September 29, 2004
Mr. Steve Brown
JSCP Partnership LP
160 I Elm Street, Suite 300
Dallas, Texas 75201-7254
RE: Sandy Lake Road / ST 99-02A
Right-of-Way / Temporary Slope Easement
Dear Mr. Brown:
This is a follow-up to our August 19, 2004 letter regarding the city's need for right-of-way and a
temporary slope easement on your property. The easements are necessary for the reconstruction of Sandy
Lake Road to a four-lane divided roadway with improved drainage The improvements will be
constructed in two phases. This phase of construction begins at S.H. 121 and ends just east of the Coppell
Road N. intersection with Sandy Lake Road, and includes the intersection improvements on Coppell
Road. The second phase of construction begins at the end of phase one improvements and extends
eastward to the intersection of Sandy Lake Road with Denton Tap Road. Construction of the second
phase of improvements is scheduled to start in mid 2007.
The City of Coppell is offering $250 per square foot for the permanent right-of-way. This is the land
value as shown in the Dallas Central Appraisal District. The right-of-way is necessary for the
construction of roadway improvements during both phases of construction, The elevation of Coppell
Road will be raised by as much as five foot in order to tie in with the reconstructed Sandy Lake Road.
The proposed ground elevations will not tie into the existing ground elevations within the limits of the
right-of-way and the city will need to obtain a temporary slope easement. Permanent utility easements
are usually acquired at one-half of the land value. The value of a temporary slope easement is based on a
'temporary lease' of a permanent utility easement at a 5% return to the owner. The temporary slope
easements will not be filed with Dallas County, and expire upon completion of the first phase of the
project
This letter constitutes an offer from the City of Coppell for the acquisition of the easements as follows:
1. Acquisition of permanent right-of-way at $2.50/sq. ft. x 741 sq. ft.
2 Acquisition of temporary slope casement at ($1 25/sq ft x 7667 sq. ft) x 5%
$1,852.50
479.19
T 013]
$2,331.69
Construction is scheduled to start in the 151 quarter of 2005 and we need to acquire the easements as soon
as possible Enclosed are copies of the easement documents. If the above offer is acceptable, please sign
below and return to this office. Once the letter is received, the process for payment of the $2,33 I .69 can
start. When the check is ready, we can arrange a mutually agreeable method to exchange the documents
and the check.
255 PARKV\/AY * POBOX 9476 * COPPr-LL Tx 7~)O 19 * TEL. 972/462 0022 * FA,X 972/304 3673
-,
--
Your consideration of this matter is appreciated and should you have any questions, please contact myself
or Suzan Taylor at 972-304-7019
Sincerely,
1\~ ;fAt-
Kenneth M, Griffin, PE.
Director of Engineering/Public Warks
Office Y72/304-3686
Fax 972/304-7041
E-mail kgriffin01ci.coppelltx.us
JSCP PARTNERS, L.P., a Texas limited partnership
By: James E Sowell C
By:
Enclosures
-::fuxlitioned upon City's construction, at its expense, a 3)' access drive as described in your letter
dated M3rch 29, 2005.