ST9902-ES050715 eTXU Sj o,~OL..A- July 15,2005 City of Coppell Attn: Mr. Ken Griffin 255 Parkway Blvd. Coppell, TX 75019 RE: W. Sandy Lake Rd. Improvements Mr. Griffin: Per our meeting on Monday, July 11, I have listed below the 2 options for the relocation of the existing overhead electric lines currently located on the South side of the ROW ofW. Sandy Lake Rd, as per your request. The 2nd option is per your request due to conflicts in obtaining the required easements from the current landowners to allow adequate ROW space to place the relocated line on the South side of the ROW. 1. Relocate line back on South side of ROW using wood poles and crossing underneath Sandy Lake Rd. and using 3 concrete poles as originally designed. The cost to TXU Electric Delivery is a total of $550,935, This includes $309,971 to relocate the overhead line back to the South ROW, and $240,964 to relocate the underground lines to the new pole locations. There would be no cost to the City of Coppell for this option, if adequate ROW is available, 2, Relocate line back on South side of ROW, but this time using underground duct bank system underneath Sandy Lake Rd. and along the South ROW to property being obtained in an easement from Coppell Bible Fellowship Church, at that point using the original design of wood poles along the South ROW along the entire length of the project to SH 121. The total cost for this route is $684,633. This includes $273,742 to relocate the overhead lines up to and including the Church's property, and $410,891 to place additional underground from the original crossing location to the Church's property. The cost to the City of Coppell for this option would be $133,698, which is the difference between option 1 above and option 2. These prices are not a rough estimate, but rather cost estimates that would be used to construct the project should the City agree to pay the price difference. Therefore, unless something changes, this price ($133,698) would be the price that the City of Coppell would pay in order for option 2 to be constructed as designed, If you should have any questions as to what is included in the design, or for a layout ofthe expanded underground construction, please do not hesitate to call me at 214/486-4245 or email atrbrewstl((vtxued.com. Sincerely, Richard Brewster Senior Project Designer Cc: Jerry Bates, Steve Taylor, Jim Chase, Suzan Taylor