Loading...
Vista Point 2R-LR061117 REED EnGinEERInG GEOTECHNICAL AND G R Cl U P ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Vista Point II, Phase II S.H. 121 at MacArthur Boulevard Coppell, Texas REPORTED TO: Bullard Construction, Inc. P.O. Box 575 Addison, Texas 75001 A TTN: Mr. Keith McMahon REPORT NO. 64 REG PROJECT NO. 13581 SAMPLE DATE: 11-10-06 TECHNICIAN: M. Wood PAGE: 1 of 2 CONTRACTOR: Bullard Construction, Inc. location of Sam Set Number 1 2 3 4 5 Ie location Paving: 52'N, 90'W from NW corner of Bldg. 5 Paving: 70'N, 50'W from NW corner of Bldg. 5 Paving: 85'N, 280'W from NE corner of Bldg. 5 Paving: 55'N, 11 O'W from NE corner of Bldg. 5 Pavin : 60'N, 40'W from NE corner of Bid . 5 Mix Identification 23601504 ecified Stren 3600 3 Age@ Total load Date Tested Test Ibs. 11-1 5-06 5 125300 11-17 -06 7 136800 12-08-06 28 12-08-06 28 Hold H 8456 11-1 5-06 5 93580 3310 8456 11-17-06 7 99620 3530 8456 12-08-06 28 8456 12-08-06 28 8456 Hold H 8457 11 -1 5-06 5 97510 3450 8457 11-1 7-06 7 113120 4000 8457 12-08-06 28 8457 12-08-06 28 8457 Hold H 8458 11-1 5-06 5 92470 3270 8458 11-17 -06 7 99970 3540 8458 12-08-06 28 8458 12-08-06 28 8458 Hold H 2 4 2424 STUTZ DR. . SUITE 400 . DALLAS, TX 75235 . TEL [214] 3505600 . FA' [214J 3500019 REPORT NO. 64 REG PROJECT NO. 13581 SAMPLE DATE: 11-10-06 PAGE: 2 of 2 C linder Data Set Cylinder No. ID 1 8455 2 8456 3 8457 4 8458 5 8459 Date Tested 11-15-06 11-17-06 12-08-06 12-08-06 Hold Age@ Test 5 7 28 28 H Total load Ibs. 92110 106720 Extranet Distribution: (1) Jackson Shaw Company/ Mr. Christopher Gardner (1) AECC, Inc./Mr. Todd Waters Mail Distribution: (1) Bullard Construction, Inc./ Mr. Keith McMahon (1) City of Coppell/Mr. Keith Marvin Submitted by: Air Entrainment 2.0 3.0 3.0 3.0 3.0 Ticket Number 89059132 89059148 89059153 89059166 89059177 REED ENGINEERING GROUP, LTD. Original Signed By Mickey Lawson Assistant Manager, CMT ML/lnc REED EnGInEERInG GEOTECHNICAL AND G R Cl U P ENVIRONMENTAL CONSULTANTS REPORT OF FIELD DENSITY TESTS Vista Point II, Phase II S.H. 121 at MacArthur Boulevard Cappel!, Texas REPORTED TO: Bullard Construction, Inc. P.O. Box 575 Addison, Texas 75001 A TIN: Mr. Keith McMahon REPORT NO. 63 REPORT DATE: 11-17-06 REG PROJECT NO. 13581 TECHNICIAN: M. Silvia PAGE: 1 of 1 CONTRACTOR: Bullard Construction, Inc. Proctor ASTM Optimum No. Standard Descri tion Moisture, % 1 0-698 Brown sandy clay w/rock 12.3 2 0-698 Dark gray clay 27.5 3 0-698 Dark brown sandy clay (lime-treated) 22.8 4 0-698 Brown sandy clay w/aggregate (Iime- 18.1 treated) 5 0-698 Brown cia lime-treated 21.8 98.6 Field Field Test Density Moisture Proctor Compaction No. Date location c % ID level % 98 11-03-06 Fire Lane: 50'N, 1 00'W(1) 104.9 13.5 1 95.1 99 Fire Lane: 60'N, 140'E(1) 105.3 15.3 1 95.4 100 Fire Lane: 40'N, 290'E 1 106.2 12.9 1 96.2 Comments: Where tested, materials were in compliance with project specifications. Footnote: (1) Measurements referenced from N.W. corner of Building 5. Extranet Distribution: (1) Jackson Shaw Company/ Mr. Christopher Gardner (1) AECC, Inc./Mr. Todd Waters Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Mail Distribution: (1) Bullard Construction, Inc./ Mr. Keith McMahon (1) City of Coppell/Mr. Keith Marvin Bill Woolwine Sr. Manager, CMT BES/mg 2424 STUTZ DR. . SUITE 400 . DALLAS. TX 75235 . TEL (214] 3505600 . fp.X (214] 350 0019