Loading...
Gateway BP(1.4)-LR061207ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT Placing Drawings Approved X Bar Length and Shape X Column Tie Spacing Type Bar Size X Proper Bar Placement X Stirrup Spacing Type Bar Grade X Properly Tied X Welded Splices Rebar Clean X Dowel Bars in Place X Mechanical Splices Trash Debris Removed X Proper Bar Supports X Lapped Splices X Number of Bars X Proper Cover /Clearance X REPORT OF REINFORCING STEEL OBSERVATION Date of Service: 12/07/06 Report No.: 94061357.0016 Client No.: 72873 Project No.: 94061357 Client: Hill Wilkinson LTD Project: Haverty Pavement Expansion 800 Klein Rd Ste 100 770 Gateway Blvd. Plano, TX 75074 Coppell, TX Services: Observe placement of reinforcing for compliance with furnished drawings. PROJECT DATA Drawings Utilized: Civil, C2.01 /C2.01, dated 10/03/06 Locations /Items Observed: Paving, refer to attached sketch Test Method: Field Results Report To: Technician: Report Distribution: (1) Hill Wilkinson LTD (1) Halff Assoc Inc (1) City of Coppell TX 309pdr J. Rojas Visual Observation REPORT OF OBSERVATION Discrepancies /Comments: No discrepancies found were corrected prior to completion of this observation. (1) Haverty Furniture Co Inc arty This report is exclusively for the use of the client indicated above and shall not be reproduced without written approval of Terracon. lierracon Consulting Engineers Scientists 8901 Carpenter Frwy., Suite 9 100 Dallas, Texas 75247 (214) 630 -1010 Hussein H. Abusaad, P.E. Senior Project Manager o o 7.0 X 1- VAA. :Di \HIS: X 3 ("dila) INIOr NOISNVdX3 73 0 .:"C ?0 Terracon Report No. 94061357.0016 Dated 12/07/2006 (Haverty Pavement Expansion) o 0 0 ;t7 1 I 1VA0113: y