DR0302-CS 910129IIz -1 I9r J. Sandy Knoll Drive/Shadowcrest Lane Street Flooding 1. Statement of Problem Complaints were logged from city files of street flooding and standing water at the intersection in this intersection on the of Sandy Knoll Drive and Woodhurst Drive. Storm onstant ru noff a ntrance and front of the south side, often curb deep. In addition, water Y stands residence at 510 Shadowcrest Lane immediately eat of Sandy Knoll Drive. During storms this water is often over the curb and is causing erosion to the p 2. Summary of Data The study area is located in Willowood Subdivision and was designed in 1978. Drainage plans for the subdivision were located in city archives �n ration a runoff t coefficien (C) of P 4� bField rational method using a 15 minute time of con reconnaissance of the study area was made on May 9, 1990, June 26, 1990 and October 19, 1990. 3 Analysis of Existing Conditions Storm water runoff was analyzed using current city drainage criteria. A drainage area map Lane is currently was developed for the study area. The intersection n of S RCP Knoll two 10 foot curb The 36 inch RCP drained by a 36 inch diameter reinforced concrete p p flows east 775 feet along the centerline of Shadowcrest the 5 year flood but does not hay stream he capacity necessary current design criteria the existing system will d 5-y ear handle 100 -year storm runoff. The alley be the a Sandy Knoll/Shadowcrest ntersection. inlet was 'Y' inlet located approximately 450 feet east designed to intercept the off -site now from the Knoll alley which has no acces uent the eY' pmnt added a small amount of additional flow to the Sandy contributes to the flooding problem at the alley intersection and Shadowcrest Lane. The street also appears to have experienced significant differential settlement, which contributes to the standing water. Positive overflow was originally to the east into Strea Field inspection at the intersection of Sandy h a ng. oodhurst Drives revealed that this area has also endured differential settlement creating P 4. Proposed Solution The recommended solutions to solve the flooding in this study area include street and drainage improvements as shown n red on Figure VII-10. e have been separated epar ted improvements nto two stages. Stage I includes des the and frequent flooding on Shadowcrest La installation of one 10 foot inlet on each side of ne bo h t sides of the str exis street would also be repllaced. C In The pavement n front of 510 Shadowcrest La ected addition, the inlet lateral on the south side of the street nrStrea vide add rional pacify within the existing d to the existing headwall with a 21 _inch R will P system. The estimated probable cost of Stage I is $222,000. These improvements should remove the constantly standing water and control the frequent street flooding. The Stage II improvements consist of a 14 foot inlet connected to the existing inlet on the west side of Sandy Knoll Drive and two 4 -foot grate inlets at the intersection of the alleys. The grate inlets ■ VII -26 will be connected to the existing 'Y' inlet diverting the additional offsite flow back into the existing 27 -inch RCP. These improvements are estimated to cost $60,000 including removal and replacement of the alley pavement. With the completion of Stage II the Sandy Knoll/Shadowcrest storm sewer system will have 25 -year capacity with positive overflow in the street to Stream G6. The standing water problem at the intersection of Sandy Knoll Drive and Woodhurst Drive can be solved by removing and reconstructing 100 linear feet of pavement at the original design slope of 0.50 percent. The final design should include stabilization of the subgrade with lime or a similar subgrade treatment method. The estimated cost of this improvement is $19,000. The total estimated cost of all the recommended improvements in the Sandy Knoll Drive / Shadowcrest Lane area is $101,000. It is recommended that the pavement repairs at the intersection of Sandy Knoll and Woodhurst Drives and Shadowcrest - Stage I be performed concurrently for a total cost of $41,000. The Shadowcrest Lane area could then be monitored on a regular basis and Stage II scheduled as funds become available. K. Parkwood Channel Parkwood Channel is a .85 mile long tributary of Denton Creek which flows in a northerly direction from a point approximately 700 feet upstream of Moore Road to its confluence with Denton Creek, just downstream of a small lake (See Figure VII -11). The City of Coppell has received complaints regarding erosion problems in the reach of the channel downstream of Parkway Boulevard. The hydraulic analysis revealed potentially erosive velocities in this area (6 -9 fps), especially in light of the sandy soils prevalent along the channel. The recommended design solution for this problem involves lining the existing side slopes for 2000 feet from the lake to the existing lined channel downstream of Parkway Boulevard. The slope would be lined from the existing concrete pilot channel up to an elevation one foot above the fully developed 100 year flood elevation. This solution would not only provide the desired erosion protection but would also greatly reduce the maintenance which the City is currently required to perform. The estimated probable cost for these improvements is $405,000. VII -27 L] j Li L? FIL L 2-, C ITY PP9 L �ll T AN R P STA 4 D. L INL > 0 • 1 ITV ALL 2 -4' GRATE INLETS INSTALL 410 L.F. CLASS 111 27" RCP OEPLACE ALLEY PAVEMENT 'Y' INLET 10' INLETS \ i \ T E Ip P G EX. 24'LAfE IL INSTAL , 21 LATERAL- 0 gi L �' 01 �; RECONSTRUCT 100., F 00 HIHIRQ r%n \,,.�� ALLEY GU % SLOPE ------ j \ \ \\ -J, N FIGURE VII - 10 SITE J SANDY KNOLL DR. & 0 100 200 300 SHADOWCREST LANE SCALE IN FEET DRAINAGE IMPROVEMENTS 0