Belt Line Trade-LR061206
REED EnGinEERinG
GEOTECHNICAL AND G R 0 U P
ENVIRONMENTAL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
Belt Line Trade Center Building A
500 E. Belt Line Road
Coppell, Texas
REPORTED TO: 101
5420 LBJ Freeway, Suite 1275
Dallas, Texas 75240
ATTN: Mr. Chris Parnell
REPORT NO. 164
REG PROJECT NO. 13335
SAMPLE DATE: 11-29-06
TECHNICIAN: M. Wood
PAGE: 1 of 1
CONTRACTOR: Raymond Construction
Location of Sam Ie
Set Number Location
1 Slab Leave-out: G-3.5
Mix Identification
1418
ecified Stren
4000
Date Tested
12-06-06
12-27-06
12-27-06
Hold
Age@
Test
7
28
28
H
Total Load
Ibs.
105470
Air
Entrainment
NA
Ticket
Number
7173644
Mail
Distribution: (1) IDI/Mr. Chris Parnell
(1) Raymond Construction/
Mr. David Layne
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
Submitted by:
REED ENGINEERING GROUP, LTD.
Original Signed By
Mickey Lawson
Assistant Manager, CMT
ML/lnc
----L~ . ....
. ---l..--
2424 STUTZ DR. . SUITE 400 . DALLAS, TX 75235 . TEL [214J 3505600 . fAX [214] 3500019