Loading...
TR0301-CS060731 (2) ~eith Marvin - Re: MacArthur Projects ----.-.-.-- _._---_._-_...._--_.._--~._-_._-_._-_. Page 1 I From: To: Date: Subject: Per Birdsall Andy Watson 7/31/20063:04:55 PM Re: MacArthur Projects The problem is with multiple brands and associated programming. As you know it has taken us quite a while to attempt to fully utilize the output functions of our current UPS system and we are still learning. A second system though comparable in function would just complicate/confuse matters in my opinion. On another subject, I have been given two dates and times for a meeting with the "WI-fi guy". Tuesday, Aug. 8 and Thurs. Aug. 10 both at 9am. Let me know the date you prefer and I'll pass it on. Thanks and sorry I couldn't help, Per >>> "Andy Watson" <andy@naztec.com> 07/27/061:00 PM >>> Hello Per, We received the order from Roadway Solutions for the 2 intersection on Sandy Lake. The specification calls for Clary UPS systems. Would you be willing to accept Alpha UPS systems. I have already ordered this equipment, unaware that the spec called out a specific brand. I submitted literature for the brand and model but it was rejected and I wanted to know if you all would be will to accept a different manufacturer for a comparable product. Any help would be appreciated. Thank you for your consideration and have a great day. Sincerely, Andy Watson cc: Glenn Hollowell; Keith Marvin (1 a.C It . I /" .?- ().') ~ ~ : - (;;. 5\.).. . I l' ( -==//-1 ~