Loading...
Coppell Trade 2-LR061109.~ ,t ~, FA;LUO COIv1bLL`Iea.NTS, iNC. ] 1440 Reeder Rd. ~ Dallas, TX 75229 Tcl. (214) 352-4100 • Fax (214) 352-4811 CONCRETE COMPRESSIVE STRENGTH REPORT CLIENT: Holt Lunsford Commercial Sample Date: 11/09/06 PROJECT: Coppell Trade Center Building D Project No.: M06-1165 Coppell, Texas ~ CONCRETE INFORMATION- _ I CONTRACTOR: Mcfadden and Miller TICKET NO.: 359442 CONCRETE SUPPLIER: TxT AMBIENT TEMP.(°F): 66 PLANT/TRUCK: 141 / 64 CONCRETE TEMP.(°F): 73 MIX ID NUMBER: 8205 TIME BATCHED: 6 : 06 a.m. AIR (%): 3 .5 (ASTM C 231) TIME SAMPLED: 6: 35 a.m. WATER ADDED (gal): 0 WEATHER CONDITION: Cloudy SLUMP (inches): 4 (ASTM C 143) LOCATION OF PLACEMENT: Paving-parking lot, 20' S by 35'W from SE corner of building pad CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS DESIGN STRENGTH OF CONCRETE ( ----- 3500 psil 28 days) CYLINDER AGE DATE ' TOTAL LOAD ' COMPRESSIVE Percent of Design Strength NUMBER (Days) TESTED (pounds) STRENGTH (%) -. - _ --_-- - I----- --~ (Psi)- _-~ -- - - 108 X70 11 7 /16;'06 i lA _ 3-850 _- 12$~ - _. _ _- •- __ - , -_ __ -_ 1B ' 2_8- _1.2_/7'05_ i_ 13.91.640__- ___4940_ 1650 ~-- - -- _ --1C-- 28 f 12,'Z;'06 ', -38,_.96.0__ 4.910 _-_- 164---- 1 D ~ H o 1 d _ - L -- _ _ - - -- Cylinders Type: Nominal Cylinder Size 6"X12" (ASTM C 39) Specifications: Making and curing (ASTM C 31) Testing Methods (ASTM C 39) Remarks: Technician: n Allen Distribution: Holt Lansford Corunercial - I-:en '~e~,mzan Mcfadden & Miler - Jon Jacobson 'ity of Coppell - Larry Davis FARGO CONSULTAN S, INC. Checked by: _ _ Gary Moo e C.E.T. CMT Manager Geotechnica! Engineering ~ Construction Materials Testing ~ Environmental Services www. dallasfargo. com .~~~, ;, . a FFili.GO UUN ~! LTAlti PS, iNC. 11440 Reeder Rd. ~ Dallas, TX 75229 Tel. (214) 352-4100 • Fax (214) 352-481 1 CONCRETE COMPRESSIVE STRENGTH REPORT CLIENT: Holt Lunsford Commercial Sample Date: 11/09/06 PROJECT: Coppell grade Center Building n Project No.: M06-1165 Coppell, Texas I CONCRETE INFORMATION -_ CONTRACTOR: Mcfadden and Miller TICKET NO.: 359595 CONCRETE SUPPLIER: Txz AMBIENT TEMP.(°F):70 PLANT/TRUCK: 141 / 71 CONCRETE TEMP.(°F): 78 MIX ID NUMBER: 8205 TIME BATCHED: 7:57 a.m. AIR(%): 3.6 (ASTMC231) TIME SAMPLED: 8:30 a.m. WATER ADDED (gal): 0 WEATHER CONDITION: Partly Cloudy SLUMP (inches): 4 1/2 (ASTMC 143) LOCATION OF PLACEMENT: Paving-parking lot, 40' S by 90'W from SE corner of building pad CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS DESIGN STRENGTH OF CONCRETE (3500 psi! 28 days ) D CYLINDER ~ AGE DATE OMPRESSIVE ' Percent TOTAL LOA of Design Strength NUMBER ~ (Days) TESTED ~ I (pounds) STRENGTH (%) _ - -- - - _ - 2F~ _ _ 7 ~~16106 ~ 93, 7.80 ' --__ 3320-- ~_ _ _ - 95~ __ 2B---_ ! 