Loading...
ST9905-CS061031&.1d I / /n4 w' TEXAS DEPARTMENT OF LICENSING AND REGULATIO s Compliance Division/ARCHITECTURAL BARRIERS P.O. Box 12157 Austin, Texas 78711 (512)463 -3211 (877)278 -0999 FAX(512)475-2886 EmailAddress: lechinfo.abCwJicense.state.Mus Internet Address: www.license.state-Lr-us TRANSYSTEMS CORPORATION OCT -31 -2006 3010 LBJ FRWY. #990 DALLAS, TX 75234 Re: N/A EABPRJA7000022 ROADWAY & DRAINAGE IMPVMTS BETHEL ROAD I CITY LIMIT TO FREEPORT PKWY COPPELL, TX 75019 REVIEW COMPLETE - PLAN DISAPPROVAL Dear Sir / Madam Enclosed are the results of the plan review(s) completed on the referenced facility. Identified on the report are areas of nonconformance with accessibility standards adopted by the Texas Department of Licensing and Regulation for purposes of ensuring compliance with Texas Government Code, Chapter 469. Although deficiencies have been noted, the referenced project may be eligible for inspection approval if constructed in accordance with the Texas Accessibility Standards. Items which are the responsibility of the owner should be referred to the appropriate person for action. The building or facility owner must request an inspection from the Department (or a Department authorized provider of inspection services) no later then thirty (30) days after the completion of construction. If the completion date provided on the Project Registration Form is no longer correct, notify this office (in writing) of the revised completion date, as soon as possible, This determination does not address applicability of the Americans with Disabilities Act (ADA), (P.L. 101 -336), or any other state, local or federal requirement. For information on the ADA, call the ADA Hotline, (800)949 -4232 or the United States Department of Justice at (202)514 -0301. Please reference the Department assigned project number in all future correspondence pertaining to this project. Questions concerning this matter should be directed to MARIO RUIZ TR. at (512)463 -3211. ENCLOSURE MR Austin Headquarters: E.O. Thompson State Office Building • 920 Colorado - Austin, Texas 78701 TEXAS DEPARTMENT OF LICENSING AND REGULATION PLANS AND SPECIFICATIONS REVIEW WORKSHEET Article 9102, T.C.S. PROJECT: ROADWAY & DRAINAGE IMPVMTS BETHEL ROAD I FACILITY: N/A OWNER: CITY OF COPPELL ARCHITECT: TRANSYSTEMS CORPORATION REVIEWER: RUIZ JR., MARIO PROJECT NO.: HABPRJA7000022 REVIEW : EAB2007066809R PAGE: 1 DATE: 10/30/06 4 ACCESSIBLE ELEMENTS AND SPACES: TECHNICAL REQUIREMENTS * *PROJECT DESCRIPTION: RECONSTRUCTION OF ROADWAY FROM RURAL TO URBAN CONSISTING CF ROAD WORK WITH SIDEWALKS AND CURB RAMPS. * *APPLICATION: 4.1.2 ACCESSIBLE SITE: EXTERIOR SITE +++++++++++++++t+++++++++++++++++++++++ + + + + + + + + + ++ + + + + + + + + + + + + ++ + + + + ++ ** THIS IS NOT A TX DOT FUNDED PROJECT. ** +++++++++++++++++++++++++++++++++++++++ + + + + + + ++ + + + + + + + + + + ++ ++ + + + + + + + ++ UNACCEPTABLE 4.3 ACCESSIBLE ROUTE 4.3.7 Slope An accessible route with a running slope greater than 1:20 is a ramp and shall comply with 4.8. Nowhere shall the cross slope of an accessible route exceed 1 :50. * *Note: Although the cross slopes provided on the plans for the side- walks are acceptable. Verify that cross slopes on sidewalks that cross over driveways also do not exceed the 20 per TAS note above. * *Compliance with TAS is required. ** UNACCEPTABLE 4.4 PROTRUDING OBJECTS 4.4.1 General * *Note: verify that any items such as but not limited to Fire Hydrants Electrical Junction Boxes, Signage, Shrubbery, etc. all must and fully comply with this section in its entirety as it may pertain to the matter at hand. Man -hole covers must comply with Sec. 4.5.2 of this report. PLANS AND SPECIFICATIONS REVIEW WORKSHEET Article 9102, T.C.S. PROJECT: ROADWAY & DRAINAGE IMPVMTS BETHEL ROAD I FACILITY: N/A REVIEWER: RUIZ JR., MARIO ACCEPTABLE * *Compliance with TAS is required. ** 4.5 GROUND AND FLOOR SURFACES 4.5.1 General * *Note: Acceptable per information provided. 4.5.2 Changes in Level PROJECT NO.: EABPRJA7000022 REVIEW : EA32007066809R PAGE: 2 DATE: 10/30/06 Changes in level up to 1/4 in (6 mm) may be vertical and without edge treatment (see Fig. 7(c)). Changes in level between 1/4 in and 1/2 in (6 mm and 13 mm) shall be beveled with a slope no greater than 1:2 (see Fig. 7(d)). Changes in level greater than 1/2 in (13 mm) shall be accomplished by means of a ramp that complies with 4.7 or 4.8. "Note: For man -hole covers, compliance with above TAS note required. 4.6 PARKING AND PASSENGER LOADING ZONES UNACCEPTABLE 4.7 CURB RAMPS * *Note: City pedestrian elements & specifications were not provided. Only TxDot Specifications provided. If this project is not a TxDot funded project, TDLR is unable to accept the provided drawings for approval. Verify that all provided curb ramps fully comply with this Sec. 4.7 in its entirety on the Slopes, Width, Surfaces, Sides of Curb Ramp and any other item(s) in this section that may pertain to the matter at hand. * *Compliance with TAS is required. — (1) Texture * *Note: Verify that texture used on the curb ramps fully comply. Per TM 99 -15, The only curb ramp texture that TDLR is currently aware of that meets the intent of this standard are truncated domes per Sec. 4.29.2. Other textures such as grooves 1/4" deep, 3/4" wide, 2" apart and arranged so that water will not accumulate, may be acceptable provided that the surface are detectable underfoot which will be verified by the inspector. * *Compliance with TAS is required. ** (2) Contrast For purposes of warning, the full width and depth of curb ramps shall have a light reflective value and texture that significantly contrasts PLANS AND SPECIFICATIONS REVIEW WORKSHEET Article 9102, T.C,S. PROJECT: FACILITY: REVIEWER: UNACCEPTABLE PROJECT NO.: EABPRJA7000022 REVIEW EAB2007066809R PAGE: 3 ROADWAY & DRAINAGE IMPVMTS BETHEL ROAD I N/A RUIZ JR., MARIO DATE: 10/30/06 with that of adjoining pedestrian routes. **Compliance with TAS is required.** 4.8 RAMPS 4.9 STAIRS 4.10 ELEVATORS 4.11 PLATFORM LIFTS (Wheelchair Lifts) 4.12 WINDOWS 4 . 