Vista Point 2R-LR061128 REED EnGinEERinG GEOTECHNICAL AND G R 0 U P ENVIRONMENTAL CONSULTANTS REPORT OF REINFORCING STEEL PLACEMENT OBSERVATION Vista Point II, Phase II S.H. 121 at MacArthur Boulevard Coppell, Texas REPORTED TO: Bullard Construction, Inc. P.O. Box 575 Addison, Texas 75001 ATTN: Mr. Keith McMahon REPORT NO. 65 REPORT DATE: 11-28-06 REG PROJECT NO. 13581 DATE OBSERVED: 11-09-06 TECHNICIAN: J. Seeton PAGE: 1 of 1 CONTRACTOR: Bullard Construction, Inc. I Items Observed: I Paving: 50' to 90'N from 0-100'E and 0-440'W from the N.E. corner of Building 5 I Reference Plans or Notes Used: I Sheet C6.1 I Comments: I Redwood joint not in-place at the time of observation. The noted deviations were reported to: Superintendent x IThere were no deviations noted. The reinforcing steel placed at the above referenced locations was observed with respect to the referenced portions of the contract documents. Extranet Distribution: (1) Jackson Shaw Company/ Mr. Christopher Gardner (1) AECC, Inc./Mr. Todd Waters (1) Jackson Shaw Company Ms. Michelle Graham Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Mail Distribution: (1) Bullard Construction, Inc./ Mr. Keith McMahon (1) City of Coppell/Mr. Keith Marvin Ronald F. Reed, P.E. BW /mg 2424 STUTZ DR. . SUITE 400 . DALLAS TX 75235 . El [214J 3505600 . If.X [214] 3500019 REED I EnGinEERinG ___~______.... m___ ______~._ ___ GEOTECHNICAL AND IG R 0 U P ENVIRONMENTAL CONSULTANTS REPORT OF REINFORCING STEEL PLACEMENT OBSERVATION Vista Point II, Phase II S.H. 121 at MacArthur Boulevard Coppell, Texas REPORTED TO: Bullard Construction, Inc. P.O. Box 575 Addison, Texas 75001 A TTN: Mr. Keith McMahon REPORT NO. 66 REPORT DATE: 11-28-06 REG PROJECT NO. 13581 DATE OBSERVED: 11-10-06 TECHNICIAN: M. Wood PAGE: 1 of 1 CONTRACTOR: Bullard Construction, Inc. I Items Observed: I Paving: 50-90'N, 0-100'W from the N.W. corner of Building 5 and 0-440'W of the N.E. corner of Building 5. I Reference Plans or Notes Used: I Sheet C6.1 I Comments: I Installation of construction joints not completed. x IThere were no deviations noted. The reinforcing steel placed at the above referenced locations was observed with respect to the referenced portions of the contract documents. Extranet Distribution: (1) Jackson Shaw Company/ Mr. Christopher Gardner (1) AECC, Inc./Mr. Todd Waters (1) Jackson Shaw Company Ms. Michelle Graham Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Mail Distribution: (1) Bullard Construction, Inc./ Mr. Keith McMahon (1) City of Coppell/Mr. Keith Marvin Ronald F. Reed, P.E. BW/mg n+-__ 2424 STUTZ DR. . SUITE 400 . DALLAS. TX 75235 . ILL [214] 3505600 . 