Loading...
ST9902-CS060925 (2) &u~r;ttdo~ PAVING COMPANY 419 East Highway 80 P.O. Box 270040 Dallas, Texas 75227-0040 Tel (972) 289-0723 Fax (972) 216-5637 September 25,2006 City of Coppell 255 Parkway Coppell, Texas 78019 Attn: Larry Davis Re: West Sandy Lake Road ST 99-02A Request for Change Order Mr. Davis please review the following prices submitted for additional work on the West Sandy Lake Road project. Concrete steps for lead walk on Branchwood - 46 SF @ 19.50 = $ 897.00 Remove excess concrete from existing power pole foundat~ ,)' to allow passage of concrete trail.- n 2 EA@ 750. = 1,500.00 If you need any additional information you may call me at 972-289-0723 Sincerely i~~ Lance Smith Project Administrator &tJb4lec 1974