Belt Line Trade-LR061204
REED I EnGinEERinG
GEOTECHNICAL AND I G R 0 U P
ENVIRONMENTAL CONSULTANTS
CONCR CYLINDER TEST REPORT
ine Trade Center Building A
500 E. Belt Line Road
Coppell, Texas
REPORTED TO: IDI
5420 LBJ Freeway, Suite 1275
Dallas, Texas 75240
A TTN: Mr. Chris Parnell
REPORT NO. 160
REG PROJECT NO. 13335
SAMPLE DATE: 11-27-06
TECHNICIAN: G. Tsougarakis
PAGE: 1 of 2
CONTRACTOR: Raymond Construction
location of Sam
Set Number
1
2
3
Ie
location
Paving: 30'8, 180'E from 8W bldg. corner
Paving: 5'N, 35'W from 8W bldg. corner
Pavin : 130'S, 680'E from SW bid . corner
Mix Identification
1551
ecified Stren
4000
2
Age@ Total load
Date Tested Test Ibs.
12-04-06 7 111250
12-25-06 28
12-25-06 28
Hold H
9016 12-04-06 7 65890 2330
9016 12-25-06 28
9016 12-25-06 28
9016 Hold H
9017 12 -04-06 7 93390 3300
9017 12-25-06 28
9017 12-25-06 28
9017 Hold H
3
,~'/lf
(lit -i--
2424 STUTZ DR. . SUITE 400 . DALLAS, TX 75235 . TEL [214J 350 5600 . fF, [214J 3500019
REPORT NO. 160
REG PROJECT NO. 13335
SAMPLE DATE: 11-27-06
PAGE: 2 of 2
*Does not meet project specification.
Mail
Distribution: (1) IDI/Mr. Chris Parnell
(1 ) Raymond Construction/
Mr. David Layne
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
Submitted by:
Air
Entrainment
4.3
*1.5
4.3
Ticket
Number
7173573
1410342
7173593
REED ENGINEERING GROUP, LTD.
Original Signed By
Mickey Lawson
Assistant Manager, CMT
ML/lnc