Gateway BP(3.1)-CS061130DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM.' (Public Hearing) Gateway Business Park No. 3, Lots 1 and 2 Block A,
Minor Plat and Replat, being a replat Gateway Business Park No. 2,
Common Area 1, containing 0.29 of an acre, and a minor plat of
approximately 17.8 acres of property, to establish various easements and fire
lanes, to allow the construction of two, two-story office buildings on
property located at the north corner of IH-635 and Freeport Parkway, at the
request of Mark W. McGraw, Halff Associates.
STAFF REP.: Marcie Diamond PROJECT ID# RP-06-0069
DRC DATE: November 30, 2006 and December 7, 2006
CONTACT.' Kenneth M. Griffin, P.E., Dir.of Engineering/Public Works 972/304-3686
COMMENT STATUS: /PRELIMINARY ~A-L ~~~
1. Is there a Property Owner's Association being formed to maintain the private utility
lines and landscaping throughout this proposed development?
2. Who are the proposed private Drainage and Utility Easements being dedicated to?
Additional comments may be generated upon detailed engineering review.
DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM.' Gateway Business Park No. 3, Lots 1 and 2 Block A, Site Plan, to
allow the construction of an 114,810-square-foot, two-story office building
on Lot 1, containing 9.49 acres of property and an 110,560-square-foot,
two-story office building on Lot 2, containing 8.60 acres of land on property
located at the north corner of IH-635 and Freeport Parkway, at the request of
Mick Granlund, O'Brien & Associates.
STAFF REP.: Marcie Diamond
DRC DATE: November 30, 2006 and December 7, 2006
CONTACT: Kenneth M. Griffin, P.E., Dir.of Engin
COMMENT STATUS: /PRELIMINARY
PROJECT ID# SPA-06-0068
Works 972/304-3686
See comments under Replat.