Loading...
TR0301-CS060925 I Keith Marvin - Fwd: RE: Controller Upgrades - Ethernet Page 1 I From: To: Date: Subject: Per Birdsall Keith Marvin 9/25/2006 10: 11 : 13 AM Fwd: RE: Controller Upgrades - Ethernet >>> "Andy Watson" <andy@naztec.com> 09/25/06 10:01 AM >>> Hello Per, Attached are the quotes you requested, if you need anything else, please let me know. Thank you very much and have a great day. Sincerely, Andy Watson -----Original Message----- From: Per Birdsall rmailto:Dbirdsall~ci.coDDell.tx.usl Sent: Monday, September 25, 2006 8:07 AM To: andv~naztec.com Subject: Controller Upgrades - Ethernet I need that quote you supplied divided into the projects for which they are intended. Sandy Lake Road (3 controllers)and Macarthur Blvd (2 controllers). I don't know how they are going to implement the change but we need to separate them for accounting on the projects. Thanks, Per Per Birdsall, Traffic Control I Streets Operations Manager City of Coppell 816 S. Coppell Rd. P.O. Box 9478 Coppell, Texas 75019 972-462-5150 972-462-5199 Dbirdsall~ci.coDDell. tx. us cc: Glenn Hollowell I Keith Marvin - copp9256b.xls ~AZTEc,INCORPORATED Page 1 I 820 Park Two Dr. P.O. Box 765 Sugar Land, Texas 77478-0765 Ph: (281) 240-7233 Fax: (281) 240-7238 EMAIL/FAX QUOTA nON To: City of Coppell Attn: Mr. Per Birdsall From: Andy Watson Job: TS2 Ethernet Upgrades for MacArthur Project Date: 25-Sep-06 QUOTE # 0609-A WOll Quantity Product Description Unit Cost Extended 2 Naztec TS2 Ethernet Upgrades for NEW unused controllers only $750.00 $1,500.00 Total $1,500.00 FOB DESTINATION/FREIGHT INCLUDED IN QUOTE This price quotation is valid for 30 days. All quotations are subject to credit approval. Sincerely, Andy Watson Sales Engineer Authorized Representative Signature: Date: I Keith Marvin - copp9256a.xls ~AZTEc,INCORPORATED Page 1 I 820 Park Two Dr. P.O. Box 765 Sugar Land, Texas 77478-0765 Ph: (281) 240-7233 Fax: (281) 240-7238 EMAILIFAX QUOTATION To: City of Coppell Attn: Mr. Per Birdsall From: Andy Watson Job: TS2 Ethernet Upgrades for Sandy Lake Project Date: 25-Sep-06 QUOTE # 0609-A WOIO Quantity Product Description Unit Cost Extended 3 Naztec TS2 Ethernet Upgrades for NEW unused controllers only $750.00 $2,250.00 Total $2,250.00 FOB DESTINATIONIFREIGHT INCLUDED IN QUOTE This price quotation is valid for 30 days. All quotations are subject to credit approval. Sincerely, Andy Watson Sales Engineer Authorized Representative Signature: Date: