Loading...
Vista Point 2R-LR061125 REED I EnGinEERInG GEOTECHNICAL AND G R Cl U P ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT ~ :sta Point II, Phase II ,- .. 121 at MacArthur Boulevard Coppell, Texas REPORTED TO: Bullard Construction, Inc. P.O. Box 575 Addison, Texas 75001 A TTN: Mr. Keith McMahon REPORT NO. 71 REG PROJECT NO. 13581 SAMPLE DATE: 11-18-06 TECHNICIAN: D. Decuir PAGE: 1 of 2 CONTRACTOR: Bullard Construction, Inc. location of Sam Set Number 1 2 3 4 5 Ie location Paving: 53'S, 13'W from SE corner of Bldg. 6 Paving: 56'S, 170'E from SW corner of Bldg. 6 Paving: 10'N, 40'E from SE corner of Bldg. 6 Paving: 96'N, 64'E from SE corner of Bldg. 6 Pavin : 40'S, 16'E from SW corner of Bid . 6 Desi n Information Source of Concrete Mix Identification ecified Stren Redi-Mix 23601504 3600 Age@ Total load Date Tested Test Ibs. 11-21-06 3 63660 11-25-06 7 89200 12-16-06 28 12-16-06 28 Hold H 2 8829 11-21-06 3 61000 2160 8829 11-25-06 7 93500 3310 8829 12-16-06 28 8829 12-16-06 28 8829 Hold H 3 8830 11-21-06 3 62620 2220 8830 11-25-06 7 91620 3240 8830 1 2-1 6-06 28 8830 12-16-06 28 8830 Hold H 4 8831 11-21-06 3 67470 2390 8831 11-25-06 7 93350 3300 8831 12-16-06 28 8831 12-16-06 28 8831 Hold H --------- ~_. 2424 STUTZ DR. . SUITE 400 . DALLAS. TX 75235 . EL [214] 3505600 . FAx[214]3500019 REPORT NO. 71 REG PROJECT NO. 13581 SAMPLE DATE: 11-28-06 PAGE: 2 of 2 Cylinder ID 8828 8829 8830 8831 8832 Date Tested 11-21-06 11-25-06 12-16-06 12-16-06 Hold Age@ Test 3 7 28 28 H Total load Ibs. 67470 98060 Extranet Distribution: (1) Jackson Shaw Company/ Mr. Christopher Gardner (1) AECC, Inc./Mr. Todd Waters Mail Distribution: (1) Bullard Construction, Inc./ Mr. Keith McMahon (1) City of Coppell/Mr. Keith Marvin Submitted by: Air Entrainment 5.3 5.3 4.5 1.4 1.3 Ticket Number 13675163 13675184 25002652 13675210 13675225 REED ENGINEERING GROUP, LTD. Original Signed By Mickey Lawson Assistant Manager, CMT ML/lnc