Vista Point 2R-LR061125
REED I EnGinEERInG
GEOTECHNICAL AND G R Cl U P
ENVIRONMENTAL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
~ :sta Point II, Phase II
,- .. 121 at MacArthur Boulevard
Coppell, Texas
REPORTED TO: Bullard Construction, Inc.
P.O. Box 575
Addison, Texas 75001
A TTN: Mr. Keith McMahon
REPORT NO. 71
REG PROJECT NO. 13581
SAMPLE DATE: 11-18-06
TECHNICIAN: D. Decuir
PAGE: 1 of 2
CONTRACTOR: Bullard Construction, Inc.
location of Sam
Set Number
1
2
3
4
5
Ie
location
Paving: 53'S, 13'W from SE corner of Bldg. 6
Paving: 56'S, 170'E from SW corner of Bldg. 6
Paving: 10'N, 40'E from SE corner of Bldg. 6
Paving: 96'N, 64'E from SE corner of Bldg. 6
Pavin : 40'S, 16'E from SW corner of Bid . 6
Desi n Information
Source of Concrete Mix Identification ecified Stren
Redi-Mix 23601504 3600
Age@ Total load
Date Tested Test Ibs.
11-21-06 3 63660
11-25-06 7 89200
12-16-06 28
12-16-06 28
Hold H
2 8829 11-21-06 3 61000 2160
8829 11-25-06 7 93500 3310
8829 12-16-06 28
8829 12-16-06 28
8829 Hold H
3 8830 11-21-06 3 62620 2220
8830 11-25-06 7 91620 3240
8830 1 2-1 6-06 28
8830 12-16-06 28
8830 Hold H
4 8831 11-21-06 3 67470 2390
8831 11-25-06 7 93350 3300
8831 12-16-06 28
8831 12-16-06 28
8831 Hold H
--------- ~_.
2424 STUTZ DR. . SUITE 400 . DALLAS. TX 75235 . EL [214] 3505600 . FAx[214]3500019
REPORT NO. 71
REG PROJECT NO. 13581
SAMPLE DATE: 11-28-06
PAGE: 2 of 2
Cylinder
ID
8828
8829
8830
8831
8832
Date Tested
11-21-06
11-25-06
12-16-06
12-16-06
Hold
Age@
Test
3
7
28
28
H
Total load
Ibs.
67470
98060
Extranet
Distribution: (1) Jackson Shaw Company/
Mr. Christopher Gardner
(1) AECC, Inc./Mr. Todd Waters
Mail
Distribution: (1) Bullard Construction, Inc./
Mr. Keith McMahon
(1) City of Coppell/Mr. Keith Marvin
Submitted by:
Air
Entrainment
5.3
5.3
4.5
1.4
1.3
Ticket
Number
13675163
13675184
25002652
13675210
13675225
REED ENGINEERING GROUP, LTD.
Original Signed By
Mickey Lawson
Assistant Manager, CMT
ML/lnc