Belt Line Trade-LR061129
REED I EnGinEERinG
GEOTECHNICAL AND I G R 0 U P
ENVIRONMENTAL CONSULTANTS
CONCR INDER TEST REPORT
ine Trade Center Building A
500 E. Belt Line Road
Coppell, Texas
REPORTED TO: 101
5420 LBJ Freeway, Suite 1275
Dallas, Texas 75240
ATTN: Mr. Chris Parnell
REPORT NO. 159
REG PROJECT NO. 13335
SAMPLE DATE: 11-22-06
TECHNICIAN: G. Tsougarakis
PAGE: 1 of 1
CONTRACTOR: Raymond Construction
n: (1) IDI/Mr. Chris Parnell
(1) Raymond Construction/
Mr. David Layne
(1) City of Coppell/Mr. Larry Davis
(1 ) City of coppell/~ Lee Stone
ff \1, -\, .~ (I
location of Sam
Set Number
1
2
Desi n Information
Source of Concrete
LMC
2
8991
8991
8991
8991
Ie
location
Paving: Eastbound Belt Line Rd., 8TA 6+00
Pavin : Eastbound Belt Line Rd., 8T A 9+ 75
Mix Identification
1851
ecified Stren
4500
Date Tested
11-29-06
12-20-06
12-20-06
Hold
Age@
Test
7
28
28
H
Total load
Ibs.
116180
11-29-06
12-20-06
12-20-06
Hold
7
28
28
H
92590
3280
Concrete
Temp.
61
65
Air
Entrainment
4.6
5.0
Ticket
Number
7173531
7173543
Air Temp.
58
62
Submitted by:
REED ENGINEERING GROUP, LTD.
Original Signed By
Mickey Lawson
Assistant Manager, CMT
ML/lnc
.- 1-.---.
..-..-- ---._----
--..--+--------
2424 STUTZ DR . SUITE 400 . DALLAS, TX 75235 . 'EL [214J 3505600 . FAX [214J 3500019