Vista Point 2R-LR061205
REED I EnGinEERinG
I
GEOTECHNICAL AND G R 0 U P
ENVIRONMENTAL CONSULTANTS
CONCRETECY TEST REPORT
Point II, Phase II
. 121 at MacArthur Boulevard
Coppell, Texas
REPORTED TO: Bullard Construction, Inc.
P.O. Box 575
Addison, Texas 75001
A TTN: Mr. Keith McMahon
REPORT NO. 74
REG PROJECT NO. 13581
SAMPLE DATE: 11-28-06
TECHNICIAN: Contractor
PAGE: 1 of 1
CONTRACTOR: Bullard Construction, Inc.
Location of Sam
Set Number
1
Mix Identification
NA
ecified Stren
NA
Date Tested
12-05-06
12-26-06
12-26-06
Hold
Age@
Test
7
28
28
H
Total Load
Ibs.
92730
Cylinder
ID
9098
Air
Entrainment
NA
Ticket
Number
NA
Extranet
Distribution: (1) Jackson Shaw Company/
Mr. Christopher Gardner
(1) AECC, Inc./Mr. Todd Waters
(1) Jackson Shaw Company
Ms. Michelle Graham
Submitted by:
REED ENGINEERING GROUP, LTD.
Original Signed By
Mail
Distribution: (1) Bullard Construction, Inc./
Mr. Keith McMahon
(1) City of Coppell/Mr. Keith Marvin
Mickey Lawson
Assistant Manager, CMT
ML/lnc
2424 STUTZ DR. . SUITE 400 . DALLAS, TX 75235 . TEL [214] 3505600
I
,,^' '2' ']35000"-- 1-:-