Loading...
Gateway BP(1.6)-LR061115REPORT OF REINFORCING STEEL OBSERVATION l~i~rr~con Consultlnp Enplneers E SGentlsts 8901 Carpenter Fnvy., Suite #100 Dallas, Texas 75247 (2141630-IOIO Date of Service: 11/15/06 Client No.: 47876 Client: ProLogis 2310 LBJ Freeway Ste 200 Dallas, TX 75234 Report No.: 94061163.0159 Project No.: 94061163 Project: Freeport Corporate Ctr. Bldg. 6 Freeway Pkwy & Gateway Coppell, TX Services: Observe placement of reinforcing for compliance with furnished drawings. PROJECT DATA Drawings Utilized: Ramp Sheet 54.2/Detail #2, dated 05/22/06; Pavement C1.11, dated 06/01/06 Locations/items Observed: Pavement, W of Building and Ramp NW of Building Test Method: Visual Observation REPORT OF OBSERVATION ITEMS OBSERVED CORREC7 INCORRECT ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT Placing Drawings Approved X Bar Length and Shape X Column Tie Spacing & Type Bar Size X Proper Bar Placement X Stirrup Spacing & Type Bar Grade X Properly Tied X Welded Splices Rebar Clean X Dowel Bars in Place X Mechanical Splices Trash 8 Debris Removed X Proper Bar Supports X Lapped Splices X Number of Bars X Proper CoverlClearance X Discrepancieslcomments: No discrepancies were noted at the time of this observation. Field Results Report To: Technician: J.A. Martinez Report Distribution: (1) ProLogis (1) City of Coppell TX (1) City of Coppell TX (1) Haynes Whaley Assoc Inc (1) Meinhardt 8r Assoc Architects Pt (1) Jordan Construction Services (1}Meinhardt & Assoc Architects PLLC Robert ay, S.E.T. Seni roject Manager 309acs This report is exclusively for the use of the client indicated above and shall not be reproduced without written approval of Terracon.