Loading...
Vista Point 2R-LR061205 REED I EnGinEERinG I GEOTECHNICAL AND G R 0 U P ENVIRONMENTAL CONSULTANTS CONCRETECY TEST REPORT Point II, Phase II . 121 at MacArthur Boulevard Coppell, Texas REPORTED TO: Bullard Construction, Inc. P.O. Box 575 Addison, Texas 75001 A TTN: Mr. Keith McMahon REPORT NO. 74 REG PROJECT NO. 13581 SAMPLE DATE: 11-28-06 TECHNICIAN: Contractor PAGE: 1 of 1 CONTRACTOR: Bullard Construction, Inc. Location of Sam Set Number 1 Mix Identification NA ecified Stren NA Date Tested 12-05-06 12-26-06 12-26-06 Hold Age@ Test 7 28 28 H Total Load Ibs. 92730 Cylinder ID 9098 Air Entrainment NA Ticket Number NA Extranet Distribution: (1) Jackson Shaw Company/ Mr. Christopher Gardner (1) AECC, Inc./Mr. Todd Waters (1) Jackson Shaw Company Ms. Michelle Graham Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Mail Distribution: (1) Bullard Construction, Inc./ Mr. Keith McMahon (1) City of Coppell/Mr. Keith Marvin Mickey Lawson Assistant Manager, CMT ML/lnc 2424 STUTZ DR. . SUITE 400 . DALLAS, TX 75235 . TEL [214] 3505600 I ,,^' '2' ']35000"-- 1-:-