Loading...
ST9905-EM051003ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST Project Name: Freeport XIV 8 XV Costs Associated w/ City Infrastructure PK No.: 2052-05.217 Improvements Prepared By: Pacheco Koch Consulting Engineers (CAJ) Date: 1013!2005 Paving Costs ~ Item No. Quant. Unit Descri lion Unit Price Total Price Median O enin Decel. Lane 1 485 SY 7" Reinf. Conc. Pavement 3000 si $40.00 $19,400.00 2 485 SY 6" Lime Stabilized Base $6.00 $2 910.00 3 6.55 TN H drated Lime 6°~ $105.00 $687.49 4 300 SF Colored Stam ed Concrete $6.00 $1,800.00 Sidewalk Costs 5 5700 SF 4" Concrete Sidewalk 5' Width $2.80 $15,960.00 6 7 EA Pedestrian Access Rams $500.00 $3,500.00 Sub-Total $44 257.49 Draina a Costs Item No. Quant. Unit Descri lion Unit Price Total Price 7 103 LF 18" Class III Storm Sewer Pie $38.00 $3,914.00 8 55 LF 36" Class III Storm Sewer Pie $75.00 $4,125.00 9 -55 LF 27" Class III Storm Sewer Pie $67.00 $3,685.00 Difference 5440.00 10 300 LF 30" Class III Storm Sewer Pie $68.00 $20,400.00 11 -300 LF 24" Class III Storm Sewer Pie $45.00 $13,500.00 Difference 56,900.00 12 235 LF 27" Class III Storm Sewer Pie $67.00 $15,745.00 13 -235 LF 21"Class III Stonn Sewer Pie $40.00 $9,400.00 Difference 56,345.00 14 305 LF 24" Class III Storm Sewer Pie $45.00 $13,725.00 15 -305 LF 21" Class III Storm Sewer Pie $40.00 $12,200.00 Difference $1,525.00 Sub-Total 519,124.00 The quantities and prices shown hereon are an indication of the Engineers SUB-TOTAL $63,381.49 opinion of probable construction costs associated with the referenced 10% Contingency $6 338.15 project and are NOT a guarantee of individual or total constriction costs. TOTAL 569,719.64