Vista Point 2R-LR061208
REED EnGinEERinG
GEOTECHNICAL AND G R CJ U P
ENVIRONMENTAL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
Vista Point II, Phase II
S.H. 121 at MacArthur Boulevard
Coppell, Texas
REPORTED TO: Bullard Construction, Inc.
P.O. Box 575
Addison, Texas 75001
A TTN: Mr. Keith McMahon
REPORT NO. 75
REG PROJECT NO. 13581
SAMPLE DATE: 12-01-06
TECHNICIAN: C. Johnson
PAGE: 1 of 1
CONTRACTOR: Bullard Construction, Inc.
Location of Sam Ie
Set Number Location
1 Inlet Walls and Bottom: Line ST-3, STA 0+70
Mix Identification
1701
ecified Stren
4000
Date Tested
12-08-06
12-29-06
12-29-06
Hold
Age@
Test
7
28
28
H
Total Load
Ibs.
108420
Air
Entrainment
1.6
Ticket
Number
7173703
Extranet
Distribution: (1) Jackson Shaw Company/
Mr. Christopher Gardner
(1) AECC, Inc./Mr. Todd Waters
(1) Jackson Shaw Company
Ms. Michelle Graham
Submitted by:
REED ENGINEERING GROUP, LTD.
Original Signed By
Mail
Distribution: (1) Bullard Construction, Inc./
Mr. Keith McMahon
(1) City of Coppell/Mr. Keith Marvin
Mickey Lawson
Assistant Manager, CMT
ML/lnc
2424 STUTZ DR. . SUITE 400 . DALLAS. TX 75235 . TEL [214J 3505600 . f;X [214] 3500019