Loading...
Belt Line Trade-LR061204 REED I EnGinEERinG GEOTECHNICAL AND I G R 0 U P ENVIRONMENTAL CONSULTANTS CONCR CYLINDER TEST REPORT ine Trade Center Building A 500 E. Belt Line Road Coppell, Texas REPORTED TO: IDI 5420 LBJ Freeway, Suite 1275 Dallas, Texas 75240 A TTN: Mr. Chris Parnell REPORT NO. 160 REG PROJECT NO. 13335 SAMPLE DATE: 11-27-06 TECHNICIAN: G. Tsougarakis PAGE: 1 of 2 CONTRACTOR: Raymond Construction location of Sam Set Number 1 2 3 Ie location Paving: 30'8, 180'E from 8W bldg. corner Paving: 5'N, 35'W from 8W bldg. corner Pavin : 130'S, 680'E from SW bid . corner Mix Identification 1551 ecified Stren 4000 2 Age@ Total load Date Tested Test Ibs. 12-04-06 7 111250 12-25-06 28 12-25-06 28 Hold H 9016 12-04-06 7 65890 2330 9016 12-25-06 28 9016 12-25-06 28 9016 Hold H 9017 12 -04-06 7 93390 3300 9017 12-25-06 28 9017 12-25-06 28 9017 Hold H 3 ,~'/lf (lit -i-- 2424 STUTZ DR. . SUITE 400 . DALLAS, TX 75235 . TEL [214J 350 5600 . fF, [214J 3500019 REPORT NO. 160 REG PROJECT NO. 13335 SAMPLE DATE: 11-27-06 PAGE: 2 of 2 *Does not meet project specification. Mail Distribution: (1) IDI/Mr. Chris Parnell (1 ) Raymond Construction/ Mr. David Layne (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone Submitted by: Air Entrainment 4.3 *1.5 4.3 Ticket Number 7173573 1410342 7173593 REED ENGINEERING GROUP, LTD. Original Signed By Mickey Lawson Assistant Manager, CMT ML/lnc