28 12/7/06_ ~ - 134,.210 '-- - 475.0.. -__~- -- --1_3__6.0 _ -- - -- 2C-- ~ - - _28_ _I 1217/06 _~ _ -_136-050_. _ .48.10. -- -- 137. a_- - _, -ZD ! _- xola --- - I - - ! - Cylinders Type: Nominal Cylinder Size 6"X12" (ASTMC 39) Specifications: Making and curing (ASTMC 31) Testing Methods (ASTMC 39) Remarks: Technician: D Allen Distribution: Holt Lansford Commercia~ - I<.er. i]ew7nan Mcfadden & Miller - Jor. JacObsOn r'ity o[ Coppell - Larry Davis FARGO CONSULT TS, INC. Checked by: Gary Moor C.E.T. CMT Manager Geotechnica! Engineering i Construction Materials Testing i Environmental Services www. dallasfargo. com ~v.. ~ .:~~ ~ ~'~':.~ ~ 11440 Recdcr Rd. ~ Dallas, TX 75229 ~aHCa eoxsur,iarrTs, txC. Tel. (214) 352-4100 ~ Fax (Z 14) 352-481 L CONCRETE COMPRESSIVE STRENGTH REPORT CLIENT: Holt Lunsford Commercial Sample Date: 11/09/06 PROJECT: Coppell Trade Center Building D Project No.: M06-1165 Coppell, Texas j _CONCRETE-.INFORMATION - j CONTRACTOR: Mcfadden and Miller TICKET NO.: 359780 CONCRETE SUPPLIER: Txz AMBIENT TEMP.(°F): .1 PLANT/TRUCK: 141 / 65 CONCRETE TEMP.(°F): 79 MIX ID NUMBER: 82 05 TIME BATCHED: 9:35 a.m. AIR(%): 3.5 (ASTMC231) TIME SAMPLED: 10:35 a.m. WATER ADDED (gal): 0 WEATHER CONDITION: Partly Cloudy SLUMP (inches): 4 1/2 (ASTM C 143) LOCATION OF PLACEMENT: Paving-parking lot, 25' S by 130'~~~T from SE corner of building pad CONCRETE CYLINDER COMPRESS IVE STRENGTH TESTS ~~ DESIGN STRENGTH OF CONCRETE ( 3500 psil 28 days ) _.-_ ~_.- _.T T ~ I' AGE DATE TOTAL LOAD CYLINDER COMPRESSIVE Percent of Design Strength ~ NUMBER ~ (Days) ~ TESTED (pounds) STRENGTH ~ (%) - I , - _~- - (Psi - _ -- - - -~ 3h 7 11/16.1!06 - _i06 920_ ~ __ __3780-_ _ _ 10_8_-_ I ~ 2 X7__!06 _-3.8,.67.0 3B ; 28 _4900 - 140_ -- - - _ _ - 3C_ __ __+ _28 ~_ 127:!06 j_-_ 14.0_, ?20____ __ - -_ 4980. ~_ -_ _ 14.2 0 -- 3D I Hold _ ~ I Cylinders Type: Nominal Cylinder Size 6"X12" (ASTM C 39) Specifications: Making and curing (ASTM C 31) Testing Methods (ASTM C 39) Remarks: Technician: D Allen Distribution: Holt Lansford Commercial - Ken 'Newman Mcfadder. k Miller - Jon Jacobsen %'ity of Coppell - Larry Davis FARGO CONSULT NTS, INC. Checked by: Gary Moo C.E.T. CMT Manager Geotechnical Engineering i Construction Materials Testing i Environmental Services www. da!lasfargo. com . ,gig SARGO CONStJL'PANTS, INC. 11440 Reeder Rd. ~ Dallas, TX 75229 Tel. (214) 352-4100 • Fax (214) 352-4811 CONCRETE COMPRESSIVE STRENGTH REPORT CLIENT: Holt Lunsford Commercial Sample Date: 11/09/06 PROJECT: Coppell Trade Center Building D Project No.: M06-1165 Coppell, Texas CONCRETE INFORMATION CONTRACTOR: Mc f adden and Mi 11 er TICKET NO.: 359999 CONCRETE SUPPLIER: Txz AMBIENT TEMP.(°F): 73 PLANT/TRUCK: 141 66 CONCRETE TEMP.(°F): 84 MIX ID NUMBER: 8205 TIME BATCHED: 11:44 a.m. AIR (%): 3 . 