Loading...
DR9802-PR 981012ll Halff Associates ENGINEERS ' ARCHITECTS ° SCIENTISTS PLANNERS * SURVEYORS October 12, 1998 1010 Don Moulton, PE NCH Corporation 2727 Chemsearch Boulevard Irving, Texas 75062 8616 NORTHWEST PLAZA DRIVE DALLAS, TEXAS 75225 FAX (2~4) 739-0095 RE: Drainage Master Plan Study- NCH Site and Related Areas in Coppell, TX Dear Mr. Mouiton: Halff Associates is pleased to present this fee proposal for engineering services to prepare a Master Drainage Plan for the NCH site and adjoining areas in Coppell, Texas. Generally, the services will consist of conceptual drainage design, stream hydrology and hydraulics as necessary to develop and document the Master Plan. The entire engineering effort can be completed for a lump sum fee of $45,000. A detailed work plan is attached as Exhibit A and a breakdown of the engineering fee is included as Exhibit B. A suggested schedule is shown on Exhibit C. Please call me at 214/346-6220 if you have any questions. We look forward to assisting you and the City of Coppell with this important project. If this proposal meets with your approval, please sign and return one copy to our office to indicate your authorization of the scope of work and fee and our notice to proceed. Sincerely, HALFF ASSOCIATES, INC. Walter E. Skipwith, PE Vice President APPROVED: BY: DATE: TRANSPORTATION · WATER RESOURCES · LAND DEVELOPMENT * MUNICIPal. · ENVIRONMENTAL * STRUCTURAL MECHANICAL * ELECTRICAL ° SURVEYING * GEOGRAPHIC INFORMATION SYSTEMS ARCHITECTURE o LANDSCAPE ARCHITECTURE ° PLANNING I I Ill · -- Halff Associates lll ENGINEERS · ARCHITECTS · SCIENTISTS PLANNERS ° SURVEYORS Don Moulton, PE NCH Corporation October 12, 1998 Page 2 EXHIBIT A Scope of Work Drainage Master Plan Study- NCH and Related Areas in Coppell, TX I. Data Acquisition/Basemap Preparation A Kickoff meeting B Obtain plans, current zoning, existing landuse l¥om City C Obtain approved site topography and plans from NCH, adjacent sites and City D Obtain and plot City topography E Site visit, including photographs F Merge site plans/topography and city topography to create basemap G Create location map II. Surveys A B Miscellaneous surveys of drainage structures in the study area Extend FEMA benchmark to study area Ill. Drainage & Flood Plain Analysis A Hydrology 1 Research effective fully developed (FD) landuse hydrologic model 2 Locate 'best' electronic files in archives, execute, plot 3 Compare 1 and 2 4 Revise model with added detail in upstream reaches 5 Debug, execute, plot results for 2- & 100-year flood discharges 6 Revise hydrology model for existing landuse 7 Debug, execute, plot results for 2- & 100-year flood discharges 8 Compare computed discharges with previous studies Halff Associates ENGINEERS · ARCHITECTS · SCIENTISTS PLANNERS · SURVEYORS Don Moulton, PE NCH Corporation October 12, 1998 Page 3 B Hydraulics 1 Identify effective stream hydraulics model from City 2 Locate 'best' electronic files, execute, plot 3 Compare 1 and 2 4 Extend existing conditions models per surveys and topographic map 5 Incorporate fully developed and existing landuse discharges 5 Execute, debug, plot revised model 6 Compare to existing models - tables of water surface elevations and velocity C Mapping 1 Delineate 100-year flood plain based on fully developed landuses in the watershed 2 Delineate subdrainage areas and discharges 3 Add flood plain and baseline drainage information to basemap D Meet with Owner(s) and City IV. Drainage Master Plan 2 3 4 5 B 1 2 3 4 5 6 C 1 2 A 1 Formulate General Alternatives Establish targets for detention alternative a. Alternative 1- limit runoffrate from developed sites to predevelopment rates b. Alternative 2- limit runoff rate from developed sites to that from a landuse less intense that industrial (i.e. Single Family Residential) Confirn~ conventional drainage criteria Evaluate diversion possibilities ~ ~ ~ Evaluate pern~itting requirements Meet with Owner and City NCH and Adjoining Site Conceptual design of conventional system Conceptual design of detention alternatives Conceptual design of combination systems Exhibits Cost estimates Assess downstream impacts Bethel Road Area Conceptual design- conventional Bethel storm sewer Conceptual design of Bethel storn~ sewer with detention in upstream basin Ill · -. Halff Associates ENGINEERS ° ARCHITECTS - SCIENTISTS PLANNERS ° SURVEYORS Don Moulton, PE NCH Corporation October 12, 1998 Page 4 3 4 5 D 1 2 3 4 Exhibits Cost estimates Assess downstream impacts Recommendations Outline preliminary recommendations Internal peer review meeting Finalize recommendations Meet with Owner(s) and City IV. Study Report/Documentation A 1 2 B C Report Write report Assemble and bind 10 copies Compile electronic files of report and exhibits Deliver reports and electronic files to Owner(s) and City Ill · ,, Halff Associates llffi ENGINEERS · ARCHITECTS · SCIENTISTS PLANNERS ° SURVEYORS Don Moulton, PE NCH Corporation October 12, 1998 Page 5 EXHIBIT B Fee Breakdown Drainage Master Plan Study- NCH and Related Areas in Coppell, TX Task I. Data Acquisition/Base Map Preparation II. Surveys III. Drainage and Flood Plain Analysis IV. Drainage Master Plan V. Study Report/Documentation Fee Breakdown $ 3,486 $ 1,850 $ 16,145 $ 19,118 $ 4,401 Lump Sum Total $ 45,000 Halff Associates ENGINEERS · ARCHITECTS · SCIENTISTS PLANNERS · SURVEYORS ' Don Moulton, PE NCH Corporation October 12, 1998 Page 6 EXHIBIT C Schedule Drainage Master Plan Study- NCH and Related Areas in Coppell, TX Task Notice to Proceed Kickoff Meeting Data Collection Survey Drainage and Flood Plain Analysis Drainage Master Plan Report Completion Date 10/25/98 1 O/26/98 10/28/98 11/09/98 12/09/98 1/21/99 1/28/99