Loading...
Belt Line Trade-LR061129 REED I EnGinEERinG GEOTECHNICAL AND I G R 0 U P ENVIRONMENTAL CONSULTANTS CONCR INDER TEST REPORT ine Trade Center Building A 500 E. Belt Line Road Coppell, Texas REPORTED TO: 101 5420 LBJ Freeway, Suite 1275 Dallas, Texas 75240 ATTN: Mr. Chris Parnell REPORT NO. 159 REG PROJECT NO. 13335 SAMPLE DATE: 11-22-06 TECHNICIAN: G. Tsougarakis PAGE: 1 of 1 CONTRACTOR: Raymond Construction n: (1) IDI/Mr. Chris Parnell (1) Raymond Construction/ Mr. David Layne (1) City of Coppell/Mr. Larry Davis (1 ) City of coppell/~ Lee Stone ff \1, -\, .~ (I location of Sam Set Number 1 2 Desi n Information Source of Concrete LMC 2 8991 8991 8991 8991 Ie location Paving: Eastbound Belt Line Rd., 8TA 6+00 Pavin : Eastbound Belt Line Rd., 8T A 9+ 75 Mix Identification 1851 ecified Stren 4500 Date Tested 11-29-06 12-20-06 12-20-06 Hold Age@ Test 7 28 28 H Total load Ibs. 116180 11-29-06 12-20-06 12-20-06 Hold 7 28 28 H 92590 3280 Concrete Temp. 61 65 Air Entrainment 4.6 5.0 Ticket Number 7173531 7173543 Air Temp. 58 62 Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Mickey Lawson Assistant Manager, CMT ML/lnc .- 1-.---. ..-..-- ---._---- --..--+-------- 2424 STUTZ DR . SUITE 400 . DALLAS, TX 75235 . 'EL [214J 3505600 . FAX [214J 3500019