13 DOORS 4.14 ENTRANCES 4.15 DRINKING FOUNTAINS AND WATER COOLERS 4.16 WATER CLOSETS 4.17 TOILET STALLS 4.18 URINALS 4.19 LAVATORIES AND MIRRORS 4.20 BATHTUBS 4.21 SHOWER STALLS 4.22 TOILET ROOMS 4.23 BATHROOMS, BATHING FACILITIES, AND SHOWER ROOMS 4.24 SINKS 4.25 STORAGE 4.26 HANDRAILS, GRAB BARS, AND TUB AND SHOWER SEATS 4.27 CONTROLS AND OPERATING MECHANISMS 4.27.2 Clear Floor Space Clear floor space complying with 4.2.4 that allows a forward or a parallel approach by a person using a wheelchair shall be provided at controls, dispensers, receptacles, and other operable equipment. Controls and operating mechanisms located in alcoves deeper than 24" PLANS AND SPECIFICATIONS REVIEW WORKSHEET Article 9102, T.C,S. PROJECT NO.: EABPRJA7000022 REVIEW EAB2007066809R PAGE: 4 PROJECT: FACILITY: REVIEWER: ROADWAY & DRAINAGE IMPVMTS BETHEL ROAD I N/A RUIZ JR., MARIO DATE: 10/30/06 require additional maneuvering area (see Figure 4(e)). **Note: Verify that if any pedestrian push buttom station are provlded A 30" x 48" clear floor space is provided next to the button complying with the TAS note above. Ensure that area provided does not exceed a 2\ slope in all directions. **Compliance with TAS is required.** 4.28 ALARMS 4.29 DETECTABLE WARNINGS 4.30 SIGNAGE 4.31 TELEPHONES 4.32 FIXED OR BUILT-IN SEATING AND TABLES 4.33 ASSEMBLY AREAS 4,34 AUTOMATED TELLER MACHINES 4.35 DRESSING AND FITTING ROOMS 5 RESTAURANTS, CAFETERIAS, SNACK BARS, AND VENDING AREAS 5 . 1 GENERAL 5.2 COUNTERS AND BARS 5.3 ACCESS AISLES 5.4 DINING AREAS 5.5 FOOD SERVICE LINES 5.6 TABLEWARE AND CONDIMENT AREAS 5.7 RAISED PLATFORMS 5.8 VENDING MACHINES ~~ OTHER EQUIPMENT 5.9 QUIET AREAS (Reserved) 6 MEDICAL CARE FACILITIES 6 . 1 GENERAL 6,2 ENTRANCES PLANS ~~ SPECIFICATIONS REVIEW WORKSHEET Article 9102, T.C.S. PROJECT NO.: EABPRJA7000022 REVIEW EAB2007066809R PAGE: 5 PROJECT: FACILITY: REVIEWER: ROADWAY & DRAINAGE IMPVMTS BETHEL ROAD I N/A RUI Z JR., MARIO DATE: 10/30/06 6.3 PATIENT BEDROOMS 6.4 PATIENT TOILET ROOMS 6.5 SIZE OF AREAS OF RESCUE ASSISTANCE 6.6 INFORMATION COUNTERS AND NURSES STATIONS 7 BUSINESS AND MERCANTILE 7. 1 GENERAL 7.2 SALES AND SERVICE COUNTERS, TELLER WINDOWS, INFORMATION COUNTERS 7.3 CHECK-OUT AISLES 7.4 SECURITY BOLLARDS AND TURNSTILES 8 LIBRARIES 8.1 GENERAL 8.2 READING AND STUDY AREAS 8.3 CHECK-OUT AREAS 8.4 CARD CATALOGS AND MAGAZINE DISPLAYS 8.5 STACKS 9 ACCESSIBLE TRANSIENT LODGING 9.1 HOTELS, MOTELS, INNS, BOARDING HOUSES, DORMITORIES, RESORTS, ETC 9.2 REQUIREMENTS FOR ACCESSIBLE UNITS, SLEEPING ROOMS AND SUITES 9.3 VISUAL ALARMS, NOTIFICATION DEVICES AND TELEPHONES 9.4 OTHER SLEEPING ROOMS AND SUITES 9.5 SHELTERS, HALFWAY HOUSES, GROUP HOMES, OTHER ESTABLISHMENTS. 10 TRANSPORTATION FACILITIES 10 . 1 GENERAL 10.2 BUS STOPS AND TERMINALS 10.3 FIXED FACILITIES AND STATIONS PLANS AND SPECIFICATIONS REVIEW WORKSHEET Article 9102, T.C.S. PROJECT NO.; EABPRJA7000022 REVIEW EAB2007066809R PAGE: 6 PROJECT: FACILITY: REVIEWER: ROADWAY & DRAINAGE IMPVMTS BETHEL ROAD I N/A RUIZ JR., MARIO DATE: 10/30/06 10.4 AIRPORTS 10.5 BOAT AND FERRY DOCKS (Reserved)