October 14, 1998
P9436 WO22
Don Moulton, PE
NCH Corporation
2727 Chemsearch Boulevard
Irving, Texas 75062
James Witt, City' Manager
City ot7 Coppell
PO Box 478
255 Parkway Blvd.
Coppell, Texas 75019
RE:
Drainage Master Plan Study- NCH Site, Coppell Industrial N. V. Site and Related Areas
in Coppell, TX
Dear Mr. Moulton and Mr. Witt:
Halff Associates is pleased to present this fee proposal for engineering services to prepare a
Master Drainage Plan for the NCH site, the 100 acre site west of the NCH site owned by Coppell
Industrial N. V. and adjoining areas along Bethel Road in Coppell, Texas. This area is located
within the drainage basin of Stream Gl. Generally, the setw'ices will consist of conceptual
drainage design, stream hydrology and hydraulics as necessary to develop and document a
Drainage Master Plan.
The entire engineering effort described in this proposal can be completed for a lump sum fee of
$45,000. The City of Coppell's share of this fee is $15,000, with NCH and other cooperating
land owners responsible for the remaining lump sum fee. Should the study cost exceed $45,000
due to project scope changes and/or additions requested by the property owners, the additional
costs will be born by the participating property owners and the City of Coppell's share will
remain capped at $15,000. A detailed work plan is attached as Exhibit A and a breakdown of thc
engineering fee is included as Exhibit B. Separate invoices will submitted on a monthly basis to
the City of Coppell for their portion of the fee and to NCH for the participating property owners
portion of thc fee. Invoices will be based on percent complete of the project tasks outlined in
Exhibit B. A suggested schedule is shown on Exhibit C.
Please call me at 214/346-6220 if you have any questions. We look forward to assisting you and
the City of Coppell with this important project. If this proposal meets with your approval, please
sign and return one copy to our office to indicate your authorization of the scope of work and fee
and our notice to proceed. Counterpart signatures are acceptable.
DALLAS · FORTW()RFH · HOUSTON · McALLEN
1 :qANSF'ORT/,TION · WATER RESOURCES · [ AND [3E~EI OPMENT · MUNICIPAL · ENVIRONMENTAL · STRUCTURAL
MECHAN 0AL · ELECTRICAL · S~IRVE',ING · GEOGRAPHIC INFORMATION SYSTEMS
ARt~;HiTE. CTURE * t AND3C&F[ ARCHITECTURE · PLANNING
Bill
· .- Halff Associates
1.2N(HNE}-RS · ,,\R('ttlTI,~('TS · S('lt~NTIS']'S
PLANNERS · SURVEY()RS
NCH Corporation
City of Coppell
October 14, 1998
Page 2
Sincerely,
HALFF ASSOCIATES, INC.
Walter E. Skipwith, PE
Vice President
NCH Corporation
APPROVED:
BY:
DATE:
City of Coppell
APPROVED:
BY: L
DATE:
· ., Halff Associates
l?l
PI.ANNI:RS *
City of Coppell
NCH Corporation
October 13, 1998
Page 3
EXHIBIT A
Scope of Work
Drainage Master Plan Study- NCH Site, Coppell Industrial N. V. Site and Related
Areas Along Bethel Road in the Stream G1 Watershed in Coppell, TX
I. Data Acquisition/Basemap Preparation
A Kickoff meeting
B Obtain plans, current zoning, existing landuse from City
C Obtain approved site topography and plans from NCH, adjacent sites and City
D Obtain and plot City topography
E Site visit, including photographs
F Merge site plans/topography and city topography to create basemap
G Create location map
II. Surveys
A Miscellaneous surveys of drainage structures in the study area
B Extend FEMA benchmark to study area
!I1. Drainage & Flood Plain Analysis
A
1
2
3
4
5
6
7
8
Hydrology
Research effective fully developed (FD) landuse hydrologic model
Locate 'best' electronic files in archives, execute, plot
