Loading...
Vista Point 2R-LR061208 REED EnGinEERinG GEOTECHNICAL AND G R CJ U P ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Vista Point II, Phase II S.H. 121 at MacArthur Boulevard Coppell, Texas REPORTED TO: Bullard Construction, Inc. P.O. Box 575 Addison, Texas 75001 A TTN: Mr. Keith McMahon REPORT NO. 75 REG PROJECT NO. 13581 SAMPLE DATE: 12-01-06 TECHNICIAN: C. Johnson PAGE: 1 of 1 CONTRACTOR: Bullard Construction, Inc. Location of Sam Ie Set Number Location 1 Inlet Walls and Bottom: Line ST-3, STA 0+70 Mix Identification 1701 ecified Stren 4000 Date Tested 12-08-06 12-29-06 12-29-06 Hold Age@ Test 7 28 28 H Total Load Ibs. 108420 Air Entrainment 1.6 Ticket Number 7173703 Extranet Distribution: (1) Jackson Shaw Company/ Mr. Christopher Gardner (1) AECC, Inc./Mr. Todd Waters (1) Jackson Shaw Company Ms. Michelle Graham Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Mail Distribution: (1) Bullard Construction, Inc./ Mr. Keith McMahon (1) City of Coppell/Mr. Keith Marvin Mickey Lawson Assistant Manager, CMT ML/lnc 2424 STUTZ DR. . SUITE 400 . DALLAS. TX 75235 . TEL [214J 3505600 . f;X [214] 3500019