1;,X [214] 3500019 _R.e:==_~D I EnGinEERinG GEOTECHNICAL AND G R 0 U P ENVIRONMENTAL CONSULTANTS REPORT OF REINFORCING STEEL PLACEMENT OBSERVATION Vista Point II, Phase II S.H. 121 at MacArthur Boulevard Coppell, Texas REPORTED TO: Bullard Construction, Inc. P.O. Box 575 Addison, Texas 75001 ATTN: Mr. Keith McMahon REPORT NO. 68 REPORT DATE: 11-28-06 REG PROJECT NO. 13581 DATE OBSERVED: 11-14-06 TECHNICIAN: D. Gazley PAGE: 1 of 1 CONTRACTOR: Bullard Construction, Inc. I Items Observed: I Paving: 40'N to 240'S from 25 to 85'E from the N.E. corner of Building 5 and 0 to 280'S from 10 to 140'E from the N.E. corner of Building 6. I Reference Plans or Notes Used: I Sheet C6.1 x IThere were no deviations noted. The reinforcing steel placed at the above referenced locations was observed with respect to the referenced portions of the contract documents. Extranet Distribution: (1) Jackson Shaw Company/ Mr. Christopher Gardner (1) AECC, Inc./Mr. Todd Waters (1) Jackson Shaw Company Ms. Michelle Graham Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Mail Distribution: (1) Bullard Construction, Inc./ Mr. Keith McMahon (1) City of Coppell/Mr. Keith Marvin Ronald F. Reed, P.E. BW/mg 2424 STUTZ DR. . SUITE 400 . DALLAS TX 75235 . TEL [214] 3505600 . FAX [214] 3500019 REED I EnGinEERinG __________ _____________________ ______~._-.--_-.---_- _____n_m______ GEOTECHNICAL AND I G R 0 U P ENVIRONMENTAL CONSULTANTS I REPORT OF REINFORCING STEEL PLACEMENT OBSERVATION Vista Point II, Phase II S.H. 121 at MacArthur Boulevard Coppell, Texas , REPORTED TO: Bullard Construction, Inc. P.O. Box 575 Addison, Texas 75001 ATTN: Mr. Keith McMahon REPORT NO. 69 REPORT DATE: 11-28-06 REG PROJECT NO. 13581 DATE OBSERVED: 11-18-06 TECHNICIAN: D. Decuir PAGE: 1 of 1 CONTRACTOR: Bullard Construction, Inc. I Paving: 10 to 136'S, 0 to 40'E and 40 to 240'N and 10 to 132'S, 132 to 216'W from the S.E. corner of Building 6. I Reference Plans or Notes Used: I Sheet C6.1 I Items Observed: lUst Deviations Noted: 11) Dowel bars were missing end caps. x IThe noted deviation was corrected. The reinforcing steel placed at the above referenced locations was observed with respect to the referenced portions of the contract documents. Extranet Distribution: (1) Jackson Shaw Company/ Mr. Christopher Gardner (1) AECC, Inc./Mr. Todd Waters (1) Jackson Shaw Company Ms. Michelle Graham Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Mail Distribution: (1) Bullard Construction, Inc./ Mr. Keith McMahon (1) City of Coppell/Mr. Keith Marvin Ronald F. Reed, P.E. BW/mg 2424 STUTZ DR. . SUITE 400 . DALLAS. TX 75235 . I" [214] 3505600 . "'.X [214J 3500019 REED EnGinEERinG GEOTECHNICAL AND G R 0 U P ENVIRONMENTAL CONSULTANTS REPORT 0 D DENSITY TESTS ta Point II, Phase II . . 121 at MacArthur Boulevard Coppell, Texas .. ~JItl; REPORTED TO: Bullard Construction, Inc. P.O. Box 575 Addison, Texas 75001 ATTN: Mr. Keith McMahon REPORT NO. 67 REPORT DATE: 11-28-06 REG PROJECT NO. 13581 TECHNICIAN: P. Becerra PAGE: 1 of 1 CONTRACTOR: Bullard Construction, Inc. Proctor ASTM Optimum No. Standard Descri tion Moisture, % 1 0-698 Brown sandy clay w/rock 12.3 2 0-698 Dark gray clay 27.5 3 0-698 Dark brown sandy clay (lime-treated) 22.8 4 0-698 Brown sandy clay w/aggregate (Iime- 18.1 treated) 5 0-698 Brown cia lime-treated 21.8 98.6 Depth Below Field Field Test Final S. G. Density Moisture Proctor Com paction No. Date Location feet c % 10 Level % 101 11-10-06 Paving: 101'S, 88'E(1) 0.0 107.2 15.8 1 97.1 102 