Compare 1 and 2
Rcvisc model with added detail in upstream reaches
Debug, execute, plot results for 2- & 100-year flood discharges
Revise hydrology model for existing landuse
Debug, execute, plot results for 2- & 100-year flood discharges
Compare computed discharges with previous studies
III
· -- Halff Associates
ENGINEERS · ARCHH'ECTS · SCIENTISTS
PL:XNNERS · SURVF?~'()RS
City of Coppell
NCH Corporation
October 13, 1998
Page 4
B
1
2
3
4
5
5
6
C
1
2
3
D
Hydraulics
Identify effective stream hydraulics model from City
Locate 'best' electronic files, execute, plot
Compare 1 and 2
Extend existing conditions models per surveys and topographic map
Incorporate fully devcloped and existing landuse discharges
Execute, debug, plot revised model
Compare to existing models - tables of water surface elevations and velocity
Mapping
Delineate 100-year flood plain based on fully developed landuses in the watershed
Delineate subdrainage areas and discharges
Add flood plain and baseline drainage information to basemap
Mcet with Owner(s) and City
IV. Drainage Master Plan
A Formulate General Alternatives
1 Establish targets for detention alternative
a. Alternative 1- limit mnoffrate from developed sites to predevelopment rates
b. Alternative 2- limit runoffrate from developed sites to that from a landuse less intense
that industrial (i.e. Single Family Residential)
2 Confirm conventional drainage criteria
3 Evaluate diversion possibilities
4 Evaluate permitting requirements
5 Meet with Owner and City
g NCH and Adjoining Coppell Industrial N. V. Site
1 Conceptual design of conventional system
2 Conceptual design of detention alternatives
3 Conceptual design of combination systems
4 Exhibits
5 Cost estimates
6 Assess downstream impacts
C Bethel Road Area
1 Conceptual design- conventional Bethel storm sewer
2 Conceptual design of Bethel storm sewer with detention in upstream basin
· -- Halff Associates
Ill
EN(;INEERS · AR('IIITECTS · SCIENTISTS
PLANNERS · S[:RVEYORS
City of Coppell
NCH Corporation
October 13, 1998
Page 5
3
4
5
D
1
2
3
4
Exhibits
Cost estimates
Assess downstream impacts
Recommendations
Outline preliminary recommendations
Internal peer review meeting
Finalize recommendations
Meet with Owner(s) and City
IV. Study Report/Documentation
A Report
1 Write report
2 Assemble and bind 10 copies
B Compile electronic files of report and exhibits
C Deliver reports and electronic files to Owner(s) and City
· -- Halff Associates
[!N(iINEERS · ARCHITECTS · SCIENTISTS
PI.ANNERS · SI~RVI?/ORS
City of Coppell
NCH Corporation
October 13, 1998
Page 6
EXHIBIT B
Fee Breakdown
Drainage Master Plan Study- NCH Site, Coppell Industrial N. V. Site and Related
Areas Along Bethel Road in the Stream G1 Watershed in Coppell, TX
Task Fee Breakdown
I. Data Acquisition/Base Map Preparation
II. Surveys
III. Drainage and Flood Plain Analysis
IV. Drainage Master Plan
V. Study Report/Documentation
$ 3,486
$ 1,850
$ 16,145
$ 19,118
$ 4,401
Lump Sum Total $ 45,000
Halff Associates
}iN(;1Nt~ERS · AR('HITECTS · SCIENTISTS
PLANNI~RS · SURVISYORS
City of Coppell
NCH Corporation
October 13, 1998
Page 7
EXHIBIT C
Schedule
Drainage Master Plan Study- NCH Site, Coppell Industrial N. V. Site and Related
Areas Along Bethel Road in the Stream G1 Watershed in Coppell, TX
Task
Notice to Proceed
Kickoff Meeting
Data Collection
Survey
Drainage and Flood Plain Analysis
Drainage Master Plan
Report
Completion Date
10/25/98
10/26/98
10/28/98
11/09/98
12/09/98
1/21/99
1/28/99
Note: Schedule is flexible and can be adjusted within reason to meet the needs of the study