5 (ASTM C 231) TIME SAMPLED: 12:05 p.m. WATER ADDED (gal): 0 WEATHER CONDITION: Partly cloudy SLUMP (inches): 4 (ASTM C 143) LOCATION OF PLACEMENT: Paving-parking lot, 6' S by 200' W from SE corner of building pad ~' CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS DESIGN STRENGTH OF CONCRETE (3500 psi! 28 days ) CYLINDER AGE 1 DATE TOTAL LOAD COMPRESSIVE Percent of Design Strength NUMBER (Days) TESTED (pounds) STRENGTH (%) -_. , -_- --- - _- _ . __ (Psi} -- 4B -- 28_ f 1~i16/06 , 105,-_740 3740.._.._ L_ _ _____ _- 2;7/06 _ 138,690 -. __4910 __ 4C ', 28 _. ___12/7./_0_6 138_, 50J- -_- 490.0 - --- 4D Hold I-_- _ Cylinders Type: Nominal Cylinder Size 6"X12" (ASTM C 39) Specifications: Making and curing (ASTM C 31) Testing Methods (ASTM C 39) Remarks: Technician: D Allen Distribution: Holt Lansford Commercia'i - Ken ?]ewman Mefadden & Miller - Jon Jacobson ~'~ty of Coppell - Larry Davis 10 7 $ - --- 140~ _ 14.Q ° ------- --- ~I _ J FARGO CONSULTANTS, INC. Checked by: Gary Moo C.E.T. CMT Manager Geotechnical Engineering i Construction Materials Testing i Environmental Services www. da!lasiargo. com gyp.:.. N>. _ 4, l~ ~ ~ ~ r F'A4LU0 CGty aULTAN 5, INC. 11440_ Reeder Rd. ~ Dallas, TX 75229 Tel. (2 t4) 352-4100 ~ Fax (214) 352-481 I CONCRETE COMPRESSIVE STRENGTH REPORT CLIENT: Holt Lunsford Commerc;~al Sample Date: i1 %09/06 PROJECT: Coppell Trade Center Building D Project No.: M06-1165 Coppell, Texas CONCRETE INFORMATION CONTRACTOR: Mcfadden and Miller TICKET NO.: 360136 CONCRETE SUPPLIER: Txz AMBIENT TEMP.(°F): 73 PLANT/TRUCK: 141 / 715 CONCRETE TEMP.(°F): 84 MIX ID NUMBER: 8205 TIME BATCHED: 1:24 p.m. AIR(%): 3.6 (ASTMC231) TIME SAMPLED: 1 : 55 p.m. WATER ADDED (gal): 0 WEATHER CONDITION: Partly Cloudy SLUMP (inches): 4 (ASTM C 143) LOCATION OF PLACEMENT: PavingiDrive, 20 ' S by 275' ~^1 from SE corner of building pad - -- ' CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS DESIGN STRENGTH OF CONCRETE (3500 psil 28 days) ' ~ CYLINDER I AGE DATE TOTAL LOAD ! COMPRESSIVE I Percent of Design Strength ~ NUMBER (Days) TESTED ~~, (pounds) STRENGTH ~ (%) - - - - - - -- - -- _- _ s i )- - - 5 A-- ~-- --_ __7 - : 11 i 16 l ~ 6 --10 < < $ 6 0 3 7 i 0 --- ---- -- 10.6 ~ - -- - 5B -~ -2.8 ._ 12!71'OE 1.391-0.00 _ - .' __ 4920 - - ' - ---- 1.41 °----- _. 5C I 2.8-- 12/7;06 --135,430__- -- 4790 ~-- _--137--- -_ 5D ~ Hold - -- - -- _ - - -- _ -- - - ---. _i - Cylinders Type: Nominal Cylinder Size 6"X12" (ASTM C 39) Specifications: Making and curing (ASTM C 31) Testing Methods (ASTM C 39) Remarks: Technician: D Allen Distribution: {olt Lansford Commercial - Ken Newman P~icfadden & Miller - Jon Jacobson City of Coppell - Larry Davis FARGO CONSULTANTS, INC. Checked by: Gary Moor C.E.T. CMT Mana er Geotechnical Engineering i Construction Materials Testing i Environmental Services www. dallasfargo. com ,._..... Y.... ' j 11440 Reeder Rd. • Dallas, TX 75229 Fe~tc~o ooxsvr.~wxTS, iac. Tel. (214) 352-4100 • Fax (214) 352-4811 CONCRETE COMPRESSIVE STRENGTH REPORT CLIENT: Holt Lunsford Commercial Sample Date: 11/09/06 PROJECT: Coppell Trade Center Building D Project No.: M06-1165 Coppell, Texas CONCRETE INFORMATION CONTRACTOR: Mcfadden and Miller TICKET NO.: 359442 AMBIENT TEMP.