Freeport NIP(8.1)-CS051003Paving Costs
I Item
No.
Quant.
Unit
Description
Unit
Price
Total Price
1 NCI
485
1
COCOI— CO
Median Openings/Decel. Lane
7" Reinf. Conc. Pavement (3000 psi)
$40.00
$19,400.00
485
6" Lime Stabilized Base
$6.00
$2,910.00
6.55
Hydrated Lime (6
$105.00
$687.49
300
Colored Stamped Concrete
$6.00
$1,800.00
Sidewalk Costs
5
5700
SF
4" Concrete Sidewalk (5' Width)
$2.80
$15,960.00
6
7
EA
Pedestrian Access Ramps
$500.00
$3,500.00
Sub -Total
$44,257.49
!Drainage Costs
Item I
No.
Quant.
Unit
Description
Unit
Price
Total Price
7
103
LF
18" Class III Storm Sewer Pipe
$38.00
$3,914.00
8
55
LF
36" Class III Storm Sewer Pipe
$75.00
$4,125.00
9
-55
LF
27" Class III Storm Sewer Pipe
$67.00
($3,685.00)
$440.00
Difference
10
300
LF
30" Class III Storm Sewer Pipe
$68.00
$20,400.00
11
-300
LF
24" Class III Storm Sewer Pipe
$45.00
($13,500.00)
Difference
$6,900.00
$15,745.00
($9,400.00)
$6,345.00
12
235
LF
27" Class III Storm Sewer Pipe
$67.00
13
-235
LF
21" Class III Storm Sewer Pipe
$40.00
Difference
14
305
LF
24" Class III Storm Sewer Pipe
$45.00
$13,725.00
15
-305
LF
21" Class III Storm Sewer Pipe
$40.00
($12,200.00)
51,525.00
Difference
Sub -Total
519,124.00
The quantities and prices shown hereon are an indication of the Engineer's
opinion of probable construction costs associated with the referenced
nmiert and am NOT a guarantee of individual or total construction costs.
SUB TOTAL
$63,381.49
10% Contingency
$6,338.15
TOTAL
1 569,719.64
ENGINEER'S OPINION OF
PROBABLE CONSTRUCTION COST
Project Name: Freeport XIV XV Costs Associated w/ City Infrastructure
Improvements
Prepared By: Pacheco Koch Consulting Engineers (CAJ)
PK No.: 2052 -05.217
Date:
10/3/2005