August 11, 2003
Texas Dugan Limited Partnership
Ms. Jeanne Coyle
5495 Belt Line Road
Suite 360
Dallas, Texas 75254-7644
RE: Bethel Road I / ST 99-OS
Parcel 9 -Right-of--Way /Parcel 9E -Temporary Construction Easement
Parcel 11 -Right-of--Way /Parcel 11 E -Temporary Construction Easement
Dear Ms. Coyle:
The City of Coppell is currently working with the engineering firm of TranSystems Corporation
to design Bethel Road I, from the west City limits to Freeport Parkway. The project consists of
the widening of the existing two-lane asphalt roadway to a four-lane divided roadway with
improved drainage. The project is in the final design phase and the City is in the process of
acquiring the right-of-way and easements necessary to construct the project. There are ten right-
of-way parcels, three slope easements, and fifteen temporary construction easements to be
acquired within the project limits. It will be necessary to acquire right-of--way and a 15-foot
temporary construction easement on Parcel 9, and right-of--way and a 10-foot temporary
construction easement on Parcel 11. The required right-of--way on Parcel 9 is a corner clip at the
intersection of Freeport Parke/ay and Bethel Road. On Parcel 11, additional right-of--way will be
required at the intersection of Freeport Parkway and Bethel Road in order to accommodate a
proposed right-hand turn lane. The temporary construction easements will provide the contractor
with sufficient work area to construct the roadway. The temporary construction easements are
not filed with Dallas County, so there will not be a permanent encumbrance on your property
associated with these easements
With this letter I am providing a copy of the right-of-way and temporary construction easement
documents necessary for the construction of Bethe] Road I. Please review the enclosed
documents and let me know if you have any questions or if you wish to view the construction
plans. Franchise utility relocations have started and more will begin once all of the right-of--way
is acquired. It is anticipated that construction will begin in April 2004
Your consideration of this matter is appreciated.
Sincerely,
Suzan ylor
CIP C dinator
972-304-7019
Enclosures