Vista Point 2R-CS060720
I Keith ~al"'li~ - VP~outh, Phase II Pre-C()n fII!~~ting-~
Page 1 I
From:
To:
Date:
Subject:
"Chris Gardner" <cgardner@jacksonshaw.com>
"Keith Marvin" <kmarvin@cLcoppeILtx.us>
7/20/20066:12:55 PM
VP South, Phase II Pre-Con Meeting
07.20,06
Keith Marvin:
Per our discussion this morning, Coppell Engineering is ready to proceed
with a pre-construction meeting to release our full civil permit.
(Keith McMahon, please coordinate with your utility sub! concrete sub!
and any other subs that need to attend this meeting, Please call the
Coppell City Inspector, Rick Odell at 972.304.7090 to arrange a time and
date for the pre-con meeting and notify all attendees,)
Also, we understand Coppell is willing to issue the full permit
contingent upon our comittment to resolve the grading mismatch along our
east property line. As I mentioned this morning, our civil engineering
consultant has been developing several optional design solutions for the
grade discrepency. We have received permission from Weitzman Group and
tentatively from Bank of Texas (Ron Richey) to perform some limited
driveway demolition and local area grading to correct the grade problems
on both our site and theirs. All of the potential solutions require
changes to our site grades and storm water drainage systems, Erik
Hauglie will coordinate with you for submittal of whatever specific
plans or information you may require for review and approval prior to
any additional site work for the bank driveway tie-in. Please feel free
to call me should you have any additional questions, Thank you.
Respectfully,
Christopher Gardner
Development Project Manager
Jackson-Shaw Company
4890 Alpha Road
Suite 100
Dallas, TX 75244
972-628-7421 Ofc
972-628-7444 Fax
cc: <keithm@bullardconstruction.com>, "Erik M. Hauglie" <ehauglie@pkce.com>, "Demian
Salmon" <dsalmon@jacksonshaw,com>, "Michelle Graham" <mgraham@jacksonshaw.com>