(°F): 66 CONCRETE TEMP.(°F): 73 TIME BATCHED: 6:06 a.m. TIME SAMPLED: 6:35 a.m. WEATHER CONDITION: Cloudy LOCATION OF PLACEMENT: Paving-parking lot, building pad CONCRETE SUPPLIER: Txz PLANTITRUCK:141 / 64 MIX ID NUMBER: 8205 AIR (%): 3 . 5 (ASTM C 231) WATER ADDED (gal): 0 SLUMP (inches): 4 (ASTM C 143) 20'S by 35'W from SE corner of CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS DESIGN STRENGTH OF CONCRETE (3500 psi/ 28 days ) CYLINDER NUMBER AGE (Days) DATE TESTED TOTAL LOAD (pounds) COMPRESSIVE STRENGTH si Percent of Design Strength (%) 1A 7 11 16 06 108 770 3850 110 1B 28 12 7 06 1C 28 12 7 06 1D Hold Cylinders Type: Nominal Cylinder Size 6"X12" (ASTM C 39) Specifications: Making and curing (ASTM C 31) Testing Methods (ASTM C 39) Remarks: Technician: D Allen Distribution: Holt Lansford Commercial - Ken Newman Mcfadden & Miller - Jon Jacobson City of Coppell - Larry Davis FARGO CONSULTANTS, INC. Checked by: Gary Moor C.E.T. CMT Manager Geotechnical Engineering i Construction Materials Testing ~ Environmental Services www. dallasfargo. com :............ Y..... j 11440 Reeder Rd. • Dallas, TX 75229 gnxao ooxsvzTaxTS, ixc. Tel. (214) 352-4100 • Fax (214) 352-4811 CONCRETE COMPRESSIVE STRENGTH REPORT CLIENT: Holt Lunsford Commercial Sample Date: 11/09/06 PROJECT: Coppell Trade Center Building D Project No.: M06-1165 Coppell, Texas CONCRETE INFORMATION CONTRACTOR: Mc f adden and Mi 11 er TICKET NO.: 359595 AMBIENT TEMP.(°F): 70 CONCRETE TEMP.(°F): 78 TIME BATCHED: 7 : 57 a.m. TIME SAMPLED: 8:30 a.m. WEATHER CONDITION: Partly Cloudy LOCATION OF PLACEMENT: Paving-parking lot, building pad CONCRETE SUPPLIER: Txz PLANT/TRUCK:141 / 71 MIX ID NUMBER: 8205 AIR (%): 3 . 6 (ASTM C 237) WATER ADDED (gal): 0 SLUMP (inches): 4 1/2 (ASTM C 743) 40'S by 90'W from SE corner of CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS DESIGN STRENGTH OF CONCRETE (3500 psi/ 28 days ) CYLINDER NUMBER AGE (Days) DATE TESTED TOTAL LOAD (pounds) COMPRESSIVE STRENGTH si Percent of Design Strength (°k) 2A 7 11 16 06 93 780 3320 95~ 2B 28 12 7 06 2C 28 12 7 06 2D Hold Cylinders Type: Nominal Cylinder Size 6"X12" (ASTM C 39) Specifications: Making and curing (ASTM C 31) Testing Methods (ASTM C 39) Remarks: Technician: D Allen Distribution: Holt Lansford Commercial - Ken Newman Mcfadden & Miller - Jon Jacobson City of Coppell - Larry Davis FARGO CONSULTANTS, INC. Checked by: Gary Moo C.E.T. CMT Manager Geotechnical Engineering i Construction Materials Testing i Environmental Services www. dallasfargo. com -: _. ..i..._,..... 11440 Reeder Rd. • Dallas, TX 75229 FAR.(30 OON6ULTANTB, INO. Tel. (214) 352-4100 • Fax (214) 352-4811 CONCRETE COMPRESSIVE STRENGTH REPORT CLIENT: Holt Lunsford Commercial Sample Date: 11/09/06 PROJECT: Coppell Trade Center Building D Project No.: M06-1165 Coppell, Texas CONCRETE INFORMATION CONTRACTOR: Mc f adden and Mi 11 er TICKET NO.: 359780 AMBIENT TEMP.