Loading...
DR8601-CS 840607Lichliter/Jameson & Associates, Inc. CONSULTING ENGINEERING PLANNING SURVEYING June 7, 1984 ~City of Coppell, Texas Post Office Box 478 Coppell, Texas 75019 Attention: Mr. Ron Ragland City Administrator Re: Water and Sanitary Sewer Drainage and Utilities Meadows Subdivision-Section Ill Dear Mr. Ragland: During the last several weeks numerous inspections have taken place, punch lists prepared, and additional final inspections held on the referenced project. A final inspection and letter of acceptance for the paving was issued May 7. However, to date final acceptance of the utilities has not been issued. I have found this subdivision to meet all City requirements and it is acceptable to me. The engineer for Coppell Municipal Utility District No. 1 has also inspected the project and given his acceptance of. the utilities. They have requested a letter from the city officially accepting the subdivision. I am also request;rig a letter of acceptance. Please forward copies to this office and to Pierce/Lunsford Assoc. if I can be of further service to you on this project, please advise. Very truly yours, Brian A. McDan-iel, P.E. Project Manager BAM/rlw cc: D.~Wayne Wommack, Braewood ~/Randy Fleming, Ginn, Inc. Steve Goram, Coppell File No.: 542-0100-07 I430 EMPIRE CENTRAL SUITE 230 DALLAS TEXAS 75247 214/630-8867