Gateway BP(1.6)-LR061121REPORT OF REINFORCING STEEL OBSERVATION l~~rr~con Consultlnp Enr7lneers & Selentlsts 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 (2141630-1010 Date of Service: 11/21/06 Report No.: Client No.: 47876 Project No.: Client: ProLogis Project: 2310 LBJ Freeway Ste 200 Dallas, TX 75234 /~. Services: Observe placement of reinforcing for compliance with fort PROJECT DATA Drawings Utilized: Specification Section 02515.0301 Locations/Items Observed: Sidewalk, E side of building @ line E.5-Q Test Method: Visual Observation REPORT OF OBSERVATION 94061163.0165 ~ _,~.., 94061163 Freeport Corporate Ctr. Bldg. 6 Freeway Pkwy & Gateway Coppell, TX fished drawings. ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT Placing Drawings Approved Bar Length and Shape X Column Tie Spacing 8 Type Bar Size X Proper Bar Placement X Stirrup Spacing 8 Type Bar Grade X Properly Tied X Welded Splices Rebar Clean X Dowel Bars in Place X Mechanical Splices Trash 8 Debris Removed X Proper Bar Suppods X Lapped Splices X Number of Bars X Proper Cover/Clearance X Discrepancieslcomments: The following discrepancies found were not corrected prior to concrete placement: 1. Main reinforcing specification is 6"x6" WWM; #3 reinforcing steel bars were placed at 18 inches on center each way. Field Results Report To: Technician: M. Whyman Report Distribution: (1) ProLogis (1) City of Coppell TX (1) City of Coppell TX (1) Haynes Whaley Assoc Inc (1) Meinhardt & Assoc Architects Pt (1) Jordan Construction Services (1) Meinhardt & Assoc Architects PLLC Robert D S.E.T. Senior Pr ect Manager 309pdr This report is exclusively for the use of the client indicated above and shall not be reproduced without written approval of Terracon.