Paving: 20'S, 90'E(1) 0.0 106.0 16.0 1 96.1 103 Paving: 101 'S, 80'E(1) 0.0 107.5 15.2 1 97.4 104 Paving: 20'S, 98'E(2) 0.0 108.0 14.5 1 97.9 105 Fire Lane: 40'S, 60'E(3) 0.0 106.2 17.1 1 96.2 106 Fire Lane: 5'5, 300'E 3 0.0 108.5 15.2 1 98.3 Comments: Where tested, materials were in compliance with project specifications. Extranet Distribution: Measurements referenced from N.E. corner of Building 5. Measurements referenced from S.E. corner of Building 6. Measurements referenced from s.~ co~.~ Building 4. \ Z 11 '1J'flmitled by REED ENGINEERING GROUP, LTD. Footnotes: (1) (2) (3) (1) Jackson Shaw Companyl Mr. Christopher Gardner (1) AECC, Inc.lMr. Todd Waters (1) Jackson Shaw Company Ms. Michelle Graham Original Signed By Mail Distribution: (1) Bullard Construction, Inc.l Mr. Keith McMahon (1) City of Coppell/Mr. Keith Marvin Bill Woolwine Sr. Manager, CMT BW/mg 2424 STUTZ DR. . SUITE 400 . DALLAS. TX 75235 . TEl [214] 3505600 . FAX [214J 3500019 REED EnGinEERinG GEOTECHNICAL AND G R 0 U P ENVIRONMENTAL CONSULTANTS ",.,- CONCRETE CYLINDER TEST REPORT .... Vista Point II, Phase II ~. 121 at MacArthur Boulevard Coppell, Texas REPORTED TO: Bullard Construction, Inc. P.O. Box 575 Addison, Texas 75001 ATTN: Mr. Keith McMahon REPORT NO. 55 REG PROJECT NO. 13581 SAMPLE DATE: 10-31-06 TECHNICIAN: T. Miller PAGE: 1 of 1 CONTRACTOR: Bullard Construction, Inc. Location of Sam Set Number 1 Desi n Information Source of Concrete Beall Mix Identification 83001501 ecified Stren 3000 Date Tested 11-07-06 11-28-06 11-28-06 Hold Age@ Test 7 28 28 H Total Load Ibs. 119610 146720 145080 5160 Air Entrainment 1.0 Ticket Number 89058966 Extranet Distribution: (1) Jackson Shaw Company/ Mr. Christopher Gardner (1) AECC, Inc./Mr. Todd Waters Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Mail Distribution: (1) Bullard Construction, Inc./ Mr. Keith McMahon (1) City of Coppell/Mr. Keith Marvin Mickey Lawson Assistant Manager, CMT ML/lnc 2424 STUTZ DR. . SUITE 400 . DALLAS. TX 75235 . TEL [214] 350 5600 . FAX [214] 350 0019 REED EnGinEERinG GEOTECHNICAL AND G R 0 U P ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Vista Point II, Phase II S.H. 121 at MacArthur Boulevard Cappel!, Texas REPORTED TO: Bullard Construction, Inc. P.O. Box 575 Addison, Texas 75001 ATTN: Mr. Keith McMahon REPORT NO. 56 REG PROJECT NO. 13581 SAMPLE DATE: 10-31-06 TECHNICIAN: T. Miller PAGE: 1 of 1 CONTRACTOR: Bullard Construction, Inc. Location of Sam Ie Set Number Location 1 Panel: 48 Mix Identification 24011501 ecified Stren 4000 Date Tested 11-07-06 11-28-06 11-28-06 Hold Age@ Test 7 28 28 H Total Load Ibs. 134640 171750 168080 6020 Air Entrainment 1.0 Ticket Number 89058960 Extranet Distribution: (1) Jackson Shaw Company/ Mr. Christopher Gardner (1) AECC, Inc./Mr. Todd Waters Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Mail Distribution: (1) Bullard Construction, Inc./ Mr. Keith McMahon (1) City of Coppell/Mr. Keith Marvin Mickey Lawson Assistant Manager, CMT MUlnc 2424 STUTZ DR. . SUITE 400 . DALLAS. TX 75235 . TEl [214J 3505600 . FAX [214J 3500019