Loading...
ST9902-ES040803 -- THE.CiTY.OF Mr. Abraham Varughese 100 Branchwood Trail Coppell, Texas 75019 COPPELL ~~~~~.* ~~,91 ~ f~~~7~~ f:~~~ q X 1\ .s \ \') August 3,2004 RE: Sandy Lake Road / ST 99-02A Lot 1, Block A, Oakbend Addition Right-of-Way / Sidewalk & Utility Easement / Temporary Slope Easement Dear Mr. Varughese: The City ofCoppell is currently working with the engineering firm of Teague Nail and Perkins on the design of improvements for Sandy Lake Road (west City limits to North Coppell Road) and Royal Lane (Sandy Lake Road to Northpoint). The existing two-lane asphalt roads will be replaced with four-lane divided, concrete roadways with improved drainage. An eight-foot hike and bike trail will be constructed along the south side of Sandy Lake Road, from State Road eastward to North Coppell Road. The project is in the final design phase and the City is in the process of obtaining the right-of-way and easements necessary to construct the project. It will be necessary to obtain right-of-way, a sidewalk and utility easement, and a temporary slope easement on property that is owned by you. The right-of-way is necessary for the construction of a retaining wall along the south side of the eight-foot hike and bike trail. The proposed roadway and trail are located further to the south and closer to the existing eight-foot brick wall than the existing road. The bottom elevation of the brick wall is approximately six foot higher than the elevation of the proposed trail. The retaining wall will allow the proposed ground elevations to be tied into the existing ground elevations at the required grade without impacting the existing eight-foot brick wall. A temporary slope easement will be required for the slope grading between the retaining wall and existing brick wall. The temporary slope easement will not be filed with Dallas County, and will expire upon completion of the project. A 35'x 35' visibility triangle was platted as a part of Lot 1, Block A, Oakbend Addition. The City needs to obtain sidewalk and utility easement rights within the visibility triangle. The eight- foot hike and bike trail will have an accessibility ramp at the southeast comer of the Branchwood Trail/Sandy Lake Road intersection. The construction of the trail and accessibility ramp will require additional area outside of the existing right-of-way. The 35'x35' triangle will also provide additional area for the construction or relocation of utilities. With this letter I am providing a copy of the right-of-way, sidewalk and utility easement, and temporary slope easement necessary for the construction of Sandy Lake Road. Please review the enclosed documents and let me know if you have any questions or if you wish to view the construction plans . Your consideration of this matter is appreciated. ~i~cerely, .,.-:: ~Q'IA \ Ch, lev u J'aylor CIP rdinator /972-304-7019 Enclosures 255 PARKWAY * P.O BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/3043673