Loading...
Gateway BP(3.1)-CS061130DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM.' (Public Hearing) Gateway Business Park No. 3, Lots 1 and 2 Block A, Minor Plat and Replat, being a replat Gateway Business Park No. 2, Common Area 1, containing 0.29 of an acre, and a minor plat of approximately 17.8 acres of property, to establish various easements and fire lanes, to allow the construction of two, two-story office buildings on property located at the north corner of IH-635 and Freeport Parkway, at the request of Mark W. McGraw, Halff Associates. STAFF REP.: Marcie Diamond PROJECT ID# RP-06-0069 DRC DATE: November 30, 2006 and December 7, 2006 CONTACT.' Kenneth M. Griffin, P.E., Dir.of Engineering/Public Works 972/304-3686 COMMENT STATUS: /PRELIMINARY ~A-L ~~~ 1. Is there a Property Owner's Association being formed to maintain the private utility lines and landscaping throughout this proposed development? 2. Who are the proposed private Drainage and Utility Easements being dedicated to? Additional comments may be generated upon detailed engineering review. DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM.' Gateway Business Park No. 3, Lots 1 and 2 Block A, Site Plan, to allow the construction of an 114,810-square-foot, two-story office building on Lot 1, containing 9.49 acres of property and an 110,560-square-foot, two-story office building on Lot 2, containing 8.60 acres of land on property located at the north corner of IH-635 and Freeport Parkway, at the request of Mick Granlund, O'Brien & Associates. STAFF REP.: Marcie Diamond DRC DATE: November 30, 2006 and December 7, 2006 CONTACT: Kenneth M. Griffin, P.E., Dir.of Engin COMMENT STATUS: /PRELIMINARY PROJECT ID# SPA-06-0068 Works 972/304-3686 See comments under Replat.