Loading...
DR8601-CS 840814GINN, INC. August 14, 1984 CONSI'LTIN(; ENGINEERS GENERAL HOMES 15301 Dallas Parkway, Dallas, TX 75248 #1020 Attn: Sam Wyse Re: Parkwood I Subdivision Paving and Utilities Dear Mr. Wyse: A walk through of the above referenced project was conducted at 9:45 a.m. on August 7, 1984. Representatives of the City of Coppell, M.U.D. #1, and Ginn, Inc. were on hand to make inspections of the project. Deficiencies were found to be present in many bid items, as shown on the following pages. Special interest should be taken on these items to obtain final acceptance of the project. Construction of the model homes may proceed during the interim period of two weeks while the deficiencies are being corrected. Final acceptance of the project will also consist' of receiving a one-year maintenance bond, one set of blue-line as-built plans, and one set of reproducible as-built plans. Sincere~iY, H. Wayne Ginn City Engineer HWG:sr cc: RonRagland Steve Goram Dean Youngblood Gary Wiggs Jeff Hawkins Lanzo Construction Co. Austin Paving Co. Univest Development Co.