participants
Halff Associa
F~NGINF. ERS - \I~.CHITECTS · SCIENTISTS
PI.,\NNI~RS ·
[es
36!6 NORTHWEST PLAZA DRIVE
DALLAS, TEXAS 75225
i214~ 739-0094
FAX ~214) 739-0095
October 14, 1998
P9436 WO22
Don Moulton, PE
NCH Corporation
2727 Chemsearch Boulevard
Irving, Texas 75062
James Witt, City Manager
City of Coppell
PO Box 478
255 Parkway Blvd.
Coppell, Texas 75019
Drainage Master Plan Study- NCH Site, Coppell Industrial N. V. Site and Related Areas
in Coppell, TX
Dear Mr. Moulton and Mr. Witt:
Halff Associates is pleased to present this fee proposal for engineering services to prepare a
Master Drainage Plan for the NCH site, the 100 acre site west of the NCH site owned by Coppell
Industrial N. V. and adjoining areas along Bethel Road in Coppell, Texas. This area is located
xvithin the drainage basin of Stream Gl. Generally, the services will consist of conceptual
drainage design, stream hydrology and hydraulics as necessary to develop and document a
Drainage Master Plan.
The entire engineering effort described in this proposal can be completed for a lump sum fee of
$45,000. The City of Coppell's share of this fee is $15,000, with NCH and other cooperating
land owners responsible tbr the remaining lump sum fee. Should the study cost exceed $45,000
due to project scope changes and/or additions requested bv the property owners, the additional
costs ~vill be born by the participating property owners and the City of Coppell's share xvill
remain capped at $15,000. A detailed work plan is attached as Exhibit A and a breakdown of the
engineering fee is included as Exhibit B. Separate invoices will submitted on a monthly basis to
the City of Coppell for their portion of the fee and to NCH for the participating property owners
portion of the tee. Invoices will be based on percent complete of the project tasks outlined in
Exhibit B. A suggested schedule is shown on Exhibit C.
Please call me at 214/346-6220 if you have any questions. We look forward to assisting you and
the City of Coppell xvith this important project. If this proposal meets with your approval, please
sign and return one copy to our office to indicate your authorization of the scope of work and fee
and our notice to proceed. Counterpart signatures are acceptable.
DALLAS · FORT'NORTH · HOUSTON · McALLEN
TRANSPORTATION · WATER RESOURCES · LAND DEVELOPMENT ' MUNICIPAL · ENVIRONMENTAL · STRLJCTURAL
~'IECHANICAL · ELECTRICAL · SURVEYING · GEOGRAPHICIr'qFORMAT~CN S'/STEblS
a, RCHITECTURE · LANDSCAPE ARCHITECTURE · PLANNING
· I, Halff Associates
L:NGINEERS . \RCHITECTS · SCIENTISTS
PL,\NNERS · SURVEYORS
NCH Corporation
City of Coppell
October 14, 1998
Page 2
Sincerely,
HALFF ASSOCIATES, INC.
Walter E. Skipwith, PE
Vice President
DATE: ,_
City of Copper
APPROVED:
BY:
DATE:
Halff Associates
ENGINEERS · .\RCHITECTS · SCIENTISTS
PLANNERS · 5~ RVEYORS
City of Coppell
NCH Corporation
October 13, 1998
Page 3
EXHIBIT A
Scope of Work
Drainage Master Plan Study- NCH Site, Coppell Industrial N. V. Site and Related
Areas Along Bethel Road in the Stream G1 Watershed in Coppell, TX
I. Data Acquisition/Basemap Preparation
A
B
C
D
E
F
G
Kicko fi' meeting
Obtain plans, current zoning, existing landuse from City
Obtain approved site topography and plans from NCH, adjacent sites and City
Obtain and plot City topography
Site visit, including photographs
Merge site plans/topography and city topography to create basemap
Create location map
II. Surveys
A
B
Miscellaneous surveys of drainage structures in the study area
Extend FEMA benchmark to study area
III. Drainage & Flood Plain Analysis
A
1
3
4
5
6
7
8
Hydrology
Research effective fully developed (FD) landuse hydrologic model
Locate 'best' electronic files in archives, execute, plot
Compare l and 2
Revise model xvith added detail in upstream reaches
Debug, execute, plot results t~or 2- & 100-year flood discharges
Revise hydrology model for existing landuse
Debug, execute, plot results t'or 2- & 100-year flood discharges
Compare computed discharges with previous studies
Halff Associates
ENGINEERS · -\RCItlTt!CTS - SCIENTISTS
PL,\NNERS · St ItVEYORS
City of Coppell
NCH Corporation
October 13, 1998
Page 4
B Hydraulics
1 Identify effective stream hydraulics model from City
2 Locate 'best' electronic fides, execute, plot
3 Compare 1 and 2
4 Extend existing conditions models per surveys and topographic map
5 Incorporate fully developed and existing landuse discharges
5 Execute, debug, plot revised model
6 Compare to existing models - tables of water surface elevations and velocity
C Mapping
1 Delineate 100-year flood plain based on fully developed landuses in the watershed
2 Delineate subdrainage areas and discharges
3 Add flood plain and baseline drainage information to basemap
D Meet with Owner(s) and City
IV. Drainage Master Plan
A
1
5
B
1
3
5
6
C
1
Formulate General Alternatives
Establish targets for detention alternative
a. Alternative 1- limit runoff rate from developed sites to predevelopment rates
b. Alternative 2- limit runoff rate from developed sites to that from a landuse less intense
that industrial (i.e. Single Family Residential)
Confirm conventional drainage criteria
Evaluate diversion possibilities
Evaluate permitting requirements
Meet ~vith Owner and City
NCH and Adjoining Coppell Industrial N. V. Site
Conceptual design of conventional system
Conceptual design of detention alternatives
Conceptual design of combination systems
Exhibits
Cost estimates
Assess downstream impacts
Bethel Road Area
Conceptual design- conventional Bethel storm sewer
Conceptual design of Bethel storm sewer ~vith detention in upstream basin
Halff Associates
ENGINEERS · ~XRCHITECTS · SCIENTISTS
PI.,\NNERS · SUR\,'E'f()RS
City of Coppell
NCH Corporation
October 13, 1998
Page 5
3 Exhibits
4 Cost estimates
5 Assess downstream impacts
D Recommendations
1 Outline preliminary recommendations
2 Internal peer review meeting
3 Finalize recommendations
4 Meet with Owner(s) and City
IV. Study Report/Documentation
A
1
2
B
C
Report
Write report
Assemble and bind 10 copies
Compile electronic files of report and exhibits
Deliver reports and electronic files to Owner(s) and City
Halff Associates
ENGINEERS · ..\RCIflTECTS - SCIENTISTS
PLANNERS · StiR\"EYORS
City of Coppell
NCH Corporation
October 13, 1998
Page 6
EXHIBIT B
Fee Breakdown
Drainage Master Plan Study- NCH Site, Coppell Industrial N. V. Site and Related
Areas Along Bethel Road in the Stream G1 Watershed in Coppell, TX
Task Fee Breakdo~vn
I. Data Acquisition/Base Map Preparation
II. Surveys
III. Drainage and Flood Plain Analysis
IV. Drainage Master Plan
V. Study Report/Documentation
$ 3,486
$ 1,850
$ 16,145
$ 19,118
$ 4,401
Lump Sum Total $ 45,000
Halff Associates
ENGINEERS · \RCHITECTS · SCIENTISTS
PL,\NNERS · SURVEYORS
City of Coppetl
NCH Corporation
October 13, 1998
Page 7
EXHIBIT C
Schedule
Drainage Master Plan Study- NCH Site, Coppell Industrial N. V. Site and Related
Areas Along Bethel Road in the Stream G1 Watershed in Coppell, TX
Task
Notice to Proceed
Kickoff Meeting
Data Collection
Survey
Drainage and Flood Plain Analysis
Drainage Master Plan
Report
Completion Date
1 O/25/98
1 O/26/98
10/28/98
11/09/98
12/09/98
1/21/99
1/28/99
Note: Schedule is flexible and can be adjusted within reason to meet the needs of the study
participants