. If you have any questions or need any
additional information, please contact me at your convenience.
Sincerely,
~#)~
Steven M. Heilbrun
SMH/jpm
1568-143
enc.
cc: Randy Hubbard - MOl General Contractors, Inc.