Vista Point 2R-LR061129
REED I EnGinEERinG
GEOTECHNICAL AND G R CJ U P
ENVIRONMENTAL CONSULTANTS
CONCRETE CYLlN REPORT
Vis mt II, Phase II
1 at MacArthur Boulevard
Coppell, Texas
REPORTED TO: Bullard Construction, Inc.
P.O. Box 575
Addison, Texas 75001
A TTN: Mr. Keith McMahon
REPORT NO. 72
REG PROJECT NO. 13581
SAMPLE DATE: 11-22-06
TECHNICIAN: J. Seeton
PAGE: 1 of 1
CONTRACTOR: Bullard Construction, Inc.
Location of Sam
Set Number
1
Desi n Information
Source of Concrete
Redi-Mix
Mix Identification
23601504
ecified Stren
3600
Date Tested
11-29-06
12-20-06
12-20-06
Hold
Age@
Test
7
28
28
H
Total Load
Ibs.
103720
Air
Entrainment
3.4
Ticket
Number
13675494
Extra net
Distribution: ('I) Jackson Shaw Company/
Mr. Christopher Gardner
(1) AECC, Inc./Mr. Todd Waters
(1) Jackson Shaw Company
Ms. Michelle Graham
Submitted by:
REED ENGINEERING GROUP, L TO.
Original Signed By
Mail
Distribution: (1) Bullard Construction, Inc./
Mr. Keith McMahon
(1) City of Coppell/Mr. Keith Marvin
Mickey Lawson
Assistant Manager, CMT
ML/lnc
--~
--. --- __ +n______
2424 STUTZ DR_ . SUITE 400 . DALLAS, TX 75235 . TEL [214] 3505600 . FAX [214] 3500019