(°F): 71 CONCRETE TEMP.(°F): 79 TIME BATCHED: 9:35 a.m. TIME SAMPLED: 10:35 a.m. WEATHER CONDITION: Partly Cloudy LOCATION OF PLACEMENT: Paving-parking building pad CONCRETE SUPPLIER: Txz PLANT/TRUCK:141 / 65 MIX ID NUMBER: 8205 AIR (%): 3 . 5 (ASTM C 231) WATER ADDED (gal): o SLUMP (inches): 4 1 /2 (ASTM C 143) lot, 25'S by 130'W from. SE corner of CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS DESIGN STRENGTH OF CONCRETE (3500 psi! 28 days ) CYLINDER NUMBER AGE (Days) DATE TESTED TOTAL LOAD (pounds) COMPRESSIVE STRENGTH si Percent of Design Strength (%) 3A 7 11 16 06 106 920 3780 108 3B 28 12 7 06 3C 28 12 7 06 3D Hold Cylinders Type: Nominal Cylinder Size 6"X12" (ASTM C 39) Specifications: Making and curing (ASTM C 31) Testing Methods (ASTM C 39) Remarks: Technician: D Allen Distribution: Holt Lansford Commercial - Ken Newman Mcfadden & Miller - Jon Jacobson City of Coppell - Larry Davis FARGO CONSULTANTS, INC. Checked by: Gary Moor C.E.T. CMT Manager Geotechnica/ Engineering i Construction Materials Testing i Environmental Services www.dallasfargo.com Y..... j 11440 Reeder Rd. • Dallas, TX 7_5229 FAR.(30 OONBULTANTS, iNa. Tel. (214) 352-4100 • Fax (214) 352-4811 CONCRETE COMPRESSIVE STRENGTH REPORT CLIENT: Holt Lunsford Commercial Sample Date: 11/09/06 PROJECT: Coppell Trade Center Building D Project No.: M06-1165 Coppell, Texas CONCRETE INFORMATION CONTRACTOR: Mc f adden and Mi 11 er TICKET NO.: 359999 AMBIENT TEMP.(°F): 73 CONCRETE TEMP.(°F): 84 TIME BATCHED: 11 :44 a.m. TIME SAMPLED: 12:05 p . m. WEATHER CONDITION: Partly Cloudy LOCATION OF PLACEMENT: Paving-parking lot, building pad CONCRETE SUPPLIER: Txz PLANTITRUCK:141 / 66 MIX ID NUMBER: 8205 AIR (%): 3 . 5 (ASTM C 231) WATER ADDED (gal): 0 SLUMP (inches): 4 (ASTM C 143) 6'S by 200'W from SE corner of CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS DESIGN STRENGTH OF CONCRETE (3500 psil 28 days ) CYLINDER NUMBER AGE (Days) DATE TESTED TOTAL LOAD (pounds) COMPRESSIVE STRENGTH si Percent of Design Strength (%) 4A 7 11 16 06 105 740 3740 107 4B 28 12 7 06 4C 28 12 7 06 4D Hold Cylinders Type: Nominal Cylinder Size 6"X12" (ASTM C 39) Specifications: Making and curing (ASTM C 31) Testing Methods (ASTM C 39) Remarks: Technician: D Allen Distribution: Holt Lansford Commercial - Ken Newman Mcfadden & Miller - Jon Jacobson City of Coppell - Larry Davis FARGO CONSULTANTS, INC. Checked by: Gary Moor C.E.T. CMT Manager Geotechnical Engineering ~ Construction Materials Testing i Environmental Services www.dallasfargo.com i 11440 Reeder Rd. • Dallas, TX 75229 - __ __ ___ FAx.oo ooxsvt.2pxTS, rrre. Tel. (214) 352-4100 • Fax (214) 352-4811 CONCRETE COMPRESSIVE STRENGTH REPORT CLIENT: Holt Lunsford Commercial Sample Date: 11/09/06 PROJECT: Coppell Trade Center Building D Project No.: M06-1165 Coppell, Texas CONCRETE INFORMATION CONTRACTOR: Mcfadden and Miller TICKET NO.: 3 6 013 6 AMBIENT TEMP.