Belt Line Trade-LR061110
REED EnGinEERinG
GEOTECHNICAL AND G R 0 U P
ENVIRONMENTAL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
Belt Line Trade Center Building A
500 E. Belt Line Road
Coppell, Texas
REPORTED TO: IDI
5420 LBJ Freeway, Suite 1275
Dallas, Texas 75240
A TTN: Mr. Chris Parnell
CONTRACTOR: Raymond Construction
location of Sam
Set Number
1
2
3
4
5
6
Ie
location
Paving: 475'S, 25'E from SE bldg. corner
Paving: 360'N, 60'E from SE bldg. corner
Paving: 275'N, 30'E from SE bldg. corner
Paving: 200'N, 75'E from SE bldg. corner
Paving: 125'N, 20'E from SE bldg. corner
Pavin : 75'N, 45'E from SE bid . corner
Desi n Information
Source of Concrete Mix Identification
LMC 1551
Age@ Total load
Date Tested Test Ibs.
10-20-06 7 82720
11-1 0-06 28 106940
11-1 0-06 28 104620
Hold H
2 7570 10-20-06 7 80330
7570 11-1 0-06 28 107080
7570 11-1 0-06 28 108330
7570 Hold H
3 7571 10-20-06 7 89390
7571 11-1 0-06 28 120260
7571 11-1 0-06 28 129030
7571 Hold H
4 7572 10-20-06 7 88910
7572 11-1 0-06 28 105260
7572 11-1 0-06 28 110870
7572 Hold H
REPORT NO. 138
REG PROJECT NO. 13335
SAMPLE DATE: 10-13-06
TECHNICIAN: J. Smith
PAGE: 1 of 2
ecified Stren
3500
3750
2840
3790
3830
3810
3160
4260
4570
4410
3150
3730
3920
3830
2424 STUTZ DR. . SUITE 400 . DALLAS, TX 75235 . TEL [214J 350 5600 . FAX [214] 3500019
REPORT NO. 138
REG PROJECT NO. 13335
SAMPLE DATE: 10-13-06
PAGE: 2 of 2
Age@ Total load
Date Tested Test Ibs.
10-20-06 7 92110
11-1 0-06 28 128100
11-1 0-06 28 116150
Hold H
6 7574 10-20-06 7 93690
7574 11-1 0-06 28 121330
7574 11-10-06 28 120340
7574 Hold H
C Iinder Data
Set Cylinder
No. 10
1 7569
2 7570
3 7571
4 7572
5 7573
6 7574
Mail
Distribution: (1) IDI/Mr. Chris Parnell
(1) Raymond Construction/
Mr. David Layne
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
Submitted by:
3320
4290
4260
Air
Entrainment
4.4
4.7
4.0
4.3
5.0
4.7
4320
4280
Ticket
Number
3221798
7171907
7171920
7171939
3221864
7171967
REED ENGINEERING GROUP, LTD.
Original Signed By
Mickey Lawson
Assistant Manager, CMT
ML/lnc