ST9902-ES040628
.-.
June 28, 2004
Latour p~rs, LP
HC 31 Box 61
Happy Jack, . zona 86024-9710
RE:
-
e Road I ST 99-02A
ement / Temporary Construction Easement
Dear Sir:
The City ofCoppell i currently working with the engineering firm of Teague Nal1 and Perkins on
the design of improve ents for Sandy Lake Road (west City limits to North Coppell Road) and
Royal Lane (Sandy L e Road to Northpoint). The existing two-lane asphalt roads will be
replaced with four-lane 'vided, concrete roadways with improved drainage. An eight-foot hike
and bike trail will be co cted along the south side of Sandy Lake Road, from State Road
eastward to North Coppell . oad. The project is in the final design phase and the City is in the
process of obtaining the rig -of-way and easements necessary to construct the project. It will be
necessary to obtain a draina easement and a temporary construction easement on property that
is owned by Latour Partners, P.
A drainage easement will be req ired for the installation of 30-inch RCP, and the construction of
a headwall and a section of rip-ra outfall channel. The proposed storm drain improvements will
tie into an existing ditch that flow to the north. There is currently a 30-inch CMP under Sandy
Lake Road that will be removed . h this project. The temporary construction easement will
provide sufficient area in which to c ruct the storm drain improvements. It will not be filed
with Dallas County and will expire upo completion of the projecto
With this letter I am providing a copy of e drainage easement, and the temporary construction
easement necessary for the construction f Sandy Lake Road. Please review the enclosed
documents and let me know if you have an questions or if you wish to view the construction
plans. Your consideration of this matter is ap eciated.
Sincerely,
Suzan Taylor
CIP Coordinator /972-304-7019
Enclosures