Loading...
ST9905-ES041123Page 1 of 2 Suzan Taylor - RE: Easements From: "Brook Barefoot" <Brook.Barefoot@dukeconstructiononline.com> To: "Suzan Taylor" <staylor@ci.coppell.tx.us> Date: 11/23/2004 4:39 PM Subject: RE: Easements CC: "Karen Correnty" <Karen.Correnty@dukerealty.com> Suzan, I believe what I sent you had original signatures, so you should be able to proceed with it. BB -----Original Message----- From: Suzan Taylor [mailto:staylor@ci.coppell.tx.us] Sent: Tuesday, November 23, 2004 4:25 PM To: Brook Barefoot Subject: RE: Easements Brook: Does the right-of-way deed you sent have the original signatures -the deed looks like a copy to me and that is why I was asking. We are glad to file the documents, but we will need the originals to file. Since the right-of-way and the temporary construction easements are contained within one document we will go ahead and record those. They expire in two years. Would you check and see if we received the original signatures. Thanks »> "Brook Barefoot" <Brook.Barefoot@dukeconstructiononline.com> 11/23/2004 4:13:25 PM »> Suzan, I think it has been our expectation that the City of Coppell would file the Bethel Road right-of-way dedication documents in conjunction with the overall project. As far as the temporary construction easements go, I don't think we care whether or not those are recorded. I've copied Karen Correnty in Duke's legal department on this a-mail so she can let us know if she thinks differently about either one of those matters. Good luck with the Emerson parcel at Royal Lane. They are trying to work with us to dedicate the overall parcel to the property owners' association, and I think our position is that they should create two separate legal descriptions so that one parcel could go to the POA and one to the City for the needed corner clip. Please let me know if you have any additional comments or questions. Good luck with the commencement of the project. BB file://C:1Documents%20and%20Settings\staylor\Local%20SettingslTemplGW} 00001.HT... 11/24/2004 Page 2 of 2 -----Original Message----- From: Suzan Taylor [mailto:staylor@ci.coppell.tx.us] Sent: Monday, November 22, 2004 10:21 AM To: Brook Barefoot Subject: Easements Brook: I appreciate the easements - we only have the Emerson parcel left to acquire on this project. Not having much luck with them. We have resolved our issues with the Corps of Engineers and will be revising our permit to exclude the section of stream, from Freeport Parkway to Loch Lane. The project should advertise in the 1st quarter of 2005. I just want to make sure of the following: Is Duke going to file the easements with the county and if so, we will need a copy of the filed easements with the page and volume number for our records. Thanks file://C:1Documents%20and%20Settings\staylorlLocal%20Settings\Temp\GW} 000O1.HT... 11/24/2004