(°F): 73 CONCRETE TEMP.(°F): 84 TIME BATCHED: 1:24 p.m. TIME SAMPLED: 1 : 55 p.m. WEATHER CONDITION: Partly Cloudy LOCATION OF PLACEMENT: Paving/Drive, building pad CONCRETE SUPPLIER: TXI PLANT/TRUCK:141 / 715 MIX ID NUMBER: 8205 AIR (%): 3 . 6 (ASTM C 231) WATER ADDED (gal): o SLUMP (inches): 4 (ASTM C 143) 20'S by 275'W from SE corner of CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS DESIGN STRENGTH OF CONCRETE (3500 pail 28 days ) CYLINDER NUMBER AGE (Days) DATE TESTED TOTAL LOAD (pounds) COMPRESSIVE STRENGTH si Percent of Design Strength (%) 5A 7 11 16 06 104 860 3710 106 5B 28 12 7 06 5C 28 12 7 06 5D Hold Cylinders Type: Nominal Cylinder Size 6"X12" (ASTM C 39) Specifications: Making and curing (ASTM C 31) Testing Methods (ASTM C 39) Ret~'airt~s: Technician: D Allen Distribution: Holt Lansford Commercial - Ken Newman Mcfadden & Miller -Jon Jacobson City of Coppell - Larry Davis FARGO CONSULTANTS, INC. Checked by: Gary Moor C.E.T. CMT Manager Geotechnical Engineering i Construction Materials Testing ~ Environmental Services www.dallasfargo.com ;. _~.. ,/ _ _. • F1iRQ0 CONB>3LTANTB, INC. 11440 Reeder Rd. • Dallas, Texas 75229 Tel. 214-352-4100 Fax. 214-352-4811 Page 1 of 1 WATER PRESSURE INJECTION OBSERVATION REPORT Client: Holt Lunsford Commercial Project: Coppell Trade Center Building D Coppell, Texas Date of Service: 11/09/06 Project No: M06-1165 Injection Contractor: Mcfadden & Miller Location: Building pad -west half Area injected previously: Approximately 45,450 square feet of 2rd pass Area injected (on this day): Approximately 6,000 / 12,000 square feet of 2°d and 3rd pass Area injected (to date): Approximately 45,450 square feet of 2°d and 3ra pass Gallons of Water used: 58,000 Surfactant Used: lgallon / 3,500 gallons of water Injection Pressure (psi): 90 Injection Probe Spacing (feet): 5 Injected Depth Interval (in.) until refusal: 12 Total Depth of Injection (feet): 12 Remarks: Time Start 7:30 a.m. / 2:30 p.m. End 10:00 a.m. / 3:00 p.m. Technician: Gary Moore, C.E.T. Specified Requirements as per manufacturer 50 psi-100psi 5 feet (max.) 12 inches 12 feet Water Meter Reading 8939600 8945600 /'1M Checked by: Distribution: Holt Lansford Commercial -Ken Newman Mcfadden & Miller -Jon Jacobson City of Coppell -Lee Stone L[MITATIONS: This report presents test results (at particular locations noted) based on data obtained from specific samples selected For testing. Fargo Consultants, Inc. assumes no responsibility for variation in quality, performance, feature or conditions beyond its control. This report is for the exclusive use of the person(s) to whom it is addressed and may no[ be reproduced except in full without the written approval of Fargo Consultants, Inc. Geotechnical Engineering • Construction Materials Testing • Environmental Services www.dallasfargo.com