Loading...
Coppell Trade 2-LR061110/~ ~/ ~ i~ F'ARC40 CONSUyTANT~, INC. 11440 Reeder Rd. • Dallas, Texas 75229 Tel. 214-352-4100 Fax. 214-352-4811 Page 1 of 1 WATER PRESSURE INJECTION OBSERVATION REPORT Client: Holt Lunsford Commercial Project: Coppell Trade Center Building D Coppell, Texas Injection Contractor: Mcfadden & Miller Date of Service: 11 / 10/06 Project No: M06-1165 Location: Building pad -west half Area injected previously: Approximately 12,000 square feet of 3rd pass Area injected (on this day): Approximately 21,800 square feet of 3rd pass Area injected (to date): Approximately 33,800 square feet of 3rd pass Gallons of Water used: 49,000 Surfactant Used: lgallon / 3,500 gallons of water Injection Pressure (psi): 90 Injection Probe Spacing (feet): 5 Injected Depth Interval (in.) until refusal: 12 Total Depth of Injection (feet): 12 Remarks: Time Start 7:30 a.m. / 2:00 p.m. End 10:00 a.m. / 3:00 p.m. Technician: Gary Moore, C.E.T. Specified Requirements as per manufacturer 50 psi-100psi 5 feet (max.) 12 inches 12 feet Water Meter Reading 8945600 8994600 Checked by: Distribution: Holt Lansford Commercial -Ken Newman Mcfadden & Miller -Jon Jacobson City of Coppell -Lee Stone LIMITATIONS: This report presents test results (at particular locations noted) based on data obtained from specific samples selected for testing. Fargo Consultants, Inc. assumes no responsibility for variation in quality, performance, Feature or conditions beyond its control. This report is for the exclusive use of the person(s) to whom it is addressed and may not be reproduced except iu full without the written approval of Fargo Co~uultants, Ina Geotechnical Engineering • Construction Materials Testing • Environmental Services www. dallasfargo. com