Loading...
ST9905-ES030811H E C I T Y O F COPPELL ~;~ ~. ~~~~ e X A S , 8 August 11, 2003 Emerson Properties 10005 Technology Boulevard W. Suite 151 Dallas, Texas 75220-4338 RE: Bethel Road I / ST 99-OS TE Freeport North Land II, LTD. Parcel 6 -Right-of--Way Parcel 6E -Temporary Construction Easement Dear Sir: .~ The City of Coppell is currently working with the engineering firm of TranSystems Corporation to design Bethel Road I, from the west City limits to Freeport Parkway. The project consists of the widening of the existing two-lane asphalt roadway to a four-lane divided roadway with unproved drainage. The project is in the final design phase and the City is in the process of acquiring the right-of--way and easements necessary to construct the project. There are ten right- of-way parcels, three slope easements, and fifteen temporary construction easements to be acquired within the project limits. It will be necessary to acquire right-of--way, and a 10-foot temporary construction easement on property that is owned by Emerson Properties. The required right-of--way is a corner clip at the intersection of Royal Lane and Bethel Road. The temporary construction easement will provide the contractor with sufficient work area to construct the roadway. The temporary construction easement is not filed with Dallas County, so there will not be a permanent encumbrance on your property associated with this easement. With this letter I am providing a copy of the right-of-way and temporary construction easement documents necessary for the construction of Bethel Road I. Please review the enclosed documents and let me know if you have any questions or if you wish to view the construction plans. Franchise utility relocations have started and more will begin once all of the right-of--way is acquired. It is anticipated that construction will begin in April 2004. Four consideration of this matter is appreciated. Sincerely, ~~k: wvl Tuy~~~ Suza>fi aylor CIP rdinator 972-304-7019 Enclosures 2 5 5 P A F K W A Y * P O .BOX 9 4? 8 * C O P P E L L T X 7 5 G 1 9 * TEL 9 7 2 1 4 6 2 0 0 2 2 * FAX 9 7 2/ 3 0 